Supplier reference centre

Understand Australia's
product requirements.

On this page

Find the laws, approvals, standards and evidence pathways relevant to the products you want to supply.

Start with your product category, read its subcategory, then check the Australian state or territory and the supplier steps below.

Find your product requirements ↓
Illustrative technical review of an inverter model and its supporting documents
Evidence must match the exact product, model and configuration.

How to use this guide

Identify your product

Choose a category and open the exact subcategory. Record the model, variants, electrical ratings, chemistry, capacity, intended use and Australian destination.

Confirm what applies

Read the conditions for each requirement. Separate legal duties, scheme eligibility, network conditions and installation rules. Use the official links to check current requirements.

Prepare the evidence

Obtain the required reports, certificates, registrations, labels and manuals. Resolve unclear requirements with the relevant authority or a qualified specialist before offering the product.

01 / Product-by-product reference

Find your category and subcategory.

Open a category, then a subcategory to see supply steps, installation checks, evidence and standards. Use search for a product name or standard number.

133 subcategories in 18 categories

Open a product category or use the search to load detailed entries. The standards index and shared guidance are available below.

Solar Energy & Photovoltaic Systems 8 subcategories
Battery Energy Storage Systems 8 subcategories
Residential Battery Storage
Commercial & Industrial Battery Storage
Utility-Scale Battery Energy Storage
Containerised Battery Energy Storage Systems
Portable Battery Storage & Power Stations
Battery Modules, Cells & Technologies
Battery Management Systems (BMS)
Battery Racks, Cabinets & Accessories
Inverters & Power Conversion Equipment 8 subcategories
Grid-Connected Solar Inverters
Hybrid Solar Inverters
Off-Grid Inverters & Inverter Chargers
Microinverters & Power Optimisers
Battery Inverters & Bidirectional Converters
Power Conversion Systems (PCS)
DC-DC Converters & Charge Controllers
Power Electronics & Conversion Accessories
Wind Energy Systems 6 subcategories
Hydro Energy Systems 6 subcategories
Hydrogen Energy & Fuel Cell Systems 7 subcategories
Bioenergy & Waste-to-Energy Systems 6 subcategories
Geothermal Energy Systems 5 subcategories
Electric Vehicle Charging & Infrastructure 7 subcategories
Grid, Power Distribution & Microgrids 7 subcategories
Grid Connection & Integration Equipment
Distribution Transformers
Transmission & Distribution Equipment
Substation & Power Distribution Assemblies
Microgrid Electrical Infrastructure
Power Quality & Grid Stabilisation Equipment
Grid Interconnection & Synchronisation Equipment
Electrical Balance of System Components 7 subcategories
Switchgear, Electrical Protection & Safety 7 subcategories
Mounting, Racking & Structural Systems 6 subcategories
Smart Energy, Monitoring & Automation 10 subcategories
Energy Management Systems (EMS)
Smart Energy Metering
Solar & Battery Monitoring Systems
IoT Sensors, Gateways & Remote Telemetry
Industrial & Agricultural Automation
AI Energy Optimisation & Predictive Maintenance
Virtual Power Plant (VPP) Equipment & Controllers
Remote Communications & Connectivity Equipment
Drones, Robotics & Autonomous Inspection Systems
Building & Infrastructure Smart Control Systems
Off-Grid, Hybrid & Remote Power Systems 8 subcategories
Complete Off-Grid Solar Power Systems
Hybrid Solar, Battery & Generator Systems
Remote Community & Station Power Systems
Telecommunications Power & Backup Systems
Mobile & Transportable Power Systems
Emergency & Disaster-Resilience Power Systems
Hybrid Power Controllers & Generator Integration
Remote Industrial & Mining Power Systems
Thermal Energy, Heat Pumps & Energy Efficiency 9 subcategories
Solar Hot-Water Systems
Solar Thermal Collectors & Components
Heat-Pump Hot-Water Systems
Air-Source & Ground-Source Heat Pumps
Commercial & Industrial Heat-Pump Systems
Energy-Efficient HVAC & Ventilation
Energy-Efficient Refrigeration & Cold Storage
Electric Heating & Industrial Electrification
Thermal Energy Storage & Load-Side Efficiency Equipment
Renewable Water, Pumping & Agricultural Systems 8 subcategories
Solar Water Pumping Systems
Bore & Submersible Pumping Systems
Solar Irrigation & Agricultural Water Systems
Livestock Water Supply Systems
Water Storage & Pressure Management Equipment
Water Treatment & Purification Systems
Water Level, Flow & Quality Monitoring
Renewable-Powered Agricultural Infrastructure
Installation Tools, Testing, Spares & Consumables 10 subcategories
Solar & Electrical Installation Tools
Electrical Testing & Inspection Equipment
Battery Testing & Diagnostic Equipment
Commissioning & Maintenance Equipment
Personal Protective Equipment (PPE)
Safety Labels, Signs & Asset Identification
Installation Fasteners, Consumables & Supplies
Replacement Parts & Maintenance Spares
Transport Packaging & Protective Materials
Technical Documentation & Identification Products
02 / Acts, regulations & approval schemes

Understand the responsibility behind the evidence.

These 36 topics bring together consumer law, electrical safety, EMC and radio, imports, dangerous goods, workplace safety, specialist technologies and project permissions. Each topic explains its trigger, legal or scheme pathway, authority and evidence.

Current starting points checked on 25 October 2026

Read the official ACMA supplier steps, EESS equipment-registration requirements, ACCC consumer guarantees and CEC product-list pathways. This targeted check does not revalidate every entry below.

Supply, claims and consumer rights
When it applies

Advertising or supplying goods/services to Australian customers; guarantee provisions depend on consumer and transaction scope.

Acts, regulations or approval scheme

Competition and Consumer Act 2010, Schedule 2 (Australian Consumer Law); corresponding state/territory application laws.

Responsible authority / assessment route

ACCC and state/territory consumer regulators.

Evidence to prepare

Accurate specifications and claims; Australian contact/remedy route; compliant warranty wording; spare-parts and repair arrangements; traceable model/batch.

Consumer safety, recalls and small batteries
When it applies

Consumer goods; additional rules where button/coin batteries are supplied or incorporated.

Acts, regulations or approval scheme

ACL mandatory product standards, bans, recalls and incident reporting.

Responsible authority / assessment route

ACCC Product Safety; electrical regulators for electrical incidents.

Evidence to prepare

Search applicable mandatory standards and recalls; retain test evidence, warnings and incident process. Qualifying serious incidents and consumer recalls have two-day notification duties.

Electrical supply safety and RCM
When it applies

Classify equipment by intended use, supply voltage and current jurisdiction; assess accessories separately.

Acts, regulations or approval scheme

State/territory electrical safety law; EESS where applicable; NSW declared-article pathway where applicable.

Responsible authority / assessment route

State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.

Evidence to prepare

Retain classification/edition decision; responsible supplier registration; Level 1 compliance evidence, Level 2 product registration/compliance folder, Level 3 product registration and recognised certificate as applicable. NSW and WA local approval routes also require assessment. RCM is a compliance mark, not a certificate.

Electronic and radio equipment
When it applies

Electrical/electronic equipment, radios or telecommunications interfaces within ACMA scope.

Acts, regulations or approval scheme

Radiocommunications Act 1992 and applicable labelling/equipment rules; Telecommunications Act 1997 where relevant.

Responsible authority / assessment route

ACMA; responsible supplier; appropriately scoped testing laboratory.

Evidence to prepare

Australian compliance records, declarations, test evidence and labels; spectrum/frequency suitability; assess integrated Wi-Fi, Bluetooth, cellular and other radios.

Electrical installation
When it applies

Product forms part of a fixed or connectable electrical installation.

Acts, regulations or approval scheme

Local electrical safety/licensing laws and adopted installation requirements.

Responsible authority / assessment route

Licensed electrical contractor; local electrical regulator; inspector where required.

Evidence to prepare

Installation manuals, compatibility limits, ratings, commissioning criteria; project installation certificate and inspection record. These are installation obligations, not a product approval certificate.

Network connection and electricity-market participation
When it applies

Connection to a distribution/transmission network, export, microgrid supply or market participation.

Acts, regulations or approval scheme

Network connection conditions; applicable electricity laws; National Electricity Rules in the NEM; separate WA/NT arrangements.

Responsible authority / assessment route

Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.

Evidence to prepare

Connection permission, export/control settings, protection studies and accepted models; generator/integrated-resource registration or documented exemption if required.

PV modules and systems
When it applies

A photovoltaic module or assembly used in a PV installation or scheme-eligible system.

Acts, regulations or approval scheme

CEC product-listing requirements where scheme/network rules require them; applicable installation law.

Responsible authority / assessment route

IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.

Evidence to prepare

Model-specific certificates, reports and labels; confirm active listing and expiry. Existing accepted IEC 61730:2016 listings can continue to their expiry; do not automatically reject them.

