{"document_id":"RRE-COMP-REG-001","version":"1.0","title":"Australian Renewable Energy Product Compliance Reference","research_date":"2026-10-13","timezone":"Australia/Brisbane","status":"Supplier market-entry reference — all 133 current RRE subcategories have explicit standards selection and entry instructions","publication_status":"Reference content ready for supplier/public use with stated applicability conditions; not individual product certification","taxonomy_source":{"id":"RRE","title":"Live RRE supplier directory — proposed taxonomy v2.0","url":"https://redrooenergy.com.au/suppliers?lang=en","access_date":"2026-10-13","kind":"primary source"},"taxonomy_source_status":"Live proposed taxonomy v2.0; not proof of operational onboarding approval","taxonomy_html_sha256":"fd9131496f00b12df8a0695278a0431dbc3c655bee824529f5bf3271fb0381f4","category_count":18,"subcategory_count":133,"mapping_method":"Exact live taxonomy mapped to primary-source regulatory profiles and explicit standards selection. Subcategory-to-standard assignments are engineering applicability inferences, not regulator determinations.","shared_baseline_profile_ids":["ACL","SAFE","WHS"],"categories":[{"id":"RRE18-C01","name":"Solar Energy & Photovoltaic Systems","subcategories":[{"id":"RRE18-C01-S01","name":"Solar PV Modules","category_id":"RRE18-C01","category_name":"Solar Energy & Photovoltaic Systems","profile_ids":["PV","INSTALL"],"verified_product_approval":false,"standard_ids":["PVPERF","PVSAFE","ARRAY"],"before_supply":"Obtain model-specific IEC certificates and reports with technology, factory and bill-of-materials coverage. Apply to CEC if selling for a scheme/network that requires listing; publish the active model identifier and expiry.","installation_or_project":"Licensed PV installation, roof design and grid approval where connected.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["PV","PV61215","CEC","WIRING","INSTALL","STD-ARRAY"]},{"id":"RRE18-C01-S02","name":"Solar PV Systems & Kits","category_id":"RRE18-C01","category_name":"Solar Energy & Photovoltaic Systems","profile_ids":["PV","PCE","INSTALL","GRID"],"verified_product_approval":false,"standard_ids":["PVPERF","PVSAFE","ARRAY","WIRE","INVGRID","INVCONNECT","BATSITE"],"before_supply":"Obtain model-specific IEC certificates and reports with technology, factory and bill-of-materials coverage. Apply to CEC if selling for a scheme/network that requires listing; publish the active model identifier and expiry. A kit needs a component-by-component evidence schedule; do not infer one approval covers mixed equipment.","installation_or_project":"Design array/string limits, isolation, cables, protection and installed inverter/battery compatibility.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Electrical regulator/RECS; accepted laboratory; CEC; network.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["PV","PV61215","CEC","INV","PCE","WIRING","INSTALL","GRID","NER","STD-ARRAY","STD-WIRE","STD-INVCONNECT","STD-BATSITE"]},{"id":"RRE18-C01-S03","name":"Building-Integrated Photovoltaics (BIPV)","category_id":"RRE18-C01","category_name":"Solar Energy & Photovoltaic Systems","profile_ids":["PV","STRUCT","INSTALL"],"verified_product_approval":false,"standard_ids":["PVPERF","PVSAFE","BIPVM","BIPVS","STRUCTLOAD"],"before_supply":"Obtain model-specific IEC certificates and reports with technology, factory and bill-of-materials coverage. Apply to CEC if selling for a scheme/network that requires listing; publish the active model identifier and expiry. Also demonstrate the building-product function: weatherproofing, fire behaviour, load transfer and envelope interfaces.","installation_or_project":"Building certifier assesses NCC evidence of suitability and site envelope/structural compliance.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["PV","PV61215","CEC","STRUCT","STANDARD","WIRING","INSTALL","STD-BIPVM","STD-BIPVS"]},{"id":"RRE18-C01-S04","name":"Agrivoltaic Solar Systems","category_id":"RRE18-C01","category_name":"Solar Energy & Photovoltaic Systems","profile_ids":["PV","STRUCT","INSTALL","ENV"],"verified_product_approval":false,"standard_ids":["PVPERF","PVSAFE","ARRAY","STRUCTLOAD","MACHINE"],"before_supply":"Obtain model-specific IEC certificates and reports with technology, factory and bill-of-materials coverage. Apply to CEC if selling for a scheme/network that requires listing; publish the active model identifier and expiry. Provide agricultural clearance, access and moving-part risk evidence.","installation_or_project":"Planning, farm operations, site wind/soil and irrigation/vehicle interaction require assessment.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","Licensed electrical contractor; local electrical regulator; inspector where required.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["PV","PV61215","CEC","STRUCT","STANDARD","WIRING","INSTALL","ENV","STD-ARRAY","MACHINE","WHS"]},{"id":"RRE18-C01-S05","name":"Portable & Flexible Solar Solutions","category_id":"RRE18-C01","category_name":"Solar Energy & Photovoltaic Systems","profile_ids":["PV","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["PVPERF","PVSAFE","LIPORT","UN38","CHARGER"],"before_supply":"Document whether the product is a bare extra-low-voltage module or an integrated battery/mains kit. Obtain model-specific IEC certificates and reports with technology, factory and bill-of-materials coverage. Apply to CEC if selling for a scheme/network that requires listing; publish the active model identifier and expiry. Integrated batteries/chargers follow their own safety and transport routes.","installation_or_project":"Fixed, vehicle and camping installations have different scopes; document intended use and limits.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["PV","PV61215","CEC","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","STD-LIPORT","UN","ADG","AIR","SEA","CLASSES"]},{"id":"RRE18-C01-S06","name":"Solar Carport Energy Systems","category_id":"RRE18-C01","category_name":"Solar Energy & Photovoltaic Systems","profile_ids":["PV","STRUCT","INSTALL","GRID","EV"],"verified_product_approval":false,"standard_ids":["PVPERF","PVSAFE","ARRAY","STRUCTLOAD","STEEL","ANCHOR"],"before_supply":"Obtain model-specific IEC certificates and reports with technology, factory and bill-of-materials coverage. Apply to CEC if selling for a scheme/network that requires listing; publish the active model identifier and expiry. Supply carport structural and building-interface documentation.","installation_or_project":"Building/planning consent, vehicle impact, clearances and optional EV charging assessment.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority."],"source_ids":["PV","PV61215","CEC","STRUCT","STANDARD","WIRING","INSTALL","GRID","NER","INV","EV","CLASSES","STD-ARRAY","STD-STEEL","STD-ANCHOR"]},{"id":"RRE18-C01-S07","name":"Solar Lighting Systems","category_id":"RRE18-C01","category_name":"Solar Energy & Photovoltaic Systems","profile_ids":["ELECT","EMC","PV"],"verified_product_approval":false,"standard_ids":["LUM","DRIVER","IP","LIPORT","UN38"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Test the actual luminaire, driver and battery configuration; validate IP and battery-temperature limits.","installation_or_project":"Lighting poles/foundations need site structural design; road-lighting authority approval where used.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration."],"source_ids":["EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","PV","PV61215","CEC","CLASSES","STD-IP","STD-LIPORT","UN","ADG","AIR","SEA"]},{"id":"RRE18-C01-S08","name":"Specialist & Emerging PV Technologies","category_id":"RRE18-C01","category_name":"Solar Energy & Photovoltaic Systems","profile_ids":["PV","INSTALL"],"verified_product_approval":false,"standard_ids":["PVPERF","PVSAFE","BIPVM","ESSENTIAL"],"before_supply":"Identify technology and whether the established module standards cover its claimed use. Use CEC accepted testing where eligible; otherwise obtain a scoped conformity assessment and restrict claims to the tested configuration.","installation_or_project":"Novel PV is assessed for electrical, structural, fire and building use; no exemption follows from being emerging technology.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["PV","PV61215","CEC","WIRING","INSTALL","STD-BIPVM","EESSSELECT"]}]},{"id":"RRE18-C02","name":"Battery Energy Storage Systems","subcategories":[{"id":"RRE18-C02-S01","name":"Residential Battery Storage","category_id":"RRE18-C02","category_name":"Battery Energy Storage Systems","profile_ids":["BAT","ELECT","INSTALL","DG","GRID"],"verified_product_approval":false,"standard_ids":["LIIND","LIESS","BATSPEC","BATSITE","UN38","PCESAFE"],"before_supply":"Select the cell, battery and complete-system safety scopes separately. Obtain reports, BMS protective-function evidence, fault/fire documentation and lithium UN 38.3 summary. Use the CEC route when the intended scheme requires it.","installation_or_project":"Site battery location, separation, wiring, emergency access and compatible inverter installation.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["BAT","CELL","CELL2","INSTALL","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","ADG","UN","SEA","AIR","GRID","NER","INV","STD-LIIND","STD-LIESS","STD-BATSITE","STD-PCESAFE"]},{"id":"RRE18-C02-S02","name":"Commercial & Industrial Battery Storage","category_id":"RRE18-C02","category_name":"Battery Energy Storage Systems","profile_ids":["BAT","ELECT","INSTALL","DG","GRID","ENV"],"verified_product_approval":false,"standard_ids":["LIIND","LIESS","EESSYS","BATSPEC","BATSITE","UN38","PCESAFE"],"before_supply":"Select the cell, battery and complete-system safety scopes separately. Obtain reports, BMS protective-function evidence, fault/fire documentation and lithium UN 38.3 summary. Use the CEC route when the intended scheme requires it. Specify capacity, AC/DC boundary and certified integration scope.","installation_or_project":"Confirm AS/NZS 5139 scope; engineer out-of-scope installations and workplace/fire requirements.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["BAT","CELL","CELL2","INSTALL","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","ADG","UN","SEA","AIR","GRID","NER","INV","ENV","STANDARD","STD-LIIND","STD-LIESS","STD-EESSYS","STD-BATSITE","STD-PCESAFE"]},{"id":"RRE18-C02-S03","name":"Utility-Scale Battery Energy Storage","category_id":"RRE18-C02","category_name":"Battery Energy Storage Systems","profile_ids":["BAT","TX","GRID","DG","ENV"],"verified_product_approval":false,"standard_ids":["LIIND","LIESS","EESSYS","EESCHEM","UN38","PCEHV"],"before_supply":"Select the cell, battery and complete-system safety scopes separately. Obtain reports, BMS protective-function evidence, fault/fire documentation and lithium UN 38.3 summary. Use the CEC route when the intended scheme requires it. Supply system fire-propagation/hazard study, controls, emergency response and performance evidence for procurement.","installation_or_project":"Planning/fire approval, HV design, connection studies and AEMO registration or exemption; CEC residential listing is not utility approval.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["BAT","CELL","CELL2","INSTALL","HV","TX","GEMSTX","GRID","NER","INV","ADG","UN","SEA","AIR","ENV","STANDARD","STD-LIIND","STD-LIESS","STD-EESSYS","STD-EESCHEM","STD-PCEHV"]},{"id":"RRE18-C02-S04","name":"Containerised Battery Energy Storage Systems","category_id":"RRE18-C02","category_name":"Battery Energy Storage Systems","profile_ids":["BAT","TX","GRID","DG","ENV","STRUCT"],"verified_product_approval":false,"standard_ids":["LIIND","LIESS","EESSYS","EESCHEM","UN38","PCESAFE"],"before_supply":"Select the cell, battery and complete-system safety scopes separately. Obtain reports, BMS protective-function evidence, fault/fire documentation and lithium UN 38.3 summary. Use the CEC route when the intended scheme requires it. Assess the complete enclosure, ventilation, cooling, fire detection and shipping configuration.","installation_or_project":"Site container placement, fire response, structural foundations and HV/LV boundary; mobile standard applies only if within connectable scope.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["BAT","CELL","CELL2","INSTALL","HV","TX","GEMSTX","GRID","NER","INV","ADG","UN","SEA","AIR","ENV","STANDARD","STRUCT","STD-LIIND","STD-LIESS","STD-EESSYS","STD-EESCHEM","STD-PCESAFE"]},{"id":"RRE18-C02-S05","name":"Portable Battery Storage & Power Stations","category_id":"RRE18-C02","category_name":"Battery Energy Storage Systems","profile_ids":["ELECT","EMC","DG"],"verified_product_approval":false,"standard_ids":["LIPORT","UN38","PCESAFE","CHARGER","MAINSPLUG"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Test battery, charger, AC output and protection as one configuration. Portable power-station class changes from 12 February 2028 must not be applied early.","installation_or_project":"Supply safe output/earthing/connection instructions; prevent unauthorised connection to fixed wiring.