RRE public preview · Installer applications open · Purchasing not enabled
RedRooEnergyRedRooEnergyHelping Australia Access Renewable Energy
Sign inCartAccountSign-in is managed in each workspace.

RRE information centre / Main RRE site · 简体中文

RRE public information

Western Downs Green Power Hub — solar

On this page

Read the source-dated Western Downs Green Power Hub solar case study and regional context. Original project-owner information is required for current project decisions.

460 MWp solar farm.

Publisher: RedRooEnergy Pty Ltd · Content checked: 2026-10-08 · Publication date: 2026-10-08

Simplified Chinese: AI-assisted translation; human bilingual review pending.

Identifier
western-downs-solar
Location
Near Chinchilla, Western Downs, Queensland
Developer / lead organisation
Neoen
Technology
Solar
Recorded status
Operating

Status evidence

The developer identifies the solar farm as operating.

Published milestones

Operating status checked on 8 October 2026; no new construction date asserted.

Procurement status

No public procurement opportunity identified. The developer states solar-farm hiring is closed; its current expression-of-interest channel concerns battery construction, not this solar asset.

Potential relevance

Potential relevance (RRE inference): equipment, evidence, freight and qualified service capabilities may be relevant to projects of this type. This is not a confirmed work package or invitation.

Developer work-with-us information (not a tender)

Approvals, financing, procurement, construction and operation are separate stages. This profile does not independently verify all approvals, financing or site conditions. RRE does not represent the developer or guarantee opportunities.

Sources and checks

Keep up with the RRE range

New products. Your interests.

Would you like to hear when new products are added to RedRooEnergy? Choose the products, frequency and notification methods that suit you.

Manage preferences or unsubscribe ↗
Would you like new-product updates?

Optional. No subscription is created until you sign in and save your choices. You can change them or opt out at any time. Notification delivery has not started in this private test.

Main website build RRE-MAIN-20261109-seo3

Platform status · Build information