Stationary battery storage
When it applies

Stationary battery equipment; distinguish complete system, module/cell, chemistry and size.

Acts, regulations or approval scheme

CEC battery-listing rules when required; electrical safety, installation and local fire/planning conditions.

Responsible authority / assessment route

Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.

Evidence to prepare

System and component safety evidence, compatible configurations, BMS protections, installation constraints, capacity and current listing. In 2026 CEC accepts old guide or TS5398; new applications from 1 January 2027 require TS5398; old-guide listings expire by 31 December 2027.

Dangerous goods transport
When it applies

Battery chemistry, hydrogen, fuels, refrigerants or other cargo classified as dangerous goods.

Acts, regulations or approval scheme

State/territory road/rail dangerous-goods legislation; ADG Code; sea IMDG/Marine Order 41; air ICAO/CASA rules.

Responsible authority / assessment route

Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.

Evidence to prepare

Correct UN entry, test summary where required, transport classification, packaging, marks, quantities and documents for each transport mode. An SDS is not a substitute for battery testing.

Inverters and converters
When it applies

Grid, PV, battery or general power-conversion equipment; determine ports and operating modes.

Acts, regulations or approval scheme

Electrical safety; CEC listing where required; network connection rules.

Responsible authority / assessment route

Electrical regulator/RECS; accepted laboratory; CEC; network.

Evidence to prepare

Full model/firmware identification, port diagram, safety and grid tests, allowed source/load combinations, regional settings and active listing. Battery-only products need the appropriate converter safety route rather than automatic PV-only standards.

Structures, building interfaces and mounting
When it applies

Permanent supports, roofs, foundations, carports, BIPV or machinery supporting equipment.

Acts, regulations or approval scheme

Local planning/building laws; adopted NCC edition and jurisdictional variations.

Responsible authority / assessment route

Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.

Evidence to prepare

Site-specific load calculations, wind region, terrain, corrosion category, fixing/roof compatibility, foundation design, waterproofing and building fire evidence. A generic wind-rating brochure cannot approve a site.

Wind turbine design
When it applies

Small, commercial or utility turbine; offshore systems add marine licensing and design assessment.

Acts, regulations or approval scheme

Electrical and machinery safety; planning/noise/environment approvals; network rules.

Responsible authority / assessment route

Scoped wind certification body/IECRE route to be confirmed; engineer; planning/environment authority; network.

Evidence to prepare

Turbine certification scope, wind class/site suitability, tower/foundation design, loads, noise evidence and electrical performance. Certification does not grant development permission.

Offshore renewable infrastructure
When it applies

Infrastructure in Commonwealth waters or state coastal jurisdiction.

Acts, regulations or approval scheme

Offshore Electricity Infrastructure Act 2021 and regulations in Commonwealth waters; state marine/planning laws otherwise.

Responsible authority / assessment route

Offshore Infrastructure Registrar; Offshore Infrastructure Regulator/NOPSEMA; relevant environment and maritime authorities.

Evidence to prepare

Correct licence category, management-plan approvals, financial security and other required permits; site design and marine safety evidence.

Hydro generation and pumped storage
When it applies

Hydro equipment or project taking/interfering with water or involving dams.

Acts, regulations or approval scheme

Water, dam safety, environmental, planning, electrical and market requirements by jurisdiction.

Responsible authority / assessment route

Water and dam-safety regulator; environmental/planning authority; network; qualified engineer.

Evidence to prepare

Hydraulic/site study, turbine/generator ratings, dam assessment, water entitlements and approvals; accepted electrical protection and connection design.

Hydrogen production, storage and distribution
When it applies

Hydrogen equipment, gas devices, refuelling or operating plant.

Acts, regulations or approval scheme

Relevant gas/petroleum safety, dangerous-goods, WHS/pressure and environmental laws; Queensland Hydrogen Safety Code where applicable.

Responsible authority / assessment route

State gas/petroleum safety regulator; WHS regulator; pressure/gas engineer; recognised hazardous-area certification route.

Evidence to prepare

Pressure/material compatibility, leak detection, ventilation, hazardous-area classification, safety assessment, emergency isolation and accepted installation/certification route. Do not assume natural-gas equipment is hydrogen-compatible.

Fuel cell equipment
When it applies

Fuel cell module or stationary power system.

Acts, regulations or approval scheme

Electrical, gas, pressure, WHS and installation law as applicable.

Responsible authority / assessment route

Electrical/gas regulator; scoped fuel-cell certifier/laboratory; qualified system engineer.

Evidence to prepare

Module/system boundaries, fuel requirements, gas and electrical safety evidence, performance limits and protective systems.

Pressure plant and workplace machinery
When it applies

Pressure vessels/boilers, hazardous plant, workplace machinery and safety systems.

Acts, regulations or approval scheme

Local WHS/OHS legislation; plant design and item registration where prescribed; hazardous chemicals/major hazard facilities if triggered.

Responsible authority / assessment route

State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.

Evidence to prepare

Hazard level, design registration and item registration if required; safe-design dossier, guarding/interlocks, inspection/maintenance instructions and hazardous chemicals data. Registration thresholds vary by jurisdiction.

Biomass, biogas and waste conversion
When it applies

Combustible biomass, digesters, biogas appliances, biofuel processing or waste-to-energy facilities.

Acts, regulations or approval scheme

Gas/plant safety; pollution, waste, planning and dangerous-goods permits. Queensland biogas guidance and Victoria waste permissions are examples.

Responsible authority / assessment route

State gas safety regulator; EPA/environment authority; WHS regulator; engineer; planning authority.

Evidence to prepare

Feedstock compatibility, emissions/odour study, combustion/gas-train safety, waste streams, pressure/chemical assessment and site permits. Fuel-production quality requirements are separate from equipment certification.

Geothermal resources and drilling
When it applies

Geothermal exploration/production or subsurface works; shallow ground-source heat exchange needs separate classification.

Acts, regulations or approval scheme

Resource authority where required; drilling, groundwater, environment and local development laws.

Responsible authority / assessment route

State resources/water/environment authority; licensed drilling contractor; project engineer.

Evidence to prepare

Resource and bore permissions, subsurface risk assessment, groundwater protection and pressure/corrosion data. QLD resource permit guidance does not establish a national exemption for shallow systems.

Electric vehicle supply equipment
When it applies

AC/DC charging equipment, cables and accessories; distinguish vehicle interface, charging mode and bidirectionality.

Acts, regulations or approval scheme

Electrical/ACMA supply rules; installation and building requirements; scheme specifications only when participating.

Responsible authority / assessment route

Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority.

Evidence to prepare

Electrical/interface test dossier, connector and RCD/DC leakage protections, load management, Australian ratings and installation instructions. Published ESV new EVSE Level 3 definition starts 12 February 2028; assess present class separately.

Transformers and high-voltage distribution
When it applies

Power/distribution transformer or HV installation.

Acts, regulations or approval scheme

Electrical installation/network law; GEMS determination if transformer within regulated class.

Responsible authority / assessment route

Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.

Evidence to prepare

Type/routine test evidence, losses/efficiency registration when required, insulation ratings, fault duty, earthing and site acceptance.

Cables, connectors and enclosures
When it applies

AC/DC cable, photovoltaic connector, module junction box or electrical enclosure.

Acts, regulations or approval scheme

Electrical equipment classification and installation requirements.

Responsible authority / assessment route

Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.

Evidence to prepare

Exact conductor/insulation ratings, UV/weather data, connector compatibility, temperature/fire and ingress evidence. Module junction-box standard does not automatically apply to all combiner boxes.

Switchgear, protection and assemblies
When it applies

Breakers, isolators, fuses, switchboards, protection relays and emergency shutdown.

Acts, regulations or approval scheme

Electrical product classification, installation and network safety obligations.

Responsible authority / assessment route

Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.

Evidence to prepare

DC/AC voltage and interruption duty, polarity, fault rating, temperature rise, assembly verification and protection settings; determine class and adopted edition. Recent 61439 catalogue results have inconsistent year metadata: edition unresolved.

Connected products and software
When it applies

In-scope consumer connected devices; products collecting personal information; industrial controls require their own security assessment.

Acts, regulations or approval scheme

Cyber Security Act 2024 and Security Standards for Smart Devices Rules 2025; Privacy Act 1988 where organisation/data scope applies.

Responsible authority / assessment route

Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.

Evidence to prepare

For applicable devices made on/after 4 March 2026: compliant password design, vulnerability reporting, security-update period information and statement of compliance. Map remote access, personal data and overseas disclosures.

Trade and settlement metering
When it applies

Electricity/water/gas meter used to bill for consumption; monitoring-only sensors need separate assessment.

Acts, regulations or approval scheme

National Measurement Act 1960 and associated metrology controls; applicable electricity-market metering rules.

Responsible authority / assessment route

National Measurement Institute; authorised verifier; metering coordinator/network when relevant.