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist."],"source_ids":["EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","ADG","UN","SEA","AIR","STD-LIPORT","STD-PCESAFE","CLASSES"]},{"id":"RRE18-C02-S06","name":"Battery Modules, Cells & Technologies","category_id":"RRE18-C02","category_name":"Battery Energy Storage Systems","profile_ids":["BAT","DG"],"verified_product_approval":false,"standard_ids":["LIIND","LIESS","LIPORT","LIPERF","LEADSAFE","LEADVENT","LEADVRLA","UN38"],"before_supply":"Choose chemistry and application first: portable lithium, industrial/stationary lithium, vented lead-acid or VRLA. Issue cell/model-level reports and transport classification; lithium standards do not certify other chemistries.","installation_or_project":"Cell approval does not prove assembled pack/system safety; integrator must assess BMS, enclosure, faults and installation.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist."],"source_ids":["BAT","CELL","CELL2","INSTALL","ADG","UN","SEA","AIR","STD-LIIND","STD-LIESS","STD-LIPORT","STD-LIPERF","STD-LEADSAFE","STD-LEADVENT","STD-LEADVRLA"]},{"id":"RRE18-C02-S07","name":"Battery Management Systems (BMS)","category_id":"RRE18-C02","category_name":"Battery Energy Storage Systems","profile_ids":["BAT","ELECT","EMC","SMART"],"verified_product_approval":false,"standard_ids":["LIIND","LIESS","EESSYS","TESTSAFE"],"before_supply":"Document BMS protective thresholds, sensor faults, balancing, contactors, communications and fail-safe behaviour. Verify protection within the battery/system assessment; a BMS board is not a battery certificate.","installation_or_project":"Confirm integration, firmware configuration and commissioning tests against the approved battery system.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator."],"source_ids":["BAT","CELL","CELL2","INSTALL","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","CYBER","PRIVACY","STD-LIIND","STD-LIESS","STD-EESSYS","STD-TESTSAFE"]},{"id":"RRE18-C02-S08","name":"Battery Racks, Cabinets & Accessories","category_id":"RRE18-C02","category_name":"Battery Energy Storage Systems","profile_ids":["BAT","STRUCT"],"verified_product_approval":false,"standard_ids":["BATSITE","EESSYS","EMPTYBOX","IP","STRUCTLOAD"],"before_supply":"Provide load ratings, corrosion/IP claims, electrical clearances, thermal/fire interfaces and compatible battery models. Unpowered racks generally have no stand-alone EESS certificate; fitted electronics alter the assessment.","installation_or_project":"Site load/anchorage, access, ventilation and battery separation must be designed for the installed configuration.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["BAT","CELL","CELL2","INSTALL","STRUCT","STANDARD","STD-BATSITE","STD-EESSYS","STD-EMPTYBOX","STD-IP"]}]},{"id":"RRE18-C03","name":"Inverters & Power Conversion Equipment","subcategories":[{"id":"RRE18-C03-S01","name":"Grid-Connected Solar Inverters","category_id":"RRE18-C03","category_name":"Inverters & Power Conversion Equipment","profile_ids":["PCE","ELECT","EMC","INSTALL","GRID"],"verified_product_approval":false,"standard_ids":["PVINVSAFE","INVGRID","INVCONNECT","WIRE"],"before_supply":"Establish PV-input versus non-PV converter safety scope and electrical equipment classification. Obtain model/firmware-specific safety and EMC evidence; grid-connected products also need accepted grid-interface tests and network settings.","installation_or_project":"DNSP approval and regional settings; export and protection commissioning.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS; accepted laboratory; CEC; network.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["INV","PCE","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WIRING","INSTALL","GRID","NER","STD-INVCONNECT","STD-WIRE"]},{"id":"RRE18-C03-S02","name":"Hybrid Solar Inverters","category_id":"RRE18-C03","category_name":"Inverters & Power Conversion Equipment","profile_ids":["PCE","BAT","ELECT","EMC","INSTALL","GRID"],"verified_product_approval":false,"standard_ids":["PVINVSAFE","PCESAFE","INVGRID","INVCONNECT","BATSITE"],"before_supply":"Establish PV-input versus non-PV converter safety scope and electrical equipment classification. Obtain model/firmware-specific safety and EMC evidence; grid-connected products also need accepted grid-interface tests and network settings. Include backup transfer, islanding and compatible battery combinations.","installation_or_project":"Backup circuits, neutral/earthing, transfer controls and battery installation.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS; accepted laboratory; CEC; network.","Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["INV","PCE","BAT","CELL","CELL2","INSTALL","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WIRING","GRID","NER","STD-PCESAFE","STD-INVCONNECT","STD-BATSITE"]},{"id":"RRE18-C03-S03","name":"Off-Grid Inverters & Inverter Chargers","category_id":"RRE18-C03","category_name":"Inverters & Power Conversion Equipment","profile_ids":["PCE","ELECT","EMC","INSTALL","OFFGRID"],"verified_product_approval":false,"standard_ids":["PVINVSAFE","PCESAFE","OFF1","OFF2","GENSET","CHARGER"],"before_supply":"Establish PV-input versus non-PV converter safety scope and electrical equipment classification. Obtain model/firmware-specific safety and EMC evidence; grid-connected products also need accepted grid-interface tests and network settings. Clarify whether grid-parallel operation is disabled or supported.","installation_or_project":"Stand-alone design and generator changeover; grid rules apply if any grid-parallel capability is used.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS; accepted laboratory; CEC; network.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Licensed electrical contractor; local electrical regulator; inspector where required.","Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable."],"source_ids":["INV","PCE","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WIRING","INSTALL","STANDARD","STD-PCESAFE","STD-OFF1","STD-OFF2","STD-GENSET","CLASSES"]},{"id":"RRE18-C03-S04","name":"Microinverters & Power Optimisers","category_id":"RRE18-C03","category_name":"Inverters & Power Conversion Equipment","profile_ids":["PCE","ELECT","EMC","PV","INSTALL"],"verified_product_approval":false,"standard_ids":["PVINVSAFE","INVGRID","ARRAY","PVPLUG"],"before_supply":"Establish PV-input versus non-PV converter safety scope and electrical equipment classification. Obtain model/firmware-specific safety and EMC evidence; grid-connected products also need accepted grid-interface tests and network settings. Treat microinverter grid interface and DC optimiser safety separately; retain approved module/interconnect combinations.","installation_or_project":"Array voltage/current limits, communication, rooftop cabling and installer access.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS; accepted laboratory; CEC; network.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["INV","PCE","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","PV","PV61215","CEC","WIRING","INSTALL","STD-ARRAY","STD-PVPLUG"]},{"id":"RRE18-C03-S05","name":"Battery Inverters & Bidirectional Converters","category_id":"RRE18-C03","category_name":"Inverters & Power Conversion Equipment","profile_ids":["PCE","ELECT","EMC","BAT","INSTALL","GRID"],"verified_product_approval":false,"standard_ids":["PCESAFE","INVGRID","INVCONNECT","BATSITE"],"before_supply":"Establish PV-input versus non-PV converter safety scope and electrical equipment classification. Obtain model/firmware-specific safety and EMC evidence; grid-connected products also need accepted grid-interface tests and network settings. Battery-only inverter uses appropriate non-PV converter safety evidence; test bidirectional operation.","installation_or_project":"Battery/inverter combination, backup arrangement and grid permission.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS; accepted laboratory; CEC; network.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["INV","PCE","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","BAT","CELL","CELL2","INSTALL","WIRING","GRID","NER","STD-PCESAFE","STD-INVCONNECT","STD-BATSITE"]},{"id":"RRE18-C03-S06","name":"Power Conversion Systems (PCS)","category_id":"RRE18-C03","category_name":"Inverters & Power Conversion Equipment","profile_ids":["PCE","TX","ELECT","EMC","GRID"],"verified_product_approval":false,"standard_ids":["PCESAFE","PCEHV","INVGRID","HV","EESCHEM"],"before_supply":"Establish PV-input versus non-PV converter safety scope and electrical equipment classification. Obtain model/firmware-specific safety and EMC evidence; grid-connected products also need accepted grid-interface tests and network settings. State whether LV inverter connection standard covers the equipment; provide utility performance models where outside it.","installation_or_project":"HV engineer/network studies and plant registration/exemption for utility PCS.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS; accepted laboratory; CEC; network.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["INV","PCE","HV","TX","GEMSTX","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","GRID","NER","STD-PCESAFE","STD-PCEHV","STD-HV","STD-EESCHEM"]},{"id":"RRE18-C03-S07","name":"DC-DC Converters & Charge Controllers","category_id":"RRE18-C03","category_name":"Inverters & Power Conversion Equipment","profile_ids":["PCE","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["PCESAFE","PVINVSAFE","CHARGER","ARRAY"],"before_supply":"Establish PV-input versus non-PV converter safety scope and electrical equipment classification. Obtain model/firmware-specific safety and EMC evidence; grid-connected products also need accepted grid-interface tests and network settings. Select DC-DC/PV charge-controller scope and maximum fault/charging conditions; classification depends on actual design.","installation_or_project":"DC protection, battery chemistry/charging compatibility and cable sizing.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS; accepted laboratory; CEC; network.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["INV","PCE","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","STD-PCESAFE","CLASSES","STD-ARRAY"]},{"id":"RRE18-C03-S08","name":"Power Electronics & Conversion Accessories","category_id":"RRE18-C03","category_name":"Inverters & Power Conversion Equipment","profile_ids":["PCE","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["ESSENTIAL","PCESAFE","ICT","EMPTYBOX","IP"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Identify the accessory function; verify it with the host product’s safety-critical configuration.","installation_or_project":"Replacement/subassembly must preserve host certificate, creepage/clearance, cooling and EMC.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS; accepted laboratory; CEC; network.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["INV","PCE","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","STD-PCESAFE","STD-ICT","STD-EMPTYBOX","STD-IP"]}]},{"id":"RRE18-C04","name":"Wind Energy Systems","subcategories":[{"id":"RRE18-C04-S01","name":"Residential & Small Wind Turbines","category_id":"RRE18-C04","category_name":"Wind Energy Systems","profile_ids":["WIND","STRUCT","ELECT","INSTALL","GRID","ENV"],"verified_product_approval":false,"standard_ids":["WINDSMALL","WINDNOISE","WINDELEC","STRUCTLOAD","WIRE"],"before_supply":"Obtain small-turbine design, overspeed/braking, rotor/tower and electrical-performance evidence; use a scoped wind certification body where required by purchaser/scheme.","installation_or_project":"Planning/noise, tower foundation, electrical installation and network connection.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Scoped wind certification body/IECRE route to be confirmed; engineer; planning/environment authority; network.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["WIND","ENV","STRUCT","STANDARD","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","GRID","NER","INV","STD-WINDSMALL","STD-WINDNOISE","STD-WINDELEC","STD-WIRE"]},{"id":"RRE18-C04-S02","name":"Commercial & Industrial Wind Turbines","category_id":"RRE18-C04","category_name":"Wind Energy Systems","profile_ids":["WIND","STRUCT","PRESS","GRID","ENV"],"verified_product_approval":false,"standard_ids":["WINDMAIN","WINDNOISE","WINDELEC","STRUCTLOAD","MACHINE"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Provide turbine design/type certification and site-class envelope.","installation_or_project":"Site suitability, noise/environment, grid studies and crane/height-work plans.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Scoped wind certification body/IECRE route to be confirmed; engineer; planning/environment authority; network.