RRE public preview · Installer applications open · Purchasing not enabled
RedRooEnergyRedRooEnergyHelping Australia Access Renewable Energy
Sign inCartAccountSign-in is managed in each workspace.
RRE AI Project Engineer

From your project idea
to a clearer plan.

On this page

Describe what you want to achieve. The private AI Project Engineer workspace brings requirements, preliminary component planning, project records and reviewed product options into one place.

Begin with a home upgrade, farm water supply, remote power need or business project. The new private review build supports saved accounts, load schedules, preliminary component arrangements and controlled project revisions. Live AI and subscription billing await connection and validation.

A rural renewable energy project team exploring preliminary project information
Plan the questions and requirements before committing to equipment.
01 / Choose your starting point

Support for different project conversations.

Buyer project

Explore renewable energy for a home, rural property, business or remote site. Record the outcome you need and prepare for supplier and installer discussions.

Explore an idea

Start with a question. Turn an early idea into a project objective, useful assumptions and a list of information still required.

Installer client project

The private professional mode connects site information, client proposals, product options and feedback. Installer client projects require an approved installer account.

Review an existing project

Reopen a saved project and review its component arrangement, questions and decisions. Professional project owners can authorise named participants to view, edit or review the saved record.

02 / How it guides you

Describe. Review. Assess. Refine.

  1. 01

    Describe your project

    Add the site, goals, equipment, energy needs, budget, timing and limitations. Optional browser-supported voice entry includes a transcript you can review before applying it.

  2. 02

    Check your information

    Review and edit your description or transcript. Separate confirmed facts from estimates and unknowns.

  3. 03

    Begin the assessment

    Carry your information into the workspace and prepare an initial project brief and preliminary concept.

  4. 04

    Answer the next questions

    Resolve gaps such as location, water demand, operating hours or equipment compatibility before proceeding.

03 / Inside the project workspace

Keep the project information together.

The private workspace combines a project navigator, component board and AI assessment panel. A visible project ID, save status and drawing revision help everyone identify the version under discussion.

Project information, files & drawing versions

Record site conditions, existing equipment and requirements. Private PDF, PNG and JPEG uploads retain a file fingerprint and saved revision. Selected documents can be included in a consented AI assessment once the live provider is connected and validated. Public uploads require approved file-safety controls.

Components, products & compatibility

Connect proposed equipment to tagged drawing components, then compare model-specific specifications, evidence and compatibility. Unavailable items can be flagged for sourcing; unresolved selections must remain subject to review. Only eligible approved exact-model catalogue records can be shortlisted. Real RRE supplier data must be reviewed and imported before recommendations are available.

Questions, decisions & professional review

Keep missing information, assumptions, changes and client responses against the project. The revision-specific review record separates client acknowledgement from engineering review, certification and other required approvals.

Client proposals, records & authorised sharing

The private installer workflow connects site capture, a controlled preliminary proposal, questions, revisions and recorded professional review. Private record exports, browser printing and named-participant access are implemented; automated email delivery is not connected. Client acknowledgement does not make a preliminary design ready for construction.

An illustrative renewable energy project package and preliminary design discussion
04 / From a concept to product decisions

Understand what is still to be confirmed.

For a bore pump and tank project, the workspace may need bore depth, water levels, daily water demand, pumping head, location and budget before useful equipment comparisons can begin.

The component arrangement and preliminary schedule connect solar generation, controls, storage, pump and supporting equipment. Product options show outstanding compatibility and professional-review questions, rather than treating a suggestion as approval.

The component board is a preliminary arrangement, without wiring or scaled dimensions. The controlled requirements register records reviewed authoritative references; discipline-specific drawings and project applicability require qualified validation. Final dimensions, design decisions and applicable requirements still need qualified assessment.

Discussing equipment specifications and product options for a renewable energy project
05 / Access that matches your project

Free basic planning. Subscriptions for larger projects.

Private review build

Basic planning workspace

Record requirements and electrical loads, review transparent arithmetic estimates, arrange tagged components, and save or reopen account-based project revisions. The earlier browser-local worksheet remains a separate test.

Go to planning support ↗
Subscription service · Not activated

Larger & professional projects

Larger designs, extensive documents, multiple sites, drawing interpretation, advanced product matching and collaboration require more data processing and storage. These services will require a subscription.

See the service scope ↗

Prices, project limits and activation dates have not been published. No subscription checkout is active.

Keep up with the RRE range

New products. Your interests.

Would you like to hear when new products are added to RedRooEnergy? Choose the products, frequency and notification methods that suit you.

Manage preferences or unsubscribe ↗
Would you like new-product updates?

Optional. No subscription is created until you sign in and save your choices. You can change them or opt out at any time. Notification delivery has not started in this private test.

Main website build RRE-MAIN-20261109-seo3

Platform status · Build information