Evidence to prepare

Pattern approval and verification where required; meter accuracy, identification and tamper records. Monitoring accuracy alone does not qualify a meter for billing.

Drones and autonomous equipment
When it applies

Inspection drones, aircraft operation or workplace robotics.

Acts, regulations or approval scheme

Civil Aviation Act/CASR Part 101 operating rules; WHS machinery safety; ACMA radio rules.

Responsible authority / assessment route

CASA; WHS regulator; ACMA; competent robot safety assessor.

Evidence to prepare

Drone registration and operator/pilot credentials or exclusions appropriate to operation; safe operating envelope, radio evidence and machinery risk assessment. RePL/ReOC not universally required for every drone activity.

Stand-alone and hybrid power
When it applies

Off-grid system, generator integration, movable installation or remote/mining power.

Acts, regulations or approval scheme

Electrical safety and workplace/site laws; mining and network-supply licensing where triggered.

Responsible authority / assessment route

Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.

Evidence to prepare

Complete system diagrams, earthing/MEN and switching design, anti-backfeed controls, compatible batteries, ventilation and transportable-system instructions. Confirm individual standard scopes and adopted editions.

Hot water, heat pumps and refrigeration
When it applies

Thermal plant, hot water, HVAC, refrigeration or regulated electrical appliance.

Acts, regulations or approval scheme

Electrical supply/installation; GEMS determination if in scope; WaterMark/plumbing; refrigerant import/handling; CER STC scheme where relevant.

Responsible authority / assessment route

Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.

Evidence to prepare

Correct product class, safety reports, GEMS/WaterMark/CER status where required, refrigerant identity/charge/import conditions and licensed installation. Do not assume every heat pump or water heater is GEMS regulated.

Energy efficiency registration
When it applies

Product appears within a current GEMS regulated class and determination scope.

Acts, regulations or approval scheme

Greenhouse and Energy Minimum Standards Act 2012 and current product determination.

Responsible authority / assessment route

GEMS Regulator / Energy Rating.

Evidence to prepare

Model registration, performance tests and required online/physical labels; preserve scope/exemptions and effective dates. A policy announcement or consultation is not an enacted requirement.

Water supply, pumps and treatment
When it applies

Pumps, irrigation, potable-water contact, plumbing, pressure storage or treatment.

Acts, regulations or approval scheme

Water entitlements; plumbing/building rules; WaterMark scheduled products; WELS for regulated product classes; pressure/WHS as triggered.

Responsible authority / assessment route

Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.

Evidence to prepare

Potable-water compatibility, correct WaterMark schedule entry, hygiene/backflow evidence, extraction rights, pump safety and pressure data; WELS only where within one of its regulated classes.

Tools, test instruments and worksite equipment
When it applies

Hand/powered tools, test instruments or maintenance equipment.

Acts, regulations or approval scheme

Electrical safety where equipment is in scope; WHS safe selection, use and maintenance.

Responsible authority / assessment route

Electrical regulator/RECS as required; scoped laboratory/calibration provider; competent employer/installer.

Evidence to prepare

Tool safety reports, charger evidence, CAT/voltage ratings, traceable calibration and operating instructions. In-service test-and-tag is not original product certification.

Personal protective equipment and signage
When it applies

PPE selected for a defined electrical, construction, chemical or fall hazard.

Acts, regulations or approval scheme

Local WHS/OHS duties and any applicable mandatory consumer product standard.

Responsible authority / assessment route

WHS/OHS regulator; scoped PPE certification/testing provider; competent safety professional.

Evidence to prepare

Hazard/class-specific test reports, conformity evidence, batch/model traceability, instructions, expiry/storage and inspection requirements; employer selection and fit assessment remain separate.

Packaging and imported goods
When it applies

Imported equipment, timber/bamboo packaging or dangerous-goods shipment.

Acts, regulations or approval scheme

Biosecurity Act 2015/BICON conditions; customs and dangerous-goods law as applicable.

Responsible authority / assessment route

DAFF/Biosecurity; ABF/customs broker; transport regulator/carrier.

Evidence to prepare

Packing declaration, timber treatment/marks, cargo cleanliness, classification and shipment documentation. Packaging approval is separate from product approval.

Project planning, environment and fire
When it applies

Physical project affecting land, water, habitat, amenity or hazardous storage.

Acts, regulations or approval scheme

Local planning/building and state environment/fire/heritage laws; EPBC Act 1999 referral/approval where triggered.

Responsible authority / assessment route

Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier.

Evidence to prepare

Site permissions, environmental impact/heritage checks, fire access and emergency response plan; assess project triggers before construction.

Safe design and supply for workplace use
When it applies

Plant, substances or structures used or reasonably expected to be used at work.

Acts, regulations or approval scheme

Applicable jurisdiction WHS/OHS law; model laws are guidance until enacted by the jurisdiction.

Responsible authority / assessment route

State/territory WHS/OHS regulator; competent designer/manufacturer/importer/supplier.

Evidence to prepare

Evidence of safe design and testing; risk information for installation, use, maintenance and disposal; consultation and plant registration where required.

Biofuel quality and fuel supply
When it applies

Finished fuel is supplied, including qualifying biodiesel/ethanol products; equipment supply alone has a different scope.

Acts, regulations or approval scheme

Fuel Quality Standards Act 2000 and applicable fuel determinations/information standards.

Responsible authority / assessment route

DCCEEW fuel-quality regulator; scoped chemical test laboratory.

Evidence to prepare

Fuel specification/test evidence, required fuel information, and section 13 approval if supplying a permitted variation from regulated quality.

03 / Where will it be used?

Check the state or territory.

Product supply and on-site installation can follow different legal routes. These are the jurisdiction records from the 13 October reference. Recheck commencement dates, amendments and adopted building or installation rules with the linked authorities.

Queensland
Electrical safety legislation

Electrical Safety Act 2002; Electrical Safety Regulation 2026 (from 1 September 2026)

Electrical entry pathway

EESS responsible-supplier/product routes; Electrical Safety Queensland / Electrical Safety Office.

Workplace safety and plant

Work Health and Safety Act 2011 and Regulation 2011; plant design/item registration with WorkSafe Queensland.

Gas and hydrogen

Petroleum and Gas (Production and Safety) Act 2004 / Gas Supply Act 2003; Resources Safety & Health Queensland. Hydrogen Safety Code 2025 as applicable.

Building and plumbing adoption

NCC 2022 with Queensland changes remains the relevant baseline; NCC 2025 adoption deferred to 1 May 2027.

Principal project legislation

Planning Act 2016; Environmental Protection Act 1994; Water Act 2000; Water Supply (Safety and Reliability) Act 2008 for regulated dams

Project permission trigger

Planning/environment/resource consent for project construction, waste/emissions, water extraction and regulated dams.

New South Wales
Electrical safety legislation

Gas and Electricity (Consumer Safety) Act 2017; applicable current regulation and declared electrical articles

Electrical entry pathway

NSW approved electrical articles/register and state approval requirements; Building Commission NSW / Fair Trading functions.

Workplace safety and plant

Work Health and Safety Act 2011; Work Health and Safety Regulation 2025; SafeWork NSW.

Gas and hydrogen

State gas appliance/installation route under Gas and Electricity (Consumer Safety) Act; gas acceptance and licensed work.

Building and plumbing adoption

NCC 2022 Amendment 2 and NSW variations; NCC 2025 adoption from 1 May 2027.

Principal project legislation

Environmental Planning and Assessment Act 1979; Protection of the Environment Operations Act 1997; Water Management Act 2000; Dams Safety Act 2015

Project permission trigger

Planning approval, scheduled pollution activities, water access/work approvals and declared-dam safety.

Victoria
Electrical safety legislation

Electricity Safety Act 1998; Electricity Safety (Equipment Safety Scheme) Regulations 2019; installation regulations

Electrical entry pathway

EESS and Energy Safe Victoria equipment/installation routes.

Workplace safety and plant

Occupational Health and Safety Act 2004 and Regulations 2017; WorkSafe Victoria. Victoria uses its OHS law rather than the model WHS Act.

Gas and hydrogen

Gas Safety Act 1997; Gas Safety (Gas Installation) Regulations 2018; ESV Type A/Type B/Schedule 9 acceptance as applicable.

Building and plumbing adoption

NCC 2025 from 1 May 2026, with Victorian variations and provision-specific transitions.

Principal project legislation

Planning and Environment Act 1987; Environment Protection Act 2017 and Regulations 2021; Water Act 1989

Project permission trigger

Planning permit, general environmental duty and permissions for scheduled waste/energy activities; water works/access permissions.

Western Australia
Electrical safety legislation

Electricity Act 1945; Electricity Regulations 1947 Part X; Electricity (Licensing) Regulations 1991

Electrical entry pathway

Building and Energy prescribed electrical equipment approval, marking and licensed-work route; check WA recognised approvals.