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["WIND","ENV","STRUCT","STANDARD","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","GRID","NER","INV","STD-WINDMAIN","STD-WINDNOISE","STD-WINDELEC","WHS"]},{"id":"RRE18-C04-S03","name":"Utility-Scale Wind Turbines","category_id":"RRE18-C04","category_name":"Wind Energy Systems","profile_ids":["WIND","STRUCT","TX","GRID","ENV"],"verified_product_approval":false,"standard_ids":["WINDMAIN","WINDNOISE","WINDELEC","HV","MACHINE"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Provide type/component certification and detailed network model/performance records.","installation_or_project":"Development/environment approvals, AEMO connection/registration and transmission conditions.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Scoped wind certification body/IECRE route to be confirmed; engineer; planning/environment authority; network.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["WIND","ENV","STRUCT","STANDARD","HV","TX","GEMSTX","GRID","NER","INV","STD-WINDMAIN","STD-WINDNOISE","STD-WINDELEC","STD-HV","MACHINE","WHS"]},{"id":"RRE18-C04-S04","name":"Offshore Wind Energy Systems","category_id":"RRE18-C04","category_name":"Wind Energy Systems","profile_ids":["WIND","OFFSHORE","STRUCT","TX","GRID","ENV"],"verified_product_approval":false,"standard_ids":["WINDMAIN","WINDFIX","WINDELEC","MACHINE"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Fixed offshore design reference does not cover floating support design; specify the actual offshore certification basis.","installation_or_project":"Commonwealth offshore electricity licensing, management plan, maritime/environment and onshore connection approvals.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Scoped wind certification body/IECRE route to be confirmed; engineer; planning/environment authority; network.","Offshore Infrastructure Registrar; Offshore Infrastructure Regulator/NOPSEMA; relevant environment and maritime authorities.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["WIND","ENV","OFFSHORE","STRUCT","STANDARD","HV","TX","GEMSTX","GRID","NER","INV","STD-WINDMAIN","STD-WINDFIX","STD-WINDELEC","MACHINE","WHS"]},{"id":"RRE18-C04-S05","name":"Wind Turbine Components & Accessories","category_id":"RRE18-C04","category_name":"Wind Energy Systems","profile_ids":["WIND","PRESS","ELECT"],"verified_product_approval":false,"standard_ids":["WINDMAIN","MACHINE","MACHINEELEC","STRUCTLOAD"],"before_supply":"Provide component traceability, fatigue/material and functional evidence to the turbine’s certification/design basis; declare approved interchangeability.","installation_or_project":"Rotor/drivetrain/control replacement may require design-body reassessment and site lifting controls.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Scoped wind certification body/IECRE route to be confirmed; engineer; planning/environment authority; network.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["WIND","ENV","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","STD-WINDMAIN","WHS","STD-MACHINEELEC","STRUCT","STANDARD"]},{"id":"RRE18-C04-S06","name":"Wind Resource Monitoring & Control Equipment","category_id":"RRE18-C04","category_name":"Wind Energy Systems","profile_ids":["EMC","SMART","METER"],"verified_product_approval":false,"standard_ids":["ICT","TESTSAFE","CYBERTECH"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Validate sensor calibration, environmental protection and control-system fail-safe interfaces.","installation_or_project":"Mast/communications approvals and site wind/resource measurement protocol; safety controls need turbine-level validation.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["ACMA; responsible supplier; appropriately scoped testing laboratory.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","National Measurement Institute; authorised verifier; metering coordinator/network when relevant."],"source_ids":["ACMA","ACMA2","CYBER","PRIVACY","METER","NER","STD-ICT","STD-TESTSAFE","STD-CYBERTECH"]}]},{"id":"RRE18-C05","name":"Hydro Energy Systems","subcategories":[{"id":"RRE18-C05-S01","name":"Large-Scale Hydroelectric Systems","category_id":"RRE18-C05","category_name":"Hydro Energy Systems","profile_ids":["HYDRO","TX","GRID","ENV","PRESS"],"verified_product_approval":false,"standard_ids":["HYDROFIELD","HYDROMODEL","HV","MACHINE","PRESSCLASS"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Agree model/field acceptance methods, generator performance and pressure-boundary design in the supply contract.","installation_or_project":"Water allocation, dam safety, catchment/environment approval and grid project permission.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water and dam-safety regulator; environmental/planning authority; network; qualified engineer.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector."],"source_ids":["HYDRO","DAM","WATER","ENV","HV","TX","GEMSTX","GRID","NER","INV","STANDARD","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","STD-HYDROFIELD","STD-HYDROMODEL","STD-HV","WHS"]},{"id":"RRE18-C05-S02","name":"Small & Mini Hydroelectric Systems","category_id":"RRE18-C05","category_name":"Hydro Energy Systems","profile_ids":["HYDRO","ELECT","INSTALL","GRID","PRESS"],"verified_product_approval":false,"standard_ids":["HYDROGUIDE","HYDROSMALL","HYDROFIELD","MACHINE","WIRE"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Supply turbine head/flow operating envelope and acceptance-test plan.","installation_or_project":"Water diversion/extraction consent and electrical/network design.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water and dam-safety regulator; environmental/planning authority; network; qualified engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector."],"source_ids":["HYDRO","DAM","WATER","ENV","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","GRID","NER","INV","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","STD-HYDROGUIDE","STD-HYDROSMALL","STD-HYDROFIELD","WHS","STD-WIRE"]},{"id":"RRE18-C05-S03","name":"Micro & Pico Hydro Generators","category_id":"RRE18-C05","category_name":"Hydro Energy Systems","profile_ids":["HYDRO","ELECT","INSTALL","OFFGRID"],"verified_product_approval":false,"standard_ids":["HYDROGUIDE","HYDROSMALL","WIRE","OFF1"],"before_supply":"Supply turbine/generator electrical safety, runaway/overspeed limits, enclosure protection and operating envelope; identify fixed versus portable connection.","installation_or_project":"Land/water permissions remain relevant at small size; fixed wiring by licensed installer.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water and dam-safety regulator; environmental/planning authority; network; qualified engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required.","Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable."],"source_ids":["HYDRO","DAM","WATER","ENV","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","STANDARD","STD-HYDROGUIDE","STD-HYDROSMALL","STD-WIRE","STD-OFF1"]},{"id":"RRE18-C05-S04","name":"Pumped Hydro Energy Storage","category_id":"RRE18-C05","category_name":"Hydro Energy Systems","profile_ids":["HYDRO","TX","GRID","ENV","PRESS"],"verified_product_approval":false,"standard_ids":["HYDROMODEL","HYDROFIELD","HV","MACHINE","PRESSCLASS","PIPING"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Document pump/turbine transient and performance evidence, pressure class and reversible operating modes.","installation_or_project":"Dam/water/environment approvals, geotechnical works, pressure transients and grid connection.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water and dam-safety regulator; environmental/planning authority; network; qualified engineer.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector."],"source_ids":["HYDRO","DAM","WATER","ENV","HV","TX","GEMSTX","GRID","NER","INV","STANDARD","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","STD-HYDROMODEL","STD-HYDROFIELD","STD-HV","WHS","STD-PIPING"]},{"id":"RRE18-C05-S05","name":"Hydro Turbines, Generators & Components","category_id":"RRE18-C05","category_name":"Hydro Energy Systems","profile_ids":["HYDRO","PRESS","ELECT"],"verified_product_approval":false,"standard_ids":["HYDROMODEL","HYDROFIELD","MACHINE","MACHINEELEC","MOTORGEMS"],"before_supply":"Supply turbine/generator component performance, material and pressure evidence and traceable compatibility. Assess any separately supplied regulated motor for GEMS.","installation_or_project":"Engineer mechanical/electrical integration and protection; assembly approval does not follow from component tests.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water and dam-safety regulator; environmental/planning authority; network; qualified engineer.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["HYDRO","DAM","WATER","ENV","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","STD-HYDROMODEL","STD-HYDROFIELD","WHS","STD-MACHINEELEC","GEMSMOTOR"]},{"id":"RRE18-C05-S06","name":"Hydro Monitoring & Control Equipment","category_id":"RRE18-C05","category_name":"Hydro Energy Systems","profile_ids":["EMC","SMART","METER"],"verified_product_approval":false,"standard_ids":["ICT","TESTSAFE","CYBERTECH","MACHINE","FUNCSAFE"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Calibrate hydraulic sensors and validate shutdown/level-control safety functions.","installation_or_project":"Safety-critical dam/turbine control must meet project hazard and functional safety assessment.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["ACMA; responsible supplier; appropriately scoped testing laboratory.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","National Measurement Institute; authorised verifier; metering coordinator/network when relevant."],"source_ids":["ACMA","ACMA2","CYBER","PRIVACY","METER","NER","STD-ICT","STD-TESTSAFE","STD-CYBERTECH","MACHINE","WHS","STD-FUNCSAFE"]}]},{"id":"RRE18-C06","name":"Hydrogen Energy & Fuel Cell Systems","subcategories":[{"id":"RRE18-C06-S01","name":"Green Hydrogen Production & Electrolysers","category_id":"RRE18-C06","category_name":"Hydrogen Energy & Fuel Cell Systems","profile_ids":["H2","PRESS","ELECT","EMC","ENV"],"verified_product_approval":false,"standard_ids":["H2GEN","H2NEW","H2FUEL","PRESSCLASS","VESSEL","PIPING","EX","PCESAFE"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Prepare hydrogen-specific safety case, leak/ventilation controls, gas purity claims and regulator-accepted electrolyser conformity evidence.","installation_or_project":"Hydrogen/gas authority and WHS plant classification; QLD Hydrogen Safety Code 2025 where applicable.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas/petroleum safety regulator; WHS regulator; pressure/gas engineer; recognised hazardous-area certification route.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["H2","PRESSURE","GASFUELCELL","IECEX","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","ENV","STANDARD","STD-H2GEN","STD-H2NEW","STD-H2FUEL","STD-PIPING","STD-PCESAFE"]},{"id":"RRE18-C06-S02","name":"Hydrogen Storage Systems","category_id":"RRE18-C06","category_name":"Hydrogen Energy & Fuel Cell Systems","profile_ids":["H2","PRESS","DG","ENV"],"verified_product_approval":false,"standard_ids":["PRESSCLASS","VESSEL","PIPING","EX","H2TANK","ADGCODE"],"before_supply":"Distinguish stationary vessel, cylinder and vehicle container; select the legally accepted vessel/cylinder code and independent design verification. Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant.","installation_or_project":"Design/item registration thresholds, dangerous-goods quantity licensing, fire separation and transport rules.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas/petroleum safety regulator; WHS regulator; pressure/gas engineer; recognised hazardous-area certification route.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["H2","PRESSURE","GASFUELCELL","IECEX","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","ADG","UN","SEA","AIR","ENV","STANDARD","STD-PIPING","STD-H2TANK"]},{"id":"RRE18-C06-S03","name":"Hydrogen Compression & Distribution Equipment","category_id":"RRE18-C06","category_name":"Hydrogen Energy & Fuel Cell Systems","profile_ids":["H2","PRESS","DG","ELECT"],"verified_product_approval":false,"standard_ids":["PRESSCLASS","VESSEL","PIPING","PIPELINE","EX","MACHINE"],"before_supply":"Confirm plant piping versus regulated pipeline, rated pressure and hydrogen material compatibility. Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant.","installation_or_project":"Gas/pipeline regulator acceptance, pressure-plant registrations and hazardous-area installation.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas/petroleum safety regulator; WHS regulator; pressure/gas engineer; recognised hazardous-area certification route.