RRE public preview · Installer applications open · Purchasing not enabled
RedRooEnergyRedRooEnergyHelping Australia Access Renewable Energy
Sign inCartAccountSign-in is managed in each workspace.

RRE information centre / Main RRE site · 简体中文

RRE public information

Orana Wind Farm — discontinued

On this page

Read why the source-dated Orana Wind Farm case study is labelled discontinued. Historical project information must not be treated as an active procurement opportunity.

Proposed wind development; no capacity claim included.

Publisher: RedRooEnergy Pty Ltd · Content checked: 2026-10-08 · Publication date: 2026-10-08

Simplified Chinese: AI-assisted translation; human bilingual review pending.

Identifier
orana-wind
Location
Near Dunedoo, Central West New South Wales
Developer / lead organisation
ACCIONA Energía
Technology
Wind
Recorded status
Cancelled

Status evidence

The developer discontinued development on 5 December 2025, citing feasibility challenges. It is not an active construction opportunity.

Published milestones

5 December 2025: discontinuation announced. Earlier development references are superseded by this announcement.

Procurement status

No public procurement opportunity identified in the sources checked. A project profile is not an open tender.

Potential relevance

Potential relevance (RRE inference): equipment, evidence, freight and qualified service capabilities may be relevant to projects of this type. This is not a confirmed work package or invitation.

Approvals, financing, procurement, construction and operation are separate stages. This profile does not independently verify all approvals, financing or site conditions. RRE does not represent the developer or guarantee opportunities.

Sources and checks

Keep up with the RRE range

New products. Your interests.

Would you like to hear when new products are added to RedRooEnergy? Choose the products, frequency and notification methods that suit you.

Manage preferences or unsubscribe ↗
Would you like new-product updates?

Optional. No subscription is created until you sign in and save your choices. You can change them or opt out at any time. Notification delivery has not started in this private test.

Main website build RRE-MAIN-20261109-seo3

Platform status · Build information