Workplace safety and plant

Work Health and Safety Act 2020 and applicable 2022 regulations (general/mines/petroleum as relevant); WorkSafe WA.

Gas and hydrogen

Gas Standards Act 1972; Gas Standards (Gasfitting and Consumer Gas Installations) Regulations 1999; Building and Energy.

Building and plumbing adoption

NCC 2025 adoption from 1 May 2026 with WA variations and transitions.

Principal project legislation

Planning and Development Act 2005; Environmental Protection Act 1986; Rights in Water and Irrigation Act 1914 and Regulations 2000

Project permission trigger

Development approval, environmental assessment/clearing/works approval and water abstraction/bore permits as triggered.

South Australia
Electrical safety legislation

Energy Products (Safety and Efficiency) Act 2000 for product supply; Electricity Act 1996 and general regulations for installation

Electrical entry pathway

Office of the Technical Regulator: electrical product approval/labels and installation compliance.

Workplace safety and plant

Work Health and Safety Act 2012 and Regulations 2012; SafeWork SA.

Gas and hydrogen

Gas Act 1997 and Gas Regulations 2012; OTR product/installation acceptance.

Building and plumbing adoption

Building NCC 2025 from 1 May 2027; Plumbing NCC 2025 from 1 May 2026. Do not use one date for both.

Principal project legislation

Planning, Development and Infrastructure Act 2016; Hydrogen and Renewable Energy Act 2023 and Regulations 2024; Environment Protection Act 1993; Landscape South Australia Act 2019

Project permission trigger

Large-scale HRE/BESS activities require the applicable HRE licensing/approval route, including transitioned projects; project type/land/scope determine the pathway. Also assess EPA and water permissions.

Tasmania
Electrical safety legislation

Electricity Industry Safety and Administration Act 1997 — operative current consolidation checked; 2022 replacement Act requires commencement verification before use

Electrical entry pathway

CBOS electrical equipment/EESS and installation route under operative legislation; do not treat an as-made Act as commenced.

Workplace safety and plant

Work Health and Safety Act 2012 and Regulations 2022; WorkSafe Tasmania.

Gas and hydrogen

Gas Safety Act 2019 and Gas Safety Regulations 2021; CBOS gas standards/acceptance, including Type B and complex biogas installations.

Building and plumbing adoption

NCC 2025 from 1 May 2026 with Tasmanian variations and transitions.

Principal project legislation

Land Use Planning and Approvals Act 1993; Environmental Management and Pollution Control Act 1994; Water Management Act 1999

Project permission trigger

Planning permit, environmental licence/permit for activity class, water allocation/work and dam permissions.

Australian Capital Territory
Electrical safety legislation

Electricity Safety Act 1971; Electricity Safety Regulation 2004 (current register R7 from 12 December 2023)

Electrical entry pathway

ACT electricity safety regulator and equipment/install rules; determine locally recognised approvals.

Workplace safety and plant

Work Health and Safety Act 2011 and Regulation 2011; WorkSafe ACT.

Gas and hydrogen

Gas Safety Act 2000; gas safety regulation; Dangerous Substances Act 2004 where applicable.

Building and plumbing adoption

NCC 2025 commenced 1 May 2026, mandatory from 1 May 2027; design/application-specific 2022 transition available subject to ACT conditions.

Principal project legislation

Planning Act 2023 and Planning (General) Regulation 2023; Environment Protection Act 1997; Water Resources Act 2007

Project permission trigger

Development approval, environmental authorisation/general duties and water-resource permissions.

Northern Territory
Electrical safety legislation

Electrical Safety Act 2022; Electrical Safety Regulations 2024 (commenced 1 July 2024)

Electrical entry pathway

NT WorkSafe electrical safety and equipment/install route, including current amendments.

Workplace safety and plant

Work Health and Safety (National Uniform Legislation) Act 2011 and Regulations 2011; NT WorkSafe.

Gas and hydrogen

Dangerous Goods Act 1998; NT WorkSafe fuel-gas/DG route; Transport of Dangerous Goods by Road and Rail (National Uniform Legislation) Act 2010.

Building and plumbing adoption

NCC 2025 did not apply from 1 May 2026; use NT-adopted NCC 2022 and variations, and confirm the operative code at application date.

Principal project legislation

Planning Act 1999 and Planning Regulations 2000; Environment Protection Act 2019; Water Act 1992

Project permission trigger

Territory planning/development approval, environmental assessment and water-resource licence/permit.

04 / Prepare for Australian supply

Follow the supplier assessment process.

Work through all ten checks. A check may require evidence, clarification or a documented reason why it does not apply. Unresolved requirements must not be treated as passed.

  1. Define the Australian product and accountable supplier
    Action to take

    Record legal Australian/NZ entity where the scheme requires one; brand/model, factory, BOM/firmware, voltage, output, chemistry, rated duty and intended use. Separate bare component, appliance, machine and complete installed system.

    Authority / responsibility

    Australian importer/responsible supplier; relevant state regulator

  2. Electrical equipment approval and RCM
    Action to take

    Apply the EESS classification rules and local jurisdiction law. In-scope broadly covers household/similar equipment greater than 50 V AC or 120 V ripple-free DC and not more than 1,000 V AC or 1,500 V DC respectively; exclusions and equipment definitions control. For EESS Level 1 retain compliance evidence and register supplier; Level 2 register product and compliance folder; Level 3 obtain recognised CoC and register product. Out-of-scope industrial equipment still has statutory safety duties. NSW/WA local requirements must be checked.

    Authority / responsibility

    State electrical regulator; recognised RECS where required; EESS registration

  3. ACMA EMC, radio and telecommunications
    Action to take

    Select ACMA applicable standard, risk/evidence level, labelling and responsible-supplier record obligations. Keep supplier declaration, test reports and technical documentation. Establish authorised radio bands/licences; foreign CE/FCC reports need Australian scope assessment.

    Authority / responsibility

    ACMA; scoped testing laboratory; responsible supplier

  4. Import and material controls
    Action to take

    Classify tariff/customs documents; ensure prohibited asbestos is absent with evidence proportionate to materials and source. Check DAFF/BICON conditions for used/soil-contaminated plant and solid timber packaging. Assess AICIS registration for introduced industrial chemicals; ordinary articles without intended chemical release can be outside chemical introduction rules. Refrigerant equipment imports have separate DCCEEW licensing conditions.

    Authority / responsibility

    ABF; DAFF/Biosecurity; AICIS; DCCEEW

  5. Consumer safety, warranty and supply claims
    Action to take

    Substantiate efficiency, origin, renewable and compliance claims. Use Australian Consumer Law-compliant warranty/consumer guarantees. Assess button/coin battery mandatory product/packaging/information requirements if present; keep recall/incident response and Australian contact records.

    Authority / responsibility

    ACCC Product Safety and state consumer regulators

  6. Energy/water efficiency and scheme listings
    Action to take

    Determine product scope and exclusions against the exact determination. Register covered models before supply and apply required labels. For CEC/CER products verify current model list, certificate scope and expiry; listing is scheme eligibility and is distinct from electrical safety approval.

    Authority / responsibility

    GEMS Regulator; WELS Regulator; CER; CEC product program

  7. Plant, pressure, gas and hazardous-area duties
    Action to take

    Supply risk assessment and safe-install/use/maintenance data. Determine design/item registrations separately with the state WHS/OHS regulator; pressure hazard level and local exclusions control. Obtain state gas appliance acceptance where required. Match Ex certificates to exact equipment, zone/group/temperature and installation.

    Authority / responsibility

    State WHS/OHS and gas regulators; design verifier; IECEx body as accepted

  8. Battery/fuel transport
    Action to take

    Determine UN number, packing instruction, state of charge and mode-specific restrictions; retain lithium test summary where required. Use ADG state-adopted road/rail rules, IMDG/AMSA sea rules and ICAO/CASA air rules, plus carrier acceptance. Damaged/prototype batteries need separate assessment.

    Authority / responsibility

    State DG transport regulator; AMSA; CASA; carrier

  9. Digital product security and data
    Action to take

    Meet Cyber Security Act 2024 / Security Standards for Smart Devices Rules 2025, including default-password, vulnerability-reporting and support-period requirements and statement of compliance. Assess Privacy Act 1988 obligations separately; industrial cybersecurity standards support assurance but are not universally mandatory.

    Authority / responsibility

    Home Affairs; OAIC; ACMA for radio

  10. Project permissions and professional installation
    Action to take

    Resolve state/site/DNSP, adopted NCC/installation edition, installer licence, network permission, planning/environment/fire, water/resource and plant requirements. Obtain AEMO registration or exemption where applicable. Product certificates do not authorise the site design.

    Authority / responsibility

    Licensed trades/registered engineer; council/building certifier; network/AEMO; state environment/water/fire authority

Who tests, certifies or approves the product?

Testing, certification, registration, scheme listing and site approval are separate activities. Confirm the organisation's current recognition and scope before engaging it.