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["H2","PRESSURE","GASFUELCELL","IECEX","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","ADG","UN","SEA","AIR","EESS","NSW","CERT","EESSSELECT","EESSDOC","STD-PIPING","STD-PIPELINE","WHS"]},{"id":"RRE18-C06-S04","name":"Hydrogen Fuel Cells","category_id":"RRE18-C06","category_name":"Hydrogen Energy & Fuel Cell Systems","profile_ids":["H2","FUEL","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["FCMOD","FCSYS","EX","PCESAFE"],"before_supply":"Supply module and integrated-system fuel-cell safety evidence; document fuel quality, reformer/auxiliary gas equipment and venting. Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met.","installation_or_project":"State gas acceptance can apply as well as electrical requirements; Victoria’s hydrogen Schedule 9 route is distinct.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas/petroleum safety regulator; WHS regulator; pressure/gas engineer; recognised hazardous-area certification route.","Electrical/gas regulator; scoped fuel-cell certifier/laboratory; qualified system engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["H2","PRESSURE","GASFUELCELL","IECEX","FUEL","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","STD-FCMOD","STD-FCSYS","MACHINE","STD-PCESAFE"]},{"id":"RRE18-C06-S05","name":"Hydrogen Power Generation Systems","category_id":"RRE18-C06","category_name":"Hydrogen Energy & Fuel Cell Systems","profile_ids":["H2","FUEL","PCE","INSTALL","GRID"],"verified_product_approval":false,"standard_ids":["FCSYS","FCMOD","GENSET","INVGRID","EX","PRESSCLASS"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Supply integrated fuel-cell/generator safety, gas train and electrical/grid interface evidence.","installation_or_project":"State gas approval, network consent and fuel-storage/fire/project permissions.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas/petroleum safety regulator; WHS regulator; pressure/gas engineer; recognised hazardous-area certification route.","Electrical/gas regulator; scoped fuel-cell certifier/laboratory; qualified system engineer.","Electrical regulator/RECS; accepted laboratory; CEC; network.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["H2","PRESSURE","GASFUELCELL","IECEX","FUEL","INV","PCE","WIRING","INSTALL","GRID","NER","STD-FCSYS","STD-FCMOD","STD-GENSET","MACHINE","DESIGNPLANT","ITEMPLANT"]},{"id":"RRE18-C06-S06","name":"Hydrogen Refuelling Infrastructure","category_id":"RRE18-C06","category_name":"Hydrogen Energy & Fuel Cell Systems","profile_ids":["H2","PRESS","DG","ENV"],"verified_product_approval":false,"standard_ids":["H2STATION","H2DISP","H2FUEL","PRESSCLASS","VESSEL","EX","ADGCODE"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Verify dispenser, compressor, storage, pressure-relief and vehicle-interface conformity separately.","installation_or_project":"Gas/dangerous-goods and planning approval, hazardous zones, emergency shutdown and pressure registrations.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas/petroleum safety regulator; WHS regulator; pressure/gas engineer; recognised hazardous-area certification route.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["H2","PRESSURE","GASFUELCELL","IECEX","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","ADG","UN","SEA","AIR","ENV","STANDARD","STD-H2STATION","STD-H2DISP","STD-H2FUEL"]},{"id":"RRE18-C06-S07","name":"Hydrogen Safety, Monitoring & Control Equipment","category_id":"RRE18-C06","category_name":"Hydrogen Energy & Fuel Cell Systems","profile_ids":["H2","ELECT","EMC","SMART","SWITCH"],"verified_product_approval":false,"standard_ids":["EX","TESTSAFE","MACHINE","FUNCSAFE","ICT"],"before_supply":"Obtain equipment certification for the actual hazardous zone/gas group where required, detector response/calibration and safety-function verification.","installation_or_project":"Detector placement, alarm/shutdown setpoints and proof-test intervals need the project hydrogen risk assessment.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas/petroleum safety regulator; WHS regulator; pressure/gas engineer; recognised hazardous-area certification route.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer."],"source_ids":["H2","PRESSURE","GASFUELCELL","IECEX","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","CYBER","PRIVACY","CLASSES","HV","STANDARD","MACHINE","STD-TESTSAFE","WHS","STD-FUNCSAFE","STD-ICT"]}]},{"id":"RRE18-C07","name":"Bioenergy & Waste-to-Energy Systems","subcategories":[{"id":"RRE18-C07-S01","name":"Biomass Energy Systems","category_id":"RRE18-C07","category_name":"Bioenergy & Waste-to-Energy Systems","profile_ids":["BIO","PRESS","ELECT","ENV"],"verified_product_approval":false,"standard_ids":["MACHINE","MACHINEELEC","BOILER","PRESSCLASS","EX","INDGAS"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Determine combustion appliance and boiler scope, fuel-feed/dust risks and emissions evidence.","installation_or_project":"EPA/planning permission, boiler/pressure registrations and combustion/gas acceptance.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas safety regulator; EPA/environment authority; WHS regulator; engineer; planning authority.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["BIO","WASTE","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","ENV","STANDARD","WHS","STD-MACHINEELEC","STD-BOILER","H2","IECEX","GASTYPE"]},{"id":"RRE18-C07-S02","name":"Biogas Generation & Digesters","category_id":"RRE18-C07","category_name":"Bioenergy & Waste-to-Energy Systems","profile_ids":["BIO","PRESS","ENV"],"verified_product_approval":false,"standard_ids":["PRESSCLASS","VESSEL","PIPING","EX","GASINSTALL","MACHINE"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Document digester pressure, biogas composition, gas train, relief and flare safety.","installation_or_project":"Gas authority acceptance, hazardous-area assessment, wastewater/waste and environmental approvals.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas safety regulator; EPA/environment authority; WHS regulator; engineer; planning authority.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["BIO","WASTE","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","ENV","STANDARD","STD-PIPING","H2","IECEX","STD-GASINSTALL","WHS"]},{"id":"RRE18-C07-S03","name":"Biomass Boilers & Generators","category_id":"RRE18-C07","category_name":"Bioenergy & Waste-to-Energy Systems","profile_ids":["BIO","PRESS","ELECT","INSTALL","GRID"],"verified_product_approval":false,"standard_ids":["BOILER","PRESSCLASS","VESSEL","INDGAS","GENSET","MOTORGEMS"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Provide boiler design verification, combustion safety and generator electrical records.","installation_or_project":"Plant registration, emissions licence, gas/combustion acceptance and electrical connection.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas safety regulator; EPA/environment authority; WHS regulator; engineer; planning authority.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["BIO","WASTE","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","GRID","NER","INV","STD-BOILER","GASTYPE","STD-GENSET","GEMSMOTOR"]},{"id":"RRE18-C07-S04","name":"Biofuel Production Equipment","category_id":"RRE18-C07","category_name":"Bioenergy & Waste-to-Energy Systems","profile_ids":["BIO","FUELLAW","PRESS","DG","ENV"],"verified_product_approval":false,"standard_ids":["MACHINE","MACHINEELEC","EX","PRESSCLASS","PIPING"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Assess flammable liquids, chemical processing and hazardous-area equipment.","installation_or_project":"Chemical/DG licences, environmental permission and fuel-quality obligations if finished fuel is sold.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas safety regulator; EPA/environment authority; WHS regulator; engineer; planning authority.","DCCEEW fuel-quality regulator; scoped chemical test laboratory.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["BIO","WASTE","FUELLAW","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","ADG","UN","SEA","AIR","ENV","STANDARD","WHS","STD-MACHINEELEC","H2","IECEX","STD-PIPING"]},{"id":"RRE18-C07-S05","name":"Waste-to-Energy Systems","category_id":"RRE18-C07","category_name":"Bioenergy & Waste-to-Energy Systems","profile_ids":["BIO","PRESS","ELECT","ENV","GRID"],"verified_product_approval":false,"standard_ids":["MACHINE","BOILER","PRESSCLASS","EX","INDGAS"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Supply waste-feed limits, process safety and emissions-performance evidence.","installation_or_project":"Waste treatment and energy-recovery permissions, environmental assessment and pressure/gas approvals.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas safety regulator; EPA/environment authority; WHS regulator; engineer; planning authority.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["BIO","WASTE","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","ENV","STANDARD","GRID","NER","INV","WHS","STD-BOILER","H2","IECEX","GASTYPE"]},{"id":"RRE18-C07-S06","name":"Bioenergy Processing & Handling Equipment","category_id":"RRE18-C07","category_name":"Bioenergy & Waste-to-Energy Systems","profile_ids":["BIO","PRESS","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["MACHINE","MACHINEELEC","FUNCSAFE","EX","MOTORGEMS"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Assess conveyors, shredders, dust explosion and stored mechanical energy; GEMS applies to covered motor supply.","installation_or_project":"Guarding, extraction/explosion controls, safe access and site operator training.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State gas safety regulator; EPA/environment authority; WHS regulator; engineer; planning authority.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["BIO","WASTE","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WHS","STD-MACHINEELEC","STD-FUNCSAFE","H2","IECEX","GEMSMOTOR"]}]},{"id":"RRE18-C08","name":"Geothermal Energy Systems","subcategories":[{"id":"RRE18-C08-S01","name":"Ground-Source Heat Exchange Systems","category_id":"RRE18-C08","category_name":"Geothermal Energy Systems","profile_ids":["GEO","HEAT","WATER"],"verified_product_approval":false,"standard_ids":["HP","REFRIG","ACGEMS","PLUMBSTD","PRESSCLASS"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Confirm ground-loop type; the ≤65 kW air-conditioner GEMS determination does not automatically cover ground-loop products. Provide refrigerant/heat-exchanger safety records.","installation_or_project":"Groundwater/drilling consent, plumbing separation, pressure and refrigeration work licensing.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State resources/water/environment authority; licensed drilling contractor; project engineer.","Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory."],"source_ids":["GEO","WATER","ENV","SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","POTABLE","PLUMB","WELS","STD-HP","STD-REFRIG","DESIGNPLANT","ITEMPLANT"]},{"id":"RRE18-C08-S02","name":"Direct Geothermal Heating Equipment","category_id":"RRE18-C08","category_name":"Geothermal Energy Systems","profile_ids":["GEO","HEAT","PRESS","WATER"],"verified_product_approval":false,"standard_ids":["PRESSCLASS","PIPING","VESSEL","PLUMBSTD"],"before_supply":"Supply heat exchanger pressure/material/corrosion and water-contact evidence; classify any electric or gas auxiliaries separately.","installation_or_project":"Geothermal resource/water rights, hot-water pressure design and discharge conditions.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State resources/water/environment authority; licensed drilling contractor; project engineer.","Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory."],"source_ids":["GEO","WATER","ENV","SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","POTABLE","PLUMB","WELS","STD-PIPING"]},{"id":"RRE18-C08-S03","name":"Geothermal Power Generation Systems","category_id":"RRE18-C08","category_name":"Geothermal Energy Systems","profile_ids":["GEO","PRESS","TX","GRID","ENV"],"verified_product_approval":false,"standard_ids":["HV","GENSET","MACHINE","PRESSCLASS","PIPING"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Document geothermal-fluid and generator pressure/electrical performance.","installation_or_project":"Resources/exploration/production, water/environment approvals and AEMO/network connection.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State resources/water/environment authority; licensed drilling contractor; project engineer.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["GEO","WATER","ENV","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","HV","TX","GEMSTX","GRID","NER","INV","STANDARD","STD-HV","STD-GENSET","WHS","STD-PIPING"]},{"id":"RRE18-C08-S04","name":"Geothermal Drilling & Heat Exchange Components","category_id":"RRE18-C08","category_name":"Geothermal Energy Systems","profile_ids":["GEO","PRESS","WATER"],"verified_product_approval":false,"standard_ids":["MACHINE","PIPING","PRESSCLASS","MOTORGEMS"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Provide drilling-machine safety and component material/pressure evidence; covered electric motors follow GEMS.","installation_or_project":"Licensed drilling, underground service checks and geothermal/water permit conditions.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State resources/water/environment authority; licensed drilling contractor; project engineer.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory."],"source_ids":["GEO","WATER","ENV","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","POTABLE","PLUMB","WATERMARK","WELS","WHS","STD-PIPING","GEMSMOTOR"]},{"id":"RRE18-C08-S05","name":"Geothermal Monitoring & Controls","category_id":"RRE18-C08","category_name":"Geothermal Energy Systems","profile_ids":["EMC","SMART","METER"],"verified_product_approval":false,"standard_ids":["ICT","TESTSAFE","CYBERTECH","EX","FUNCSAFE"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Calibrate temperature/pressure monitoring and validate safety shutdown functions.","installation_or_project":"Site-specific geothermal gas/pressure hazards determine Ex and functional protection requirements.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["ACMA; responsible supplier; appropriately scoped testing laboratory.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","National Measurement Institute; authorised verifier; metering coordinator/network when relevant."],"source_ids":["ACMA","ACMA2","CYBER","PRIVACY","METER","NER","STD-ICT","STD-TESTSAFE","STD-CYBERTECH","H2","MACHINE","IECEX","STD-FUNCSAFE"]}]},{"id":"RRE18-C09","name":"Electric Vehicle Charging & Infrastructure","subcategories":[{"id":"RRE18-C09-S01","name":"Residential AC EV Chargers","category_id":"RRE18-C09","category_name":"Electric Vehicle Charging & Infrastructure","profile_ids":["EV","ELECT","EMC","INSTALL","SMART"],"verified_product_approval":false,"standard_ids":["EVAC","EVPLUG","EVRDC","WIRE","CLASS","RCD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Obtain EVSE safety/EMC evidence and document RCD/RDC-DD arrangements; EVSE future class changes commence 12 February 2028.","installation_or_project":"Dedicated circuit, protection, earthing, load capacity and licensed installation.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Licensed electrical contractor; local electrical regulator; inspector where required.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator."],"source_ids":["EV","CLASSES","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WIRING","INSTALL","CYBER","PRIVACY","STD-EVAC","STD-EVPLUG","STD-EVRDC","STD-WIRE","STD-CLASS"]},{"id":"RRE18-C09-S02","name":"Commercial & Public AC EV Chargers","category_id":"RRE18-C09","category_name":"Electric Vehicle Charging & Infrastructure","profile_ids":["EV","ELECT","EMC","INSTALL","SMART","ENV"],"verified_product_approval":false,"standard_ids":["EVAC","EVPLUG","EVRDC","METERSTD","ICT","RCD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Include public-use robustness, payment/communications and trade-measurement assessment where charging by measured energy.","installation_or_project":"Site access, building/planning, network capacity and meter-verification rules where applicable.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Licensed electrical contractor; local electrical regulator; inspector where required.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["EV","CLASSES","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WIRING","INSTALL","CYBER","PRIVACY","ENV","STANDARD","STD-EVAC","STD-EVPLUG","STD-EVRDC","METER","NER","STD-ICT"]},{"id":"RRE18-C09-S03","name":"DC Fast & Ultra-Fast EV Chargers","category_id":"RRE18-C09","category_name":"Electric Vehicle Charging & Infrastructure","profile_ids":["EV","PCE","ELECT","EMC","TX","INSTALL"],"verified_product_approval":false,"standard_ids":["EVDC","EVAC","EVPLUG","PCESAFE","ICT"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Verify DC output ratings, connector cooling, fault protection and charge-control configuration.","installation_or_project":"Network capacity, HV supply if needed, installation and public-site safety/access.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority.","Electrical regulator/RECS; accepted laboratory; CEC; network.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["EV","CLASSES","INV","PCE","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","HV","TX","GEMSTX","WIRING","INSTALL","STD-EVDC","STD-EVAC","STD-EVPLUG","STD-PCESAFE","STD-ICT"]},{"id":"RRE18-C09-S04","name":"Solar-Integrated EV Charging Systems","category_id":"RRE18-C09","category_name":"Electric Vehicle Charging & Infrastructure","profile_ids":["EV","PV","BAT","PCE","INSTALL","GRID"],"verified_product_approval":false,"standard_ids":["EVAC","EVDC","EVPLUG","PVPERF","PVSAFE","INVGRID","STRUCTLOAD","RCD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Supply separate evidence for charger, PV, inverter, storage and structural components.","installation_or_project":"PV and EV circuit design, demand management, carport/site approvals and network connection.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority.","IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","Electrical regulator/RECS; accepted laboratory; CEC; network.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["EV","CLASSES","PV","PV61215","CEC","BAT","CELL","CELL2","INSTALL","INV","PCE","WIRING","GRID","NER","STD-EVAC","STD-EVDC","STD-EVPLUG","STRUCT","STANDARD"]},{"id":"RRE18-C09-S05","name":"Bidirectional Charging (V2G/V2H/V2B)","category_id":"RRE18-C09","category_name":"Electric Vehicle Charging & Infrastructure","profile_ids":["EV","PCE","ELECT","EMC","INSTALL","GRID"],"verified_product_approval":false,"standard_ids":["EVAC","EVDC","INVGRID","INVCONNECT","PCESAFE"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Obtain bidirectional/grid-interface evidence; CEC/network pathway covers in-scope V2G with Amendment 2:2024.","installation_or_project":"Vehicle/charger pairing, island/backup modes, transfer protection and DNSP permission.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority.","Electrical regulator/RECS; accepted laboratory; CEC; network.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["EV","CLASSES","INV","PCE","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WIRING","INSTALL","GRID","NER","STD-EVAC","STD-EVDC","STD-INVCONNECT","STD-PCESAFE"]},{"id":"RRE18-C09-S06","name":"Electric Fleet & Depot Charging Systems","category_id":"RRE18-C09","category_name":"Electric Vehicle Charging & Infrastructure","profile_ids":["EV","TX","INSTALL","GRID","SMART","ENV"],"verified_product_approval":false,"standard_ids":["EVAC","EVDC","EVPLUG","HV","LVBOARD","ICT"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Provide coordinated charger, switchboard and fleet load-control evidence.","installation_or_project":"Depot demand/connection studies, charging diversity, protection, earthing and emergency access.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["EV","CLASSES","HV","TX","GEMSTX","WIRING","INSTALL","GRID","NER","INV","CYBER","PRIVACY","ENV","STANDARD","STD-EVAC","STD-EVDC","STD-EVPLUG","STD-HV","STD-LVBOARD","STD-ICT"]},{"id":"RRE18-C09-S07","name":"EV Charging Components & Accessories","category_id":"RRE18-C09","category_name":"Electric Vehicle Charging & Infrastructure","profile_ids":["EV","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["EVPLUG","EVPORT","EVRDC","MAINSPLUG","ESSENTIAL"],"before_supply":"Select connector, Mode 2 cord/control, RDC-DD or power accessory by actual function. Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. A compliant connector does not certify an assembled charger.","installation_or_project":"Connector mating, cable thermal limits, upstream protection and host compatibility.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["EV","CLASSES","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","STD-EVPLUG","STD-EVPORT","STD-EVRDC"]}]},{"id":"RRE18-C10","name":"Grid, Power Distribution & Microgrids","subcategories":[{"id":"RRE18-C10-S01","name":"Grid Connection & Integration Equipment","category_id":"RRE18-C10","category_name":"Grid, Power Distribution & Microgrids","profile_ids":["GRID","PCE","SWITCH","INSTALL"],"verified_product_approval":false,"standard_ids":["INVGRID","INVCONNECT","HV","LVBOARD","RELAY"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Provide interface protection, accepted inverter/relay tests and network-design evidence.","installation_or_project":"DNSP/TNSP studies and negotiated protection/settings; AEMO obligations for relevant plant.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Electrical regulator/RECS; accepted laboratory; CEC; network.","Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["GRID","NER","INV","PCE","CLASSES","HV","STANDARD","WIRING","INSTALL","STD-INVCONNECT","STD-HV","STD-LVBOARD"]},{"id":"RRE18-C10-S02","name":"Distribution Transformers","category_id":"RRE18-C10","category_name":"Grid, Power Distribution & Microgrids","profile_ids":["TX","EFF","ELECT"],"verified_product_approval":false,"standard_ids":["TXFAMILY","TXDRY","TXGEMS","HV"],"before_supply":"Identify transformer type/rating and whether GEMS Distribution Transformers Determination 2012 applies. Obtain registration before covered supply, plus routine/type tests and efficiency evidence to mandated editions.","installation_or_project":"HV/LV design, earthing, fire/containment and network procurement acceptance.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","GEMS Regulator / Energy Rating.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["HV","TX","GEMSTX","GEMS","EESS","NSW","CERT","EESSSELECT","EESSDOC","STD-TXDRY","STD-HV"]},{"id":"RRE18-C10-S03","name":"Transmission & Distribution Equipment","category_id":"RRE18-C10","category_name":"Grid, Power Distribution & Microgrids","profile_ids":["TX","GRID","ENV"],"verified_product_approval":false,"standard_ids":["HV","HVBOARD","TXFAMILY","RELAY","STRUCTLOAD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Provide network-grade type/routine tests, insulation ratings, mechanical and short-circuit evidence.","installation_or_project":"Network-owned installations and assets require owner specifications and project approvals.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["HV","TX","GEMSTX","GRID","NER","INV","ENV","STANDARD","STD-HV","STRUCT"]},{"id":"RRE18-C10-S04","name":"Substation & Power Distribution Assemblies","category_id":"RRE18-C10","category_name":"Grid, Power Distribution & Microgrids","profile_ids":["TX","SWITCH","GRID","STRUCT"],"verified_product_approval":false,"standard_ids":["HV","HVBOARD","LVBOARD","RELAY","EARTH"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Supply assembly design verification and each delivered assembly’s routine verification; component certificates alone are insufficient.","installation_or_project":"Substation HV/LV boundaries, earthing, arc hazards, access and network protection coordination.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["HV","TX","GEMSTX","CLASSES","STANDARD","GRID","NER","INV","STRUCT","STD-HV","STD-LVBOARD","WIRING"]},{"id":"RRE18-C10-S05","name":"Microgrid Electrical Infrastructure","category_id":"RRE18-C10","category_name":"Grid, Power Distribution & Microgrids","profile_ids":["GRID","TX","OFFGRID","INSTALL"],"verified_product_approval":false,"standard_ids":["WIRE","HV","LVBOARD","INVGRID","OFF1","GENSET"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Document grid-parallel versus islanded modes, switchgear and controller compatibility.","installation_or_project":"Microgrid licensing/exemption, protection, switching/earthing and connection approval.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["GRID","NER","INV","HV","TX","GEMSTX","INSTALL","STANDARD","WIRING","STD-WIRE","STD-HV","STD-LVBOARD","STD-OFF1","STD-GENSET"]},{"id":"RRE18-C10-S06","name":"Power Quality & Grid Stabilisation Equipment","category_id":"RRE18-C10","category_name":"Grid, Power Distribution & Microgrids","profile_ids":["PCE","TX","EMC","GRID"],"verified_product_approval":false,"standard_ids":["PCESAFE","PCEHV","HV","RELAY"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Provide harmonic, reactive power, control-stability and fault-duty performance records.","installation_or_project":"Network power-quality limits and project-specific control/protection studies.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS; accepted laboratory; CEC; network.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable."],"source_ids":["INV","PCE","HV","TX","GEMSTX","ACMA","ACMA2","GRID","NER","STD-PCESAFE","STD-PCEHV","STD-HV","STANDARD"]},{"id":"RRE18-C10-S07","name":"Grid Interconnection & Synchronisation Equipment","category_id":"RRE18-C10","category_name":"Grid, Power Distribution & Microgrids","profile_ids":["GRID","SWITCH","PCE","EMC"],"verified_product_approval":false,"standard_ids":["RELAY","INVGRID","HV","LVBOARD","FUNCSAFE"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Validate synchronising, loss-of-mains and trip/control failure behaviour.","installation_or_project":"Network-approved settings, interlocks and witnessed commissioning as required.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","Electrical regulator/RECS; accepted laboratory; CEC; network.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["GRID","NER","INV","CLASSES","HV","STANDARD","PCE","ACMA","ACMA2","STD-HV","STD-LVBOARD","STD-FUNCSAFE"]}]},{"id":"RRE18-C11","name":"Electrical Balance of System Components","subcategories":[{"id":"RRE18-C11-S01","name":"Solar PV & DC Electrical Cables","category_id":"RRE18-C11","category_name":"Electrical Balance of System Components","profile_ids":["CABLE","INSTALL"],"verified_product_approval":false,"standard_ids":["PVCABLE","ACCABLE","CABLESIZE","ARRAY"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Provide cable voltage, current, temperature, UV and flame/mechanical test evidence; classify building-wire scope separately from PV DC cable.","installation_or_project":"Cable sizing, routing, mechanical protection, terminations and voltage drop.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CABLE","CONNECT","BOX","CLASSES","CABLESIZE","WIRING","INSTALL","STD-PVCABLE","STD-ARRAY"]},{"id":"RRE18-C11-S02","name":"AC Power Cables & Wiring","category_id":"RRE18-C11","category_name":"Electrical Balance of System Components","profile_ids":["CABLE","ELECT","INSTALL"],"verified_product_approval":false,"standard_ids":["ACCABLE","CABLESIZE","WIRE","CLASS"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Building cables within declared class need the required approval, including Australian colour/construction rules.","installation_or_project":"Correct cable selection for installation method, grouping, temperature and short-circuit duty.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CABLE","CONNECT","BOX","CLASSES","CABLESIZE","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","STD-WIRE","STD-CLASS"]},{"id":"RRE18-C11-S03","name":"Electrical Connectors & Terminals","category_id":"RRE18-C11","category_name":"Electrical Balance of System Components","profile_ids":["CABLE","ELECT","INSTALL"],"verified_product_approval":false,"standard_ids":["PVPLUG","MAINSPLUG","ESSENTIAL","ARRAY"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Select PV DC versus mains/industrial connectors; provide approved mating pairs and terminal conductor/rating limits.","installation_or_project":"Avoid unsupported cross-mating; use manufacturer crimp/torque instructions and the correct enclosure rating.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CABLE","CONNECT","BOX","CLASSES","CABLESIZE","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","STD-PVPLUG","STD-ARRAY"]},{"id":"RRE18-C11-S04","name":"DC Combiner & Junction Boxes","category_id":"RRE18-C11","category_name":"Electrical Balance of System Components","profile_ids":["CABLE","SWITCH","INSTALL"],"verified_product_approval":false,"standard_ids":["LVBOARD","PVBOX","EMPTYBOX","IP","ARRAY"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Module junction-box standard differs from combiner-assembly verification; verify fitted protection, busbars, insulation and temperature rise.","installation_or_project":"String fault currents, voltage ratings, isolation, IP and installation access.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.","Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CABLE","CONNECT","BOX","CLASSES","CABLESIZE","HV","STANDARD","WIRING","INSTALL","STD-LVBOARD","STD-PVBOX","STD-EMPTYBOX","STD-IP","STD-ARRAY"]},{"id":"RRE18-C11-S05","name":"Cable Management & Conduit Systems","category_id":"RRE18-C11","category_name":"Electrical Balance of System Components","profile_ids":["CABLE","INSTALL","STRUCT"],"verified_product_approval":false,"standard_ids":["CONDUIT","IP","WIRE"],"before_supply":"Supply material, mechanical duty, UV/fire and load-support evidence for actual conduit/tray type; fittings with electrical functions follow electrical classification.","installation_or_project":"Installation routing, support spacing, segregation and building fire penetrations.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.","Licensed electrical contractor; local electrical regulator; inspector where required.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["CABLE","CONNECT","BOX","CLASSES","CABLESIZE","WIRING","INSTALL","STRUCT","STANDARD","STD-IP","STD-WIRE"]},{"id":"RRE18-C11-S06","name":"Earthing, Grounding & Bonding Components","category_id":"RRE18-C11","category_name":"Electrical Balance of System Components","profile_ids":["INSTALL","CABLE","TX"],"verified_product_approval":false,"standard_ids":["EARTH","WIRE","HV"],"before_supply":"Provide conductor/clamp continuity, corrosion, mechanical and fault-current suitability; distinguish bonding component evidence from full earth-grid design.","installation_or_project":"Earthing calculations, equipotential bonding and verification for actual fault duty.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Licensed electrical contractor; local electrical regulator; inspector where required.","Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers."],"source_ids":["WIRING","INSTALL","CABLE","CONNECT","BOX","CLASSES","CABLESIZE","HV","TX","GEMSTX","STD-WIRE","STD-HV"]},{"id":"RRE18-C11-S07","name":"Electrical Enclosures & Connection Accessories","category_id":"RRE18-C11","category_name":"Electrical Balance of System Components","profile_ids":["CABLE","ELECT","INSTALL"],"verified_product_approval":false,"standard_ids":["EMPTYBOX","IP","LVBOARD","ESSENTIAL"],"before_supply":"Test claimed IP/material/environmental performance. If supplied fitted/energised, assess the completed electrical assembly and its regulated components.","installation_or_project":"Ventilation, heat rise, corrosion, cable entries and enclosure bonding.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CABLE","CONNECT","BOX","CLASSES","CABLESIZE","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","STD-EMPTYBOX","STD-IP","STD-LVBOARD"]}]},{"id":"RRE18-C12","name":"Switchgear, Electrical Protection & Safety","subcategories":[{"id":"RRE18-C12-S01","name":"AC & DC Circuit Breakers","category_id":"RRE18-C12","category_name":"Switchgear, Electrical Protection & Safety","profile_ids":["SWITCH","ELECT","INSTALL"],"verified_product_approval":false,"standard_ids":["BREAKER","MCB","CLASS","WIRE","RCD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Select household versus industrial breaker, AC/DC rating, pole arrangement, breaking capacity and applicable national standard.","installation_or_project":"Discrimination/coordination, prospective fault current and PV/battery DC duty.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CLASSES","HV","STANDARD","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","STD-BREAKER","STD-MCB","STD-CLASS","STD-WIRE"]},{"id":"RRE18-C12-S02","name":"Isolation Switches & Disconnectors","category_id":"RRE18-C12","category_name":"Switchgear, Electrical Protection & Safety","profile_ids":["SWITCH","ELECT","INSTALL"],"verified_product_approval":false,"standard_ids":["ISOLATOR","CLASS","ARRAY"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. DC isolators meeting the definition need the required class certificate; verify utilisation category, DC pole configuration and terminal heating.","installation_or_project":"Isolation position, switching duty, water ingress and PV array compliance.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CLASSES","HV","STANDARD","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","STD-CLASS","STD-ARRAY"]},{"id":"RRE18-C12-S03","name":"Surge Protection & Lightning Protection","category_id":"RRE18-C12","category_name":"Switchgear, Electrical Protection & Safety","profile_ids":["SWITCH","INSTALL","STRUCT"],"verified_product_approval":false,"standard_ids":["PVSPD","DCSPD","LIGHTNING","EARTH","ACSPD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Select PV DC, other DC or AC SPD product standard; retain surge-rating and coordination evidence.","installation_or_project":"Lightning risk, bonding and coordinated installation; a surge device alone is not a lightning protection system.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","Licensed electrical contractor; local electrical regulator; inspector where required.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["CLASSES","HV","STANDARD","WIRING","INSTALL","STRUCT","STD-PVSPD","STD-DCSPD","STD-LIGHTNING","STD-ACSPD"]},{"id":"RRE18-C12-S04","name":"Fuses & Protection Accessories","category_id":"RRE18-C12","category_name":"Switchgear, Electrical Protection & Safety","profile_ids":["SWITCH","ELECT","INSTALL"],"verified_product_approval":false,"standard_ids":["PVFUSE","ESSENTIAL","ARRAY"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Select fuse family and holder standard for the actual DC/AC application; validate breaking capacity and time-current curves.","installation_or_project":"Fault protection and coordination with cables, strings, battery and converters.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CLASSES","HV","STANDARD","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","STD-PVFUSE","STD-ARRAY"]},{"id":"RRE18-C12-S05","name":"Switchboards & Distribution Boards","category_id":"RRE18-C12","category_name":"Switchgear, Electrical Protection & Safety","profile_ids":["SWITCH","ELECT","INSTALL","TX"],"verified_product_approval":false,"standard_ids":["LVBOARD","HVBOARD","CLASS","RCD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Complete design and routine verification to applicable assembly part/edition; report configuration, current, fault rating and design substitutions.","installation_or_project":"Board installation and protective coordination; HV switchgear uses separate scope.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers."],"source_ids":["CLASSES","HV","STANDARD","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","TX","GEMSTX","STD-LVBOARD","STD-CLASS"]},{"id":"RRE18-C12-S06","name":"Protection Relays & Safety Controllers","category_id":"RRE18-C12","category_name":"Switchgear, Electrical Protection & Safety","profile_ids":["SWITCH","ELECT","EMC","PRESS"],"verified_product_approval":false,"standard_ids":["RELAY","MACHINE","FUNCSAFE","ICT"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Validate relay/controller safety, EMC and safety function. Functional-safety performance belongs to the complete defined function.","installation_or_project":"Setpoints, selectivity, fail-safe interfaces and proof/commissioning tests.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector."],"source_ids":["CLASSES","HV","STANDARD","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","GRID","WHS","STD-FUNCSAFE","STD-ICT"]},{"id":"RRE18-C12-S07","name":"Electrical Safety & Emergency Shutdown Systems","category_id":"RRE18-C12","category_name":"Switchgear, Electrical Protection & Safety","profile_ids":["SWITCH","ELECT","EMC","INSTALL"],"verified_product_approval":false,"standard_ids":["MACHINE","FUNCSAFE","RELAY","ARRAY","BATSITE","RCD"],"before_supply":"Prepare a shutdown safety-function specification, failure-mode assessment, response-time tests and interlock/control evidence. Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met.","installation_or_project":"Define exactly what remains live after shutdown; validate complete PV/battery/process isolation and emergency response.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CLASSES","HV","STANDARD","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WIRING","INSTALL","MACHINE","WHS","STD-FUNCSAFE","GRID","STD-ARRAY","STD-BATSITE"]}]},{"id":"RRE18-C13","name":"Mounting, Racking & Structural Systems","subcategories":[{"id":"RRE18-C13-S01","name":"Residential Rooftop Solar Mounting","category_id":"RRE18-C13","category_name":"Mounting, Racking & Structural Systems","profile_ids":["STRUCT","INSTALL"],"verified_product_approval":false,"standard_ids":["STRUCTLOAD","ALUMINIUM","STEEL","ANCHOR","ARRAY"],"before_supply":"Supply site-design inputs, allowable loads, material properties, corrosion class and fastener test evidence. Provide engineering calculations and drawings for the actual roof/soil and wind region; a rail test alone does not certify the structure.","installation_or_project":"Roof condition/attachment, wind pressure zones, waterproofing and local building acceptance.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["STRUCT","STANDARD","WIRING","INSTALL","STD-ALUMINIUM","STD-STEEL","STD-ANCHOR","STD-ARRAY"]},{"id":"RRE18-C13-S02","name":"Commercial & Industrial Rooftop Mounting","category_id":"RRE18-C13","category_name":"Mounting, Racking & Structural Systems","profile_ids":["STRUCT","INSTALL","ENV"],"verified_product_approval":false,"standard_ids":["STRUCTLOAD","STEEL","ALUMINIUM","ANCHOR","CONCRETE"],"before_supply":"Supply site-design inputs, allowable loads, material properties, corrosion class and fastener test evidence. Provide engineering calculations and drawings for the actual roof/soil and wind region; a rail test alone does not certify the structure.","installation_or_project":"Commercial roof load reserve, access, fire/maintenance clearances and structural sign-off.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","Licensed electrical contractor; local electrical regulator; inspector where required.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["STRUCT","STANDARD","WIRING","INSTALL","ENV","STD-STEEL","STD-ALUMINIUM","STD-ANCHOR","STD-CONCRETE"]},{"id":"RRE18-C13-S03","name":"Ground-Mounted Solar Structures","category_id":"RRE18-C13","category_name":"Mounting, Racking & Structural Systems","profile_ids":["STRUCT","INSTALL","ENV"],"verified_product_approval":false,"standard_ids":["STRUCTLOAD","STEEL","CONCRETE","ANCHOR","GALV"],"before_supply":"Supply site-design inputs, allowable loads, material properties, corrosion class and fastener test evidence. Provide engineering calculations and drawings for the actual roof/soil and wind region; a rail test alone does not certify the structure.","installation_or_project":"Geotechnical design, uplift/flood/corrosion, foundation construction and planning approval.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","Licensed electrical contractor; local electrical regulator; inspector where required.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["STRUCT","STANDARD","WIRING","INSTALL","ENV","STD-STEEL","STD-CONCRETE","STD-ANCHOR","STD-GALV"]},{"id":"RRE18-C13-S04","name":"Solar Tracking Systems","category_id":"RRE18-C13","category_name":"Mounting, Racking & Structural Systems","profile_ids":["STRUCT","PRESS","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["STRUCTLOAD","STEEL","MACHINE","MACHINEELEC","FUNCSAFE"],"before_supply":"Supply site-design inputs, allowable loads, material properties, corrosion class and fastener test evidence. Provide engineering calculations and drawings for the actual roof/soil and wind region; a rail test alone does not certify the structure. Provide drive/guarding, stow/failure logic, wind limits and functional-control evidence.","installation_or_project":"Tracker sweep/exclusion zones, emergency stop, site wind envelope and foundation design.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["STRUCT","STANDARD","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","STD-STEEL","WHS","STD-MACHINEELEC","STD-FUNCSAFE"]},{"id":"RRE18-C13-S05","name":"Agrivoltaic & Agricultural Mounting Structures","category_id":"RRE18-C13","category_name":"Mounting, Racking & Structural Systems","profile_ids":["STRUCT","PRESS","ENV"],"verified_product_approval":false,"standard_ids":["STRUCTLOAD","STEEL","CONCRETE","MACHINE"],"before_supply":"Supply site-design inputs, allowable loads, material properties, corrosion class and fastener test evidence. Provide engineering calculations and drawings for the actual roof/soil and wind region; a rail test alone does not certify the structure. Document agricultural equipment/animal access and moving-part interfaces.","installation_or_project":"Farm access, clearance, collision, worker safety and land-use permissions.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["STRUCT","STANDARD","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","ENV","STD-STEEL","STD-CONCRETE","WHS"]},{"id":"RRE18-C13-S06","name":"Mounting Rails, Clamps, Foundations & Accessories","category_id":"RRE18-C13","category_name":"Mounting, Racking & Structural Systems","profile_ids":["STRUCT","INSTALL"],"verified_product_approval":false,"standard_ids":["ALUMINIUM","STEEL","ANCHOR","CONCRETE","GALV"],"before_supply":"Supply site-design inputs, allowable loads, material properties, corrosion class and fastener test evidence. Provide engineering calculations and drawings for the actual roof/soil and wind region; a rail test alone does not certify the structure. Match fastener/anchor approval and installation limits to actual substrate; AS 5216:2026 supersedes the 2021 catalogue edition.","installation_or_project":"Engineer system load paths, torque, embedment, edge distance and corrosion compatibility.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["STRUCT","STANDARD","WIRING","INSTALL","STD-ALUMINIUM","STD-STEEL","STD-ANCHOR","STD-CONCRETE","STD-GALV"]}]},{"id":"RRE18-C14","name":"Smart Energy, Monitoring & Automation","subcategories":[{"id":"RRE18-C14-S01","name":"Energy Management Systems (EMS)","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["SMART","EMC","ELECT"],"verified_product_approval":false,"standard_ids":["ICT","CYBERTECH","INVGRID"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Verify EMS interfaces and model/firmware compatibility; do not claim energy savings without evidence.","installation_or_project":"Safety/grid protection must remain effective on communication/software failure.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","ACMA; responsible supplier; appropriately scoped testing laboratory.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["CYBER","PRIVACY","ACMA","ACMA2","EESS","NSW","CERT","EESSSELECT","EESSDOC","STD-ICT","STD-CYBERTECH","INV"]},{"id":"RRE18-C14-S02","name":"Smart Energy Metering","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["METER","SMART","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["METERSTD","TESTSAFE","ICT"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Determine whether meter readings are used for trade: obtain NMI pattern approval and verification where required; market meters also follow applicable NER arrangements.","installation_or_project":"Metering coordinator/provider, installation seal/configuration and network/market rules.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["National Measurement Institute; authorised verifier; metering coordinator/network when relevant.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["METER","NER","CYBER","PRIVACY","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","STD-TESTSAFE","STD-ICT"]},{"id":"RRE18-C14-S03","name":"Solar & Battery Monitoring Systems","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["SMART","EMC","ELECT"],"verified_product_approval":false,"standard_ids":["ICT","TESTSAFE","CYBERTECH"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Provide accurate monitoring limits and approved inverter/battery interface evidence.","installation_or_project":"Monitoring is distinct from the protective function; configure alarms and access permissions.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","ACMA; responsible supplier; appropriately scoped testing laboratory.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["CYBER","PRIVACY","ACMA","ACMA2","EESS","NSW","CERT","EESSSELECT","EESSDOC","STD-ICT","STD-TESTSAFE","STD-CYBERTECH"]},{"id":"RRE18-C14-S04","name":"IoT Sensors, Gateways & Remote Telemetry","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["SMART","EMC","ELECT"],"verified_product_approval":false,"standard_ids":["ICT","TESTSAFE","CYBERTECH","EX"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Assess radio bands/licensing and sensor accuracy; hazardous-location sensors need appropriate Ex scope.","installation_or_project":"Communications coverage, zone classification and local alarm/control design.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","ACMA; responsible supplier; appropriately scoped testing laboratory.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["CYBER","PRIVACY","ACMA","ACMA2","EESS","NSW","CERT","EESSSELECT","EESSDOC","STD-ICT","STD-TESTSAFE","STD-CYBERTECH","H2","MACHINE","IECEX"]},{"id":"RRE18-C14-S05","name":"Industrial & Agricultural Automation","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["SMART","PRESS","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["MACHINE","MACHINEELEC","FUNCSAFE","ICT","CYBERTECH"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information.","installation_or_project":"Machine integration/guarding, safe states, operator controls and communications failure.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["CYBER","PRIVACY","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WHS","STD-MACHINEELEC","STD-FUNCSAFE","STD-ICT","STD-CYBERTECH"]},{"id":"RRE18-C14-S06","name":"AI Energy Optimisation & Predictive Maintenance","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["SMART"],"verified_product_approval":false,"standard_ids":["ICT","CYBERTECH","MACHINE","FUNCSAFE"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Substantiate optimisation/prediction claims and define decision limits, model changes and human overrides.","installation_or_project":"If software affects a safety function, validate the entire safety-control lifecycle; AI branding creates no exemption.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator."],"source_ids":["CYBER","PRIVACY","STD-ICT","STD-CYBERTECH","MACHINE","WHS","STD-FUNCSAFE"]},{"id":"RRE18-C14-S07","name":"Virtual Power Plant (VPP) Equipment & Controllers","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["SMART","GRID","PCE","EMC"],"verified_product_approval":false,"standard_ids":["ICT","CYBERTECH","INVGRID","METERSTD"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Document dispatch capability, consent/privacy and approved device/settings envelope.","installation_or_project":"Retailer/aggregator arrangements, network export limits, metering and relevant energy-market obligations.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Electrical regulator/RECS; accepted laboratory; CEC; network.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["CYBER","PRIVACY","GRID","NER","INV","PCE","ACMA","ACMA2","STD-ICT","STD-CYBERTECH","METER"]},{"id":"RRE18-C14-S08","name":"Remote Communications & Connectivity Equipment","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["SMART","EMC","ELECT"],"verified_product_approval":false,"standard_ids":["ICT","CYBERTECH","ESSENTIAL"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Classify radio transmitter/modem, carrier/network and mains power supplies separately.","installation_or_project":"ACMA band/licence rules, antennas, lightning protection and site mounting.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","ACMA; responsible supplier; appropriately scoped testing laboratory.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["CYBER","PRIVACY","ACMA","ACMA2","EESS","NSW","CERT","EESSSELECT","EESSDOC","STD-ICT","STD-CYBERTECH"]},{"id":"RRE18-C14-S09","name":"Drones, Robotics & Autonomous Inspection Systems","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["DRONE","SMART","EMC","PRESS"],"verified_product_approval":false,"standard_ids":["ROBOT","MACHINE","MACHINEELEC","ICT"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Provide drone identification and operational documentation; CASA operating permissions belong to the operator.","installation_or_project":"CASA registration/accreditation or RePL/ReOC/permissions according to operation; robotic inspection workplace risk assessment.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["CASA; WHS regulator; ACMA; competent robot safety assessor.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","ACMA; responsible supplier; appropriately scoped testing laboratory.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector."],"source_ids":["DRONE","MACHINE","CYBER","PRIVACY","ACMA","ACMA2","PRESSURE","PLANT","DESIGNPLANT","ITEMPLANT","STD-ROBOT","WHS","STD-MACHINEELEC","STD-ICT"]},{"id":"RRE18-C14-S10","name":"Building & Infrastructure Smart Control Systems","category_id":"RRE18-C14","category_name":"Smart Energy, Monitoring & Automation","profile_ids":["SMART","ELECT","EMC","INSTALL"],"verified_product_approval":false,"standard_ids":["ICT","CYBERTECH","MACHINE","FUNCSAFE"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Validate HVAC/building-control compatibility and any life-safety interfaces.","installation_or_project":"Building/fire system acceptance, licensed electrical work and safe fallback functions.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["CYBER","PRIVACY","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","WIRING","INSTALL","STD-ICT","STD-CYBERTECH","MACHINE","WHS","STD-FUNCSAFE"]}]},{"id":"RRE18-C15","name":"Off-Grid, Hybrid & Remote Power Systems","subcategories":[{"id":"RRE18-C15-S01","name":"Complete Off-Grid Solar Power Systems","category_id":"RRE18-C15","category_name":"Off-Grid, Hybrid & Remote Power Systems","profile_ids":["OFFGRID","PV","BAT","PCE","INSTALL"],"verified_product_approval":false,"standard_ids":["OFF1","OFF2","ARRAY","PVPERF","PVSAFE","BATSITE","PCESAFE"],"before_supply":"Obtain model-specific IEC certificates and reports with technology, factory and bill-of-materials coverage. Apply to CEC if selling for a scheme/network that requires listing; publish the active model identifier and expiry. Select the cell, battery and complete-system safety scopes separately. Obtain reports, BMS protective-function evidence, fault/fire documentation and lithium UN 38.3 summary. Use the CEC route when the intended scheme requires it. Provide a system integration and load/autonomy design file.","installation_or_project":"Stand-alone wiring, array/battery location, protection and commissioning.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","Electrical regulator/RECS; accepted laboratory; CEC; network.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["INSTALL","STANDARD","PV","PV61215","CEC","BAT","CELL","CELL2","INV","PCE","WIRING","STD-OFF1","STD-OFF2","STD-ARRAY","STD-BATSITE","STD-PCESAFE"]},{"id":"RRE18-C15-S02","name":"Hybrid Solar, Battery & Generator Systems","category_id":"RRE18-C15","category_name":"Off-Grid, Hybrid & Remote Power Systems","profile_ids":["OFFGRID","PV","BAT","PCE","INSTALL","DG"],"verified_product_approval":false,"standard_ids":["OFF1","OFF2","GENSET","ARRAY","BATSITE","PCESAFE"],"before_supply":"Select the cell, battery and complete-system safety scopes separately. Obtain reports, BMS protective-function evidence, fault/fire documentation and lithium UN 38.3 summary. Use the CEC route when the intended scheme requires it. Provide generator/inverter transfer, starting and interlock evidence with PV component approvals.","installation_or_project":"Generator exhaust/fuel, neutral/earthing, backup transfer and load design.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","Electrical regulator/RECS; accepted laboratory; CEC; network.","Licensed electrical contractor; local electrical regulator; inspector where required.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist."],"source_ids":["INSTALL","STANDARD","PV","PV61215","CEC","BAT","CELL","CELL2","INV","PCE","WIRING","ADG","UN","SEA","AIR","STD-OFF1","STD-OFF2","STD-GENSET","STD-ARRAY","STD-BATSITE","STD-PCESAFE"]},{"id":"RRE18-C15-S03","name":"Remote Community & Station Power Systems","category_id":"RRE18-C15","category_name":"Off-Grid, Hybrid & Remote Power Systems","profile_ids":["OFFGRID","INSTALL","GRID","ENV"],"verified_product_approval":false,"standard_ids":["OFF1","OFF2","GENSET","HV","WIRE"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Supply remote-system integration, environmental duty and maintainability records.","installation_or_project":"Community/site licences, network exemption where applicable, fuel/fire and local operator training.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","Licensed electrical contractor; local electrical regulator; inspector where required.","Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["INSTALL","STANDARD","WIRING","GRID","NER","INV","ENV","STD-OFF1","STD-OFF2","STD-GENSET","STD-HV","STD-WIRE"]},{"id":"RRE18-C15-S04","name":"Telecommunications Power & Backup Systems","category_id":"RRE18-C15","category_name":"Off-Grid, Hybrid & Remote Power Systems","profile_ids":["OFFGRID","ELECT","EMC","SMART"],"verified_product_approval":false,"standard_ids":["OFF1","BATSITE","LIIND","LEADSAFE","LEADVRLA","ICT"],"before_supply":"Select the cell, battery and complete-system safety scopes separately. Obtain reports, BMS protective-function evidence, fault/fire documentation and lithium UN 38.3 summary. Use the CEC route when the intended scheme requires it. State telecom DC voltage, backup duty and battery chemistry; include converter and mains interfaces.","installation_or_project":"Telecom power/cabling practices, ventilation, battery faults and remote access safety.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator."],"source_ids":["INSTALL","STANDARD","EESS","NSW","CERT","EESSSELECT","EESSDOC","ACMA","ACMA2","CYBER","PRIVACY","STD-OFF1","STD-BATSITE","STD-LIIND","STD-LEADSAFE","STD-LEADVRLA","STD-ICT"]},{"id":"RRE18-C15-S05","name":"Mobile & Transportable Power Systems","category_id":"RRE18-C15","category_name":"Off-Grid, Hybrid & Remote Power Systems","profile_ids":["OFFGRID","ELECT","DG","STRUCT"],"verified_product_approval":false,"standard_ids":["MOBILE","WIRE","LIPORT","UN38","GENSET","PCESAFE"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Determine whether the product is a connectable installation, portable generator or stationary container; test the supplied configuration.","installation_or_project":"Vehicle/transportable installation rules, supply leads, transfer, earthing and transport safety.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["INSTALL","STANDARD","EESS","NSW","CERT","EESSSELECT","EESSDOC","ADG","UN","SEA","AIR","STRUCT","STD-WIRE","STD-LIPORT","STD-GENSET","STD-PCESAFE"]},{"id":"RRE18-C15-S06","name":"Emergency & Disaster-Resilience Power Systems","category_id":"RRE18-C15","category_name":"Off-Grid, Hybrid & Remote Power Systems","profile_ids":["OFFGRID","INSTALL","DG","ENV"],"verified_product_approval":false,"standard_ids":["OFF1","GENSET","BATSITE","PCESAFE"],"before_supply":"Select the cell, battery and complete-system safety scopes separately. Obtain reports, BMS protective-function evidence, fault/fire documentation and lithium UN 38.3 summary. Use the CEC route when the intended scheme requires it. Provide emergency operating, isolation and safe-load connection instructions.","installation_or_project":"Disaster use does not waive wiring rules; authorised temporary supply and backfeed prevention.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","Licensed electrical contractor; local electrical regulator; inspector where required.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["INSTALL","STANDARD","WIRING","ADG","UN","SEA","AIR","ENV","STD-OFF1","STD-GENSET","STD-BATSITE","STD-PCESAFE"]},{"id":"RRE18-C15-S07","name":"Hybrid Power Controllers & Generator Integration","category_id":"RRE18-C15","category_name":"Off-Grid, Hybrid & Remote Power Systems","profile_ids":["OFFGRID","PCE","EMC","SWITCH"],"verified_product_approval":false,"standard_ids":["GENSET","PCESAFE","MACHINE","FUNCSAFE","INVGRID"],"before_supply":"Establish PV-input versus non-PV converter safety scope and electrical equipment classification. Obtain model/firmware-specific safety and EMC evidence; grid-connected products also need accepted grid-interface tests and network settings. Validate synchronising, transfer, generator shutdown and island/grid mode boundaries.","installation_or_project":"Commission interlocks, earthing/neutral switching and grid protection where parallel.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","Electrical regulator/RECS; accepted laboratory; CEC; network.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer."],"source_ids":["INSTALL","STANDARD","INV","PCE","ACMA","ACMA2","CLASSES","HV","STD-GENSET","STD-PCESAFE","MACHINE","WHS","STD-FUNCSAFE"]},{"id":"RRE18-C15-S08","name":"Remote Industrial & Mining Power Systems","category_id":"RRE18-C15","category_name":"Off-Grid, Hybrid & Remote Power Systems","profile_ids":["OFFGRID","TX","PRESS","ENV"],"verified_product_approval":false,"standard_ids":["OFF1","HV","EX","MACHINE","BATSITE","GENSET"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Identify mine hazardous zones, heavy-duty equipment and system protective evidence.","installation_or_project":"Mine-specific safety laws/engineering management plan, hazardous area and network/fuel approvals.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier."],"source_ids":["INSTALL","STANDARD","HV","TX","GEMSTX","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","ENV","STD-OFF1","STD-HV","H2","IECEX","WHS","STD-BATSITE","STD-GENSET"]}]},{"id":"RRE18-C16","name":"Thermal Energy, Heat Pumps & Energy Efficiency","subcategories":[{"id":"RRE18-C16-S01","name":"Solar Hot-Water Systems","category_id":"RRE18-C16","category_name":"Thermal Energy, Heat Pumps & Energy Efficiency","profile_ids":["HEAT","WATER","ELECT","STRUCT"],"verified_product_approval":false,"standard_ids":["SWHSTD","WATERHEAT","DRINK","PLUMBSTD"],"before_supply":"Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class. Provide CER-listed complete system records where STCs are claimed; classify electric booster separately.","installation_or_project":"Licensed plumbing/electrical work, roof loads, temperature control and pressure-relief/discharge.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","POTABLE","PLUMB","WELS","WATER","EESS","NSW","CERT","EESSSELECT","EESSDOC","STRUCT","STANDARD","CLASSES"]},{"id":"RRE18-C16-S02","name":"Solar Thermal Collectors & Components","category_id":"RRE18-C16","category_name":"Thermal Energy, Heat Pumps & Energy Efficiency","profile_ids":["HEAT","WATER","STRUCT"],"verified_product_approval":false,"standard_ids":["SOLTHERM","SWHSTD","DRINK","PRESSCLASS","PIPING"],"before_supply":"Supply collector pressure, thermal and durability test evidence; establish whether sold as a standalone component or a scheme-listed complete system. Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class.","installation_or_project":"Site thermal/pressure design, freeze/overheat controls, roof structure and safe fluid selection.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","POTABLE","PLUMB","WELS","WATER","STRUCT","STANDARD","STD-SOLTHERM","DESIGNPLANT","ITEMPLANT","STD-PIPING"]},{"id":"RRE18-C16-S03","name":"Heat-Pump Hot-Water Systems","category_id":"RRE18-C16","category_name":"Thermal Energy, Heat Pumps & Energy Efficiency","profile_ids":["HEAT","WATER","ELECT","EFF"],"verified_product_approval":false,"standard_ids":["HP","WATERHEAT","SWHSTD","REFRIG","DRINK","PLUMBSTD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class. Complete CER testing/listing for STCs. Do not treat the September 2026 GEMS exposure draft as enacted registration law.","installation_or_project":"Licensed plumbing/electrical/refrigerant work; new HPWH equipment-class definition starts 12 February 2027.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","GEMS Regulator / Energy Rating."],"source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","POTABLE","PLUMB","WELS","WATER","EESS","NSW","CERT","EESSSELECT","EESSDOC","GEMSTX","STD-HP","CLASSES","STD-REFRIG"]},{"id":"RRE18-C16-S04","name":"Air-Source & Ground-Source Heat Pumps","category_id":"RRE18-C16","category_name":"Thermal Energy, Heat Pumps & Energy Efficiency","profile_ids":["HEAT","ELECT","EFF","GEO"],"verified_product_approval":false,"standard_ids":["HP","REFRIG","ACGEMS","PLUMBSTD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Resolve air-source vs ground-loop and heating/cooling scope before GEMS assessment; register covered models before supply.","installation_or_project":"Refrigeration licensing, charge/location risk, heating-loop and electrical design.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","GEMS Regulator / Energy Rating.","State resources/water/environment authority; licensed drilling contractor; project engineer."],"source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","EESS","NSW","CERT","EESSSELECT","EESSDOC","GEMSTX","GEO","WATER","ENV","STD-HP","STD-REFRIG","PLUMB"]},{"id":"RRE18-C16-S05","name":"Commercial & Industrial Heat-Pump Systems","category_id":"RRE18-C16","category_name":"Thermal Energy, Heat Pumps & Energy Efficiency","profile_ids":["HEAT","PRESS","ELECT","EFF"],"verified_product_approval":false,"standard_ids":["HP","REFRIG","ACGEMS","PRESSCLASS","VESSEL","MACHINE"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Assess applicable air-conditioner/liquid-chiller GEMS determination and pressure equipment scope, not just residential heat-pump rules.","installation_or_project":"Pressure registration, refrigerant/ventilation safety and industrial process integration.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","GEMS Regulator / Energy Rating."],"source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","GEMSTX","STD-HP","STD-REFRIG","WHS"]},{"id":"RRE18-C16-S06","name":"Energy-Efficient HVAC & Ventilation","category_id":"RRE18-C16","category_name":"Thermal Energy, Heat Pumps & Energy Efficiency","profile_ids":["HEAT","ELECT","EFF","SMART"],"verified_product_approval":false,"standard_ids":["HP","REFRIG","ACGEMS","MOTORGEMS","ICT"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Register GEMS-covered air conditioners/motors and provide required ratings/labels; classify separate ventilation appliance parts.","installation_or_project":"Building energy provisions, fire/smoke interfaces and refrigeration/electrical installation.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","GEMS Regulator / Energy Rating.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator."],"source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","EESS","NSW","CERT","EESSSELECT","EESSDOC","GEMