RRE public preview · Installer applications open · Purchasing not enabled
RedRooEnergyRedRooEnergyHelping Australia Access Renewable Energy
Sign inCartAccountSign-in is managed in each workspace.

RRE information centre / Main RRE site · 简体中文

RRE public information

Coopers Gap Wind Farm

On this page

Read the source-dated Coopers Gap Wind Farm case study and regional context. Follow original project-owner sources to confirm current operations and procurement information.

453 MW wind farm.

Publisher: RedRooEnergy Pty Ltd · Content checked: 2026-10-08 · Publication date: 2026-10-08

Simplified Chinese: AI-assisted translation; human bilingual review pending.

Identifier
coopers-gap-wind
Location
Cooranga North, Western Downs / South Burnett, Queensland
Developer / lead organisation
Tilt Renewables (AGL development history)
Technology
Wind
Recorded status
Operating

Status evidence

AGL records the transfer of direct operation to Tilt Renewables in June 2024.

Published milestones

June 2024: operation handover recorded by AGL; not a new construction milestone.

Procurement status

No public procurement opportunity identified in the sources checked. A project profile is not an open tender.

Potential relevance

Potential relevance (RRE inference): equipment, evidence, freight and qualified service capabilities may be relevant to projects of this type. This is not a confirmed work package or invitation.

Approvals, financing, procurement, construction and operation are separate stages. This profile does not independently verify all approvals, financing or site conditions. RRE does not represent the developer or guarantee opportunities.

Sources and checks

Keep up with the RRE range

New products. Your interests.

Would you like to hear when new products are added to RedRooEnergy? Choose the products, frequency and notification methods that suit you.

Manage preferences or unsubscribe ↗
Would you like new-product updates?

Optional. No subscription is created until you sign in and save your choices. You can change them or opt out at any time. Notification delivery has not started in this private test.

Main website build RRE-MAIN-20261109-seo3

Platform status · Build information