Electrical product certificate
Organisation / route

State electrical regulator or currently recognised EESS RECS certifier

Examples in the source reference — confirm current recognition and scope

CBA; EESS Conformity Certification Services; Global-Mark; UL International New Zealand; SAA Approvals; OzCert; SGS Australia; TÜV Rheinland Australia (check current recognition/scope)

What this route does

Issues recognised electrical certificates within authorised scope; importer must still register and meet ACMA/local law.

Laboratory evidence
Organisation / route

NATA-accredited ISO/IEC 17025 laboratory or scheme-accepted overseas laboratory

Examples in the source reference — confirm current recognition and scope

Select from the live laboratory scope, not accreditation logo alone.

What this route does

Tests/calibrates named methods; NATA is the accreditor, not the product approval office.

Certification-body accreditation
Organisation / route

JAS-ANZ / relevant scheme accreditation

Examples in the source reference — confirm current recognition and scope

Check certification scope and scheme recognition.

What this route does

Accredits bodies; it does not replace the product certificate or regulator registration.

PV/inverter/battery scheme listing
Organisation / route

Clean Energy Council product program; Clean Energy Regulator for scheme eligibility

Examples in the source reference — confirm current recognition and scope

IEC/IECEE route accepted by CEC; CER listed hot-water systems.

What this route does

Assesses listing evidence; does not authorise building, electrical, gas or network installation. Solar Accreditation Australia installer accreditation is separate from SAA Approvals product certification.

WaterMark certification
Organisation / route

ABCB-listed WaterMark conformity assessment body

Examples in the source reference — confirm current recognition and scope

Use current WMCAB directory and certification scope.

What this route does

Certifies scheduled plumbing products. ABCB administers scheme; potable test report alone is not WaterMark certificate.

GEMS / WELS registration
Organisation / route

GEMS Regulator / WELS Regulator

Examples in the source reference — confirm current recognition and scope

Energy Rating registration; Water Rating registration.

What this route does

Registers covered models and oversees mandated efficiency/labels; separate electrical safety approval may apply.

Trade meter approval
Organisation / route

National Measurement Institute and authorised verifier

Examples in the source reference — confirm current recognition and scope

Pattern approval, verification and applicable energy-market metering actors.

What this route does

Confirms prescribed trade-measurement route; ordinary monitoring meter and trade meter differ.

Ex equipment
Organisation / route

Accepted IECEx certification body; state electrical/gas/WHS authority

Examples in the source reference — confirm current recognition and scope

Use official IECEx body and certificate directories and actual equipment scope.

What this route does

Certificates cover defined model/protection; site classification and installation still need competent assessment.

Wind conformity
Organisation / route

Scheme/contract-accepted wind certifier, including appropriate IECRE route

Examples in the source reference — confirm current recognition and scope

Check component/type/project certificate and site design envelope.

What this route does

Assesses specified wind design/equipment; project permissions and network acceptance are separate.

Pressure plant registration
Organisation / route

State WHS/OHS regulator; independent competent design verifier

Examples in the source reference — confirm current recognition and scope

Design registration and item registration are separate.

What this route does

Registers applicable designs/items against threshold rules; no universal import certificate for every vessel.

Gas appliance/plant acceptance
Organisation / route

Relevant state gas technical regulator and accepted gas certification/assessment route

Examples in the source reference — confirm current recognition and scope

Type A, Type B and hydrogen routes differ by jurisdiction.

What this route does

Provides locally required product/installation acceptance; overseas approval alone may not suffice.

Project installation and design
Organisation / route

Licensed electrical/plumbing/refrigeration contractor; appropriately registered engineer; building certifier; network

Examples in the source reference — confirm current recognition and scope

Australian Refrigeration Council/DCCEEW licensing where applicable; council/EPA/water/fire permissions.

What this route does

Designs, installs and approves the actual site within professional and regulator scope.

Keep the record current.

Supply exact-model evidence, accepted document versions, expiry dates, labels, Australian instructions, warranty terms and support contacts. Tell RRE about changes to model, firmware, components, factory, certification or approved configuration. Business registration alone does not approve a supplier or product. RRE reviews marketplace evidence; it does not issue regulatory product certification.

05 / Standards reference library

Browse the 135 standards records.

AS, AS/NZS, IEC and other references serve different purposes. A standard becomes mandatory through the applicable law, scheme, approval or agreement; inclusion here alone does not make it mandatory. Overseas marks such as CE or UL do not by themselves establish Australian compliance.

Open the searchable standards index · 135 records

135 standards records

AS/NZS 3820Essential safety requirements for electrical equipment
Purpose

Essential safety requirements for electrical equipment

When it applies

Electrical equipment; EESS fallback if no applicable national/IEC product standard exists

Requirement pathway

Product safety obligation and EESS standard-selection rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 4417.2:2020 + Amendment 1:2026Equipment definitions and RCM regulatory arrangements
Purpose

Equipment definitions and RCM regulatory arrangements

When it applies

Determine the actual equipment class and commencement date, rather than treating its RRE category as a risk level

Requirement pathway

Electrical equipment regulatory classification

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3000:2018Electrical installation safety
Purpose

Electrical installation safety

When it applies

Fixed electrical installation

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 5033:2021PV-array design and installation
Purpose

PV-array design and installation

When it applies

PV arrays within scope

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 5139:2019Battery installation and safety
Purpose

Battery installation and safety

When it applies

Battery systems within the standard’s scope; assess exclusions and capacity/voltage

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 4777.1:2024Inverter-system installation
Purpose

Inverter-system installation

When it applies

Grid-connected inverter systems in scope

Requirement pathway

Installation and network connection

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 4777.2:2020 + Amendment 2:2024Inverter grid interface and testing
Purpose

Inverter grid interface and testing

When it applies

In-scope grid-connected inverter or bidirectional EV system; network/CEC acceptance

Requirement pathway

Network and scheme requirement

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61215:2021 applicable technology partsPV design qualification and type approval
Purpose

PV design qualification and type approval

When it applies

CEC-listed terrestrial PV modules; select technology-specific parts

Requirement pathway

CEC/scheme-required where applicable

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61730-1/-2:2023PV module safety qualification
Purpose

PV module safety qualification

When it applies

New CEC module applications from 1 May 2026

Requirement pathway

CEC/scheme-required where applicable

Edition and amendments

Existing CEC listings to IEC 61730:2016 can remain until their expiry; this does not permit new 2016 applications.

IEC 63092-1:2020Building-integrated PV modules
Purpose

Building-integrated PV modules

When it applies

Modules functioning as building products

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 63092-2:2020Building-integrated PV systems
Purpose

Building-integrated PV systems

When it applies

Building-envelope PV assemblies

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 60598 applicable Parts 1 and 2Luminaire safety
Purpose

Luminaire safety

When it applies

Solar lighting luminaire: select road/street, floodlight, fixed or portable part by actual use

Requirement pathway

Electrical product safety; installation where applicable

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 61347.2.13 / AS/NZS 61558.2.6 as applicableLED-driver or safety-isolating supply
Purpose

LED-driver or safety-isolating supply

When it applies

Select from declared equipment definition and supply design

Requirement pathway

Product safety/class certificate if required

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62619:2022Industrial lithium-cell/battery safety
Purpose

Industrial lithium-cell/battery safety

When it applies

Stationary industrial lithium batteries

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 63056:2020Lithium batteries used in energy storage
Purpose

Lithium batteries used in energy storage

When it applies

EES batteries in scope

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62133-2:2017 + Amendment 1:2021Portable sealed lithium-cell/battery safety
Purpose

Portable sealed lithium-cell/battery safety

When it applies

Portable lithium batteries; do not substitute for stationary-system assessment

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62620:2014 + Amendment 1:2023Industrial lithium battery performance
Purpose

Industrial lithium battery performance

When it applies

Performance claims for industrial cells/batteries

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62933-5-1:2024Electrical-energy-storage system safety
Purpose

Electrical-energy-storage system safety

When it applies

EES system-level hazard assessment

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62933-5-2:2025Grid-integrated electrochemical storage safety
Purpose

Grid-integrated electrochemical storage safety

When it applies

Grid-integrated electrochemical BESS within scope

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62485-2:2010Stationary battery installation safety
Purpose

Stationary battery installation safety

When it applies

Stationary lead-acid and other covered batteries

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60896-11:2002Vented stationary lead-acid batteries
Purpose

Vented stationary lead-acid batteries

When it applies

Vented lead-acid product

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60896-21/-22:2004Valve-regulated stationary lead-acid tests and requirements
Purpose

Valve-regulated stationary lead-acid tests and requirements

When it applies

VRLA product

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

SA TS 5398:2025Battery-system product safety specifications
Purpose

Battery-system product safety specifications

When it applies

CEC battery-list application/transition and scheme requiring that list

Requirement pathway

Scheme-required when applicable

Edition and amendments

CEC accepts the prior battery guide or TS during 2026. New applications use TS from 1 January 2027; prior-guide listings expire by 31 December 2027. Check current model listing.

UN Manual of Tests and Criteria, subsection 38.3Lithium-cell/battery transport qualification and test summary
Purpose

Lithium-cell/battery transport qualification and test summary

When it applies

Lithium cells/batteries offered for transport; exemptions and prototype provisions depend on mode

Requirement pathway

Transport law/carrier requirement

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

Australian Dangerous Goods Code, edition 7.9Road/rail dangerous-goods classification, packaging and documentation
Purpose

Road/rail dangerous-goods classification, packaging and documentation

When it applies

Consignments classified as dangerous goods

Requirement pathway

Transport law through state/territory adoption

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62109-1/-2 — scheme-accepted editionPV power-converter safety
Purpose

PV power-converter safety

When it applies

PV inverter with PV input; certification scope must cover actual configuration

Requirement pathway

Electrical safety and CEC evidence

Edition and amendments

Do not assume a newly published IEC edition replaces the edition accepted by CEC. Check the applicable certificate and accepted standard list.

IEC 62477-1:2022Power electronic converter system safety
Purpose

Power electronic converter system safety

When it applies

Non-PV/battery converter within low-voltage scope

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62477-2:2018High-voltage power-converter safety
Purpose

High-voltage power-converter safety

When it applies

Converters above the low-voltage part’s scope

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 60335.2.29 with AS/NZS 60335.1Battery-charger appliance safety
Purpose

Battery-charger appliance safety

When it applies

Charger meeting equipment-class definition

Requirement pathway

Electrical product certification where class requires it

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 4509.1:2009Stand-alone power-system safety and installation
Purpose

Stand-alone power-system safety and installation

When it applies

Stand-alone power systems in scope

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 4509.2:2010Stand-alone power-system design
Purpose

Stand-alone power-system design

When it applies

Sizing/design of stand-alone systems

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3010:2017Electrical generating sets
Purpose

Electrical generating sets

When it applies

Generator installation, transfer and operating arrangements

Requirement pathway

Installation law where adopted

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3001.1/.2:2022Connectable installations and supply arrangements
Purpose

Connectable installations and supply arrangements

When it applies

Connectable vehicles/transportable structures in scope; not every shipping container

Requirement pathway

Installation law where adopted

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61400-1:2019 + Amendment 1:2025Wind-turbine design requirements
Purpose

Wind-turbine design requirements

When it applies

General wind turbine design

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61400-2:2013Small wind turbine design
Purpose

Small wind turbine design

When it applies

Small wind turbine within scope

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61400-3-1:2019Fixed offshore wind design
Purpose

Fixed offshore wind design

When it applies

Fixed offshore turbine; floating systems need distinct design assessment

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61400-11:2012 + Amendment 1:2018Acoustic emission measurement
Purpose

Acoustic emission measurement

When it applies

Wind-noise planning/contract evidence

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61400-21-1:2019Electrical-characteristic measurement
Purpose

Electrical-characteristic measurement

When it applies

Wind turbine network-performance evidence

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61116:2025Small hydro installation guidance
Purpose

Small hydro installation guidance

When it applies

Small hydro installations

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60041:1991Hydraulic turbine/pump field acceptance tests
Purpose

Hydraulic turbine/pump field acceptance tests

When it applies

Contracted field-performance acceptance

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60193:2019Hydraulic model acceptance tests
Purpose

Hydraulic model acceptance tests

When it applies

Model-test procurement for large turbine/storage equipment

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62006:2010Small hydro acceptance tests
Purpose

Small hydro acceptance tests

When it applies

Small hydro generating-machine field tests

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 22734:2020Hydrogen generators using water electrolysis
Purpose

Hydrogen generators using water electrolysis

When it applies

Electrolyser product and hydrogen safety-code adoption

Requirement pathway

Technical standard / adopted hydrogen code

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

ISO 22734-1:2025Electrolyser safety
Purpose

Electrolyser safety

When it applies

International design/certification specification; does not automatically amend AS 22734

Requirement pathway

Technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

ISO 14687:2025Hydrogen fuel quality
Purpose

Hydrogen fuel quality

When it applies

Hydrogen-fuel specification/quality claim

Requirement pathway

Fuel supply contract or incorporated rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

ISO 19880-1:2020Hydrogen fuelling-station general requirements
Purpose

Hydrogen fuelling-station general requirements

When it applies

Hydrogen refuelling project

Requirement pathway

Technical specification or incorporated code

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 19880.2:2026Hydrogen fuelling dispensers
Purpose

Hydrogen fuelling dispensers

When it applies

Hydrogen dispensing equipment

Requirement pathway

Technical conformity / adoption check

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

ISO 19881:2025Vehicle hydrogen fuel containers
Purpose

Vehicle hydrogen fuel containers

When it applies

Vehicle onboard hydrogen container; not a substitute for stationary pressure-vessel rules

Requirement pathway

Vehicle product/contract approval

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62282-2-100:2020Fuel-cell module safety
Purpose

Fuel-cell module safety

When it applies

Fuel-cell modules

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62282-3-100:2019Stationary fuel-cell power-system safety
Purpose

Stationary fuel-cell power-system safety

When it applies

Stationary integrated fuel-cell system

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 4343:2014Pressure equipment hazard levels
Purpose

Pressure equipment hazard levels

When it applies

Pressure plant registration assessment; Queensland uses this prescribed edition

Requirement pathway

Plant law classification where prescribed

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 1210:2010Pressure-vessel design
Purpose

Pressure-vessel design

When it applies

Pressure vessel constructed to Australian design code

Requirement pathway

Design code selected under plant-law/contract route

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 1228:2016Pressure boiler design
Purpose

Pressure boiler design

When it applies

Boiler product and applicable plant-registration threshold

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 4041:2006Pressure piping
Purpose

Pressure piping

When it applies

Pressure piping within scope

Requirement pathway

Plant/design rule or contract

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 2885.0:2018 and applicable series partsGas/petroleum pipeline framework
Purpose

Gas/petroleum pipeline framework

When it applies

Pipeline vs plant-piping boundary established with regulator

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 5601.1:2022Gas installations
Purpose

Gas installations

When it applies

Covered gas installation; confirm hydrogen/biogas scope and local acceptance

Requirement pathway

Gas installation law where adopted

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 3814 — regulator-accepted editionIndustrial/commercial gas-fired appliance assessment
Purpose

Industrial/commercial gas-fired appliance assessment

When it applies

Type B/industrial gas appliance where state rules require acceptance

Requirement pathway

Gas approval law

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 60079 applicable parts; IECEx equipment certificationExplosive-atmosphere equipment, selection, installation and inspection
Purpose

Explosive-atmosphere equipment, selection, installation and inspection

When it applies

Hydrogen, biogas, combustible dust or other classified hazardous location

Requirement pathway

WHS/electrical/gas law and project hazard classification

Edition and amendments

Select protection-specific equipment parts and installation/inspection parts against the actual zone, gas/dust group, temperature class and equipment protection level; an IECEx certificate must cover the supplied model.

IEC 60204-1:2016 + Amendment 1:2021Electrical equipment of machinery
Purpose

Electrical equipment of machinery

When it applies

Machine electrical assembly

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/AS/NZS 4024 applicable machinery-safety partsRisk assessment, guarding, interlocks, distances and functional controls
Purpose

Risk assessment, guarding, interlocks, distances and functional controls

When it applies

Machine/robot/conveyor/tracker risk assessment

Requirement pathway

WHS/OHS plant duty; selected standards provide conformity evidence

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62061:2021 + Amendments 1:2024 and 2:2026Machinery safety-related control systems
Purpose

Machinery safety-related control systems

When it applies

Safety function relying on electrical/electronic/programmed control

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

ISO 10218-1:2025 and applicable integration requirementsIndustrial robot safety
Purpose

Industrial robot safety

When it applies

Industrial robots; assess integration and non-industrial scope separately

Requirement pathway

WHS risk management / contract

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61851-1:2017Conductive EV charging general requirements
Purpose

Conductive EV charging general requirements

When it applies

AC charging system and applicable general DC requirements

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61851-23:2023DC EV supply equipment
Purpose

DC EV supply equipment

When it applies

DC conductive charging equipment

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62196-2:2025 with applicable IEC 62196-1/-3EV conductive plugs and vehicle connectors
Purpose

EV conductive plugs and vehicle connectors

When it applies

AC vs DC interface and actual rating

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62752:2024Mode 2 in-cable control and protection
Purpose

Mode 2 in-cable control and protection

When it applies

Portable Mode 2 charging cable/control assembly

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62955:2018Residual DC detecting devices
Purpose

Residual DC detecting devices

When it applies

RDC-DD used for relevant AC EV charging protection

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 2067:2016High-voltage substations and installations
Purpose

High-voltage substations and installations

When it applies

HV plant and switchyard

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 60076 applicable partsPower-transformer design and testing
Purpose

Power-transformer design and testing

When it applies

Transformer type: oil/dry, distribution/power, protection and accessories

Requirement pathway

Electrical/network specification

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS IEC 60076.11:2024Dry-type power transformers
Purpose

Dry-type power transformers

When it applies

Dry-type transformer within scope

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 2374.1:1997 and AS 2374.1.2:2003Mandated distribution-transformer efficiency tests
Purpose

Mandated distribution-transformer efficiency tests

When it applies

Transformer inside GEMS Distribution Transformers Determination 2012 scope

Requirement pathway

GEMS registration / efficiency law

Edition and amendments

The determination’s incorporated editions remain the legal test basis even where the technical catalogue has newer transformer standards.

AS/NZS 61439.1:2026 and applicable assembly partLow-voltage assembly design/routine verification
Purpose

Low-voltage assembly design/routine verification

When it applies

Board type including power assembly or distribution board; use legally/contractually accepted part/edition

Requirement pathway

Electrical installation/product safety and assembly-verification route

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 62271.200:2019 and applicable AS/IEC 62271 partsHigh-voltage switchgear assemblies
Purpose

High-voltage switchgear assemblies

When it applies

Metal-enclosed HV switchgear and applicable component class

Requirement pathway

HV electrical/network specification

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62930:2017PV DC cable construction/tests
Purpose

PV DC cable construction/tests

When it applies

PV DC cable within scope

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 5000.1/.2; AS/NZS 3191 as applicablePower/installation/flexible cable
Purpose

Power/installation/flexible cable

When it applies

Select voltage, insulation and cable construction; building-wire approval when class definition met

Requirement pathway

Electrical safety/class certificate

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3008.1.1:2025Cable current rating, voltage drop and short-circuit selection
Purpose

Cable current rating, voltage drop and short-circuit selection

When it applies

Australian LV installation cable selection

Requirement pathway

Installation/design rule where adopted

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62852:2014 + Amendment 1:2020PV DC connectors
Purpose

PV DC connectors

When it applies

PV connector and mated-pair compatibility

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62790:2020PV-module junction boxes
Purpose

PV-module junction boxes

When it applies

Module-mounted junction boxes; combiner is a different assembly

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3112; AS/NZS 3123; AS/NZS 3199 as applicableMains/industrial plugs and cord-extension sets
Purpose

Mains/industrial plugs and cord-extension sets

When it applies

Actual plug, socket, portable outlet or extension-set class

Requirement pathway

Electrical safety/class certificate

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 2053 / applicable AS/NZS IEC 61386 partsConduit systems for electrical installations
Purpose

Conduit systems for electrical installations

When it applies

Material, rigid/flexible and mechanical/environmental duty

Requirement pathway

Technical/installation standard selected by designer

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3000 and AS 2067 earthing provisionsProtective bonding and earthing design
Purpose

Protective bonding and earthing design

When it applies

LV/HV installation and fault-current duty

Requirement pathway

Installation and network rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62208:2023Empty LV assembly enclosures
Purpose

Empty LV assembly enclosures

When it applies

Empty enclosure; assembled equipment needs its own verification

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60529 consolidated edition 2.2 (2013)Ingress-protection classification
Purpose

Ingress-protection classification

When it applies

Claimed IP rating and installation exposure

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60947-2:2024 / applicable AS/NZS adoptionIndustrial circuit breakers
Purpose

Industrial circuit breakers

When it applies

Industrial breaker class and AC/DC duty

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60898-1:2015 + Amendment 1:2019 / applicable national adoptionHousehold/similar AC circuit breakers
Purpose

Household/similar AC circuit breakers

When it applies

Household breaker; DC needs appropriate DC scope

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 60947.3 — regulator-accepted editionSwitches, disconnectors and switch-disconnectors
Purpose

Switches, disconnectors and switch-disconnectors

When it applies

DC-isolator class and actual DC utilisation/rating

Requirement pathway

Electrical safety/class certificate; PV installation requirement

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61643-31:2018PV DC surge-protective devices
Purpose

PV DC surge-protective devices

When it applies

PV-side surge protection

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61643-41:2025Other DC surge-protective devices
Purpose

Other DC surge-protective devices

When it applies

DC applications excluding PV scope

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62305 Parts 1–4:2024Lightning risk, protection and electrical systems
Purpose

Lightning risk, protection and electrical systems

When it applies

Lightning protection assessment/design

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60269-6:2010 + Amendment 1:2021PV fuse-links
Purpose

PV fuse-links

When it applies

PV DC fuse protection

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60255 applicable partsMeasuring relays and protection equipment
Purpose

Measuring relays and protection equipment

When it applies

Relay accuracy, safety and EMC appropriate to function

Requirement pathway

Network/contract/technical evidence

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 1170.0/.1/.2 and AS 1170.4Structural loads and load combinations
Purpose

Structural loads and load combinations

When it applies

Wind, imposed load and earthquake design for actual site; AS/NZS 1170.2:2021 amendments and AS 1170.4:2024 are relevant current references

Requirement pathway

Building/structural design as adopted

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 4100:2020; AS/NZS 5131:2016; AS/NZS 4600:2018 where cold-formedSteel design, fabrication and erection
Purpose

Steel design, fabrication and erection

When it applies

Steel supporting structure and applicable fabrication category

Requirement pathway

Structural design/building acceptance

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 1664.1:1997 or AS/NZS 1664.2:1997Aluminium limit-state or allowable-stress design
Purpose

Aluminium limit-state or allowable-stress design

When it applies

Aluminium structural racking; select design method

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 3600:2018Concrete structures
Purpose

Concrete structures

When it applies

Concrete foundations and reinforced structures

Requirement pathway

Structural/building design

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 5216:2026Fastenings to concrete design
Purpose

Fastenings to concrete design

When it applies

Post-installed/cast-in fasteners within scope; preserve adopted editions

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 4680:2025Hot-dip galvanised fabricated ferrous products
Purpose

Hot-dip galvanised fabricated ferrous products

When it applies

Specified galvanised steel and corrosion protection

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 62368.1:2026Audio/video and ICT equipment safety
Purpose

Audio/video and ICT equipment safety

When it applies

ICT controller/gateway product in scope

Requirement pathway

Electrical product safety/classification and accepted-edition selection

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62443-4-1:2018Secure industrial-product development lifecycle
Purpose

Secure industrial-product development lifecycle

When it applies

Industrial automation cybersecurity specification

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 62052 / IEC 62053 applicable parts; NMI pattern requirementsElectricity-meter safety/accuracy and Australian trade approval
Purpose

Electricity-meter safety/accuracy and Australian trade approval

When it applies

Select AC/DC meter and accuracy class; trade-use NMI route is separate

Requirement pathway

Trade measurement and market rules where applicable

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 5149 Parts 1–4:2016; AS/NZS ISO 817:2016Refrigeration-system safety and refrigerant classification
Purpose

Refrigeration-system safety and refrigerant classification

When it applies

Refrigerant type, charge, toxicity/flammability and location

Requirement pathway

WHS/building/refrigeration design where adopted

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 60335.2.40:2025 with AS/NZS 60335.1Heat pumps, air conditioners and dehumidifiers
Purpose

Heat pumps, air conditioners and dehumidifiers

When it applies

Appliance safety scope and accepted certification edition

Requirement pathway

Electrical product safety/class certificate if required

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 60335.2.21 / .2.35 with AS/NZS 60335.1Storage/instantaneous electric-water-heater safety
Purpose

Storage/instantaneous electric-water-heater safety

When it applies

Water-heater class; hybrid heat-pump product must be correctly classified

Requirement pathway

Electrical product safety/class certification

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 2712:2007; AS/NZS 4234 as scheme-specifiedSolar/heat-pump water-heater assessment and energy modelling
Purpose

Solar/heat-pump water-heater assessment and energy modelling

When it applies

CER/STC-listed system and the scheme’s test/model specification

Requirement pathway

Scheme eligibility plus applicable product requirements

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

ISO 9806:2025Solar thermal collector test methods
Purpose

Solar thermal collector test methods

When it applies

Collector thermal-performance/safety evidence

Requirement pathway

Technical conformity or adopted scheme method

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3823 applicable determination editionsAir-conditioner energy performance testing
Purpose

Air-conditioner energy performance testing

When it applies

GEMS product scope; ≤65 kW and >65 kW have separate determinations

Requirement pathway

GEMS law

Edition and amendments

For ≤65 kW, use Determination 2019 incorporated methods, including AS/NZS 3823.1.1:2012, .1.2:2012, .1.3:2005, .1.4:2012 and .1.5:2015 as applicable. Ground-loop products are excluded from that determination; do not infer universal heat-pump GEMS registration.

IEC 60034-1:2017; IEC 60034-2-1:2014; IEC 60034-30-1:2014GEMS three-phase motor classification, loss testing and efficiency
Purpose

GEMS three-phase motor classification, loss testing and efficiency

When it applies

Cage induction motor within Determination 2019; inspect integrated/submersible exclusions

Requirement pathway

GEMS law

Edition and amendments

Legal test references are the determination’s incorporated editions; eligible alternative methods include IEEE 112:2004/2017. New IEC technical publications do not replace these automatically.

AS/NZS 60335.2.24:2025; appropriate commercial Part .2.89Refrigerating appliance safety
Purpose

Refrigerating appliance safety

When it applies

Domestic versus commercial refrigeration scope

Requirement pathway

Electrical product safety/class requirements

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

GEMS Refrigerated Cabinets Determination 2024 test methodsCommercial cabinet energy efficiency
Purpose

Commercial cabinet energy efficiency

When it applies

Covered refrigerated cabinet; cold rooms and process plant require separate scope assessment

Requirement pathway

GEMS law

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 60335.1 + applicable heater-specific Part 2 / IEC 60204-1 for machineryElectric heating product safety
Purpose

Electric heating product safety

When it applies

Select space heater, immersion heater, furnace or industrial machine by actual design

Requirement pathway

Electrical safety/classification and plant duties

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 60335.2.41 with AS/NZS 60335.1, where coveredPump appliance safety
Purpose

Pump appliance safety

When it applies

Pump within regulator’s appliance definition; industrial pump may require another relevant standard

Requirement pathway

Electrical product safety/class certificate

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60335-2-41:2024International pump safety
Purpose

International pump safety

When it applies

Pump within international appliance scope; not an automatic substitute for nationally prescribed edition

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 4020:2018Products contacting drinking water
Purpose

Products contacting drinking water

When it applies

Potable-contact materials/components

Requirement pathway

WaterMark/plumbing acceptance when required

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3500 Parts 1–4:2025 — adopted editionPlumbing and drainage design
Purpose

Plumbing and drainage design

When it applies

Water services, sanitary plumbing, stormwater or heated water as applicable

Requirement pathway

State plumbing/NCC adoption

Edition and amendments

Use the version adopted by the applicable state/NCC and approval date; catalogue publication alone is not legal adoption.

AS 3497:2021Drinking-water treatment systems
Purpose

Drinking-water treatment systems

When it applies

WaterMark schedule treatment system

Requirement pathway

WaterMark certification if scheduled

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 4766:2020 + Amendment 1:2024Polyethylene storage tanks for water/chemicals
Purpose

Polyethylene storage tanks for water/chemicals

When it applies

Polyethylene tank within scope; potable use also needs material assessment

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 4747 applicable non-urban water-metering parts; NMI trade rulesWater-meter performance/installation
Purpose

Water-meter performance/installation

When it applies

Non-urban water extraction licence or trade measurement

Requirement pathway

Water licence/trade-measurement conditions

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 6400:2016 — WELS requirementsWater-efficiency rating/labelling
Purpose

Water-efficiency rating/labelling

When it applies

Covered WELS product class; not all pumps, tanks or irrigation products

Requirement pathway

WELS registration and label law

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 62841.1:2026 + tool-specific partHand-held, transportable and garden power-tool safety
Purpose

Hand-held, transportable and garden power-tool safety

When it applies

Actual powered tool type and regulatory class

Requirement pathway

Electrical safety/class certificate and WHS

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61010-1:2010 + Amendment 1:2016Measurement/control/laboratory equipment safety
Purpose

Measurement/control/laboratory equipment safety

When it applies

Test instrument, diagnostic tester and applicable national deviations

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61010-2-030:2023Equipment with testing/measuring circuits
Purpose

Equipment with testing/measuring circuits

When it applies

Instrument connected to testing/measuring circuit; correct measurement category

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61557-1:2019 + function-specific partsElectrical installation safety-test instruments
Purpose

Electrical installation safety-test instruments

When it applies

Insulation, loop, bonding, RCD or related tester function

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3017:2022Electrical installation verification
Purpose

Electrical installation verification

When it applies

Inspection/commissioning test methods

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3760:2022In-service inspection/testing of electrical equipment
Purpose

In-service inspection/testing of electrical equipment

When it applies

Workplace in-service equipment duty; not original product approval

Requirement pathway

Installation/design rule where legally adopted; otherwise contract or technical conformity

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3012:2019Construction/demolition electrical installations
Purpose

Construction/demolition electrical installations

When it applies

Construction worksite

Requirement pathway

Installation/workplace law where adopted

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 60903:2014Electrical insulating gloves
Purpose

Electrical insulating gloves

When it applies

Voltage-class-specific insulating protection

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 1337.1:2010Occupational eye/face protection
Purpose

Occupational eye/face protection

When it applies

Eye protection for actual impact and exposure

Requirement pathway

WHS suitability evidence; not a universal government product certificate

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 1801; AS/NZS 2161 applicable parts; AS/NZS 2210 applicable partsHead, hand and foot protective equipment
Purpose

Head, hand and foot protective equipment

When it applies

Select electrical, mechanical, thermal and chemical duty; footwear selection AS/NZS 2210.1:2025

Requirement pathway

WHS/OHS suitability

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 1891.1:2020; AS/NZS 1891.4:2025Fall-arrest equipment and selection/maintenance
Purpose

Fall-arrest equipment and selection/maintenance

When it applies

Height work and compatible fall-arrest system

Requirement pathway

WHS/OHS risk control

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 1716:2012; AS/NZS 1715:2009 and adopted successor partsRespiratory devices and selection/use
Purpose

Respiratory devices and selection/use

When it applies

Respiratory exposure; monitor phased ISO transition toward 2030

Requirement pathway

WHS/OHS suitability

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 1270 — applicable accepted editionHearing protection
Purpose

Hearing protection

When it applies

Noise risk assessment and attenuator selection

Requirement pathway

WHS/OHS suitability

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS 1319:1994; AS/NZS 3000 / AS/NZS 5033 / AS/NZS 5139 required markingsSafety signs and electrical asset labels
Purpose

Safety signs and electrical asset labels

When it applies

Select by hazard and the installed equipment standard, not a generic sign pack

Requirement pathway

Installation/WHS information duty

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

ISPM 15 and Australian BICON conditionsTimber packaging pest treatment/marking
Purpose

Timber packaging pest treatment/marking

When it applies

Solid timber packaging/dunnage imported into Australia

Requirement pathway

Biosecurity import conditions

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

IEC 61643-11:2025AC surge-protective devices
Purpose

AC surge-protective devices

When it applies

AC supply surge protection

Requirement pathway

Technical conformity / project specification; mandatory only when adopted by the applicable rule

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

AS/NZS 3190 / AS/NZS 61008.1; AS 3111 / AS/NZS 61009.1 as class specifiesResidual-current devices with or without overcurrent protection
Purpose

Residual-current devices with or without overcurrent protection

When it applies

Select the current regulator-defined RCCB/RCBO class and accepted edition

Requirement pathway

Electrical safety/class certificate

Edition and amendments

Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.

References and summaries are provided here; copyrighted standards texts are not reproduced. Obtain the applicable full texts and confirm accepted parts, editions, amendments and transition dates for the assessment.

Reference date and source records

Source: RRE-COMP-REG-001 v1.0, Australian supplier market-entry reference, 13 October 2026. Category mappings are engineering applicability inferences, not regulator determinations. No individual product is certified or approved by this page.

View the reference scope and assessment limits

Covers the 18 categories and 133 subcategories visible in the RRE proposed master taxonomy v2.0. Includes supply/import requirements and the principal installation, network, scheme and project triggers. This is not a claim to identify every law for every possible future product or site. Actual required parts and accepted editions are determined by the explicit conditions, equipment definitions and product/site facts.

  • Public regulator guidance and official publisher catalogues were checked; licensed standard clauses have not been audited in full. Obtain the applicable full texts for certification/design.
  • The live proposed RRE taxonomy was used, not an independently supplied internal category register. New or different register entries require mapping.
  • Equipment not fully specified cannot be individually approved. Use the supplied classification and standard-selection routes to resolve its model, class, chemistry, capacity and location.
  • Current product listing/registration/certificate status and local adoption must be rechecked at the offer, purchase and installation dates.
  • Technical standards without a stated legislative, scheme or contract trigger are conformity references, not asserted universal mandatory laws.
Official sources and publisher references · 219 source records

These links retain the source titles and research date from the source register. Follow the current official page and confirm its operative version before relying on it.

Keep up with the RRE range

New products. Your interests.

Would you like to hear when new products are added to RedRooEnergy? Choose the products, frequency and notification methods that suit you.

Manage preferences or unsubscribe ↗
Would you like new-product updates?

Optional. No subscription is created until you sign in and save your choices. You can change them or opt out at any time. Notification delivery has not started in this private test.

Main website build RRE-MAIN-20261109-seo3

Platform status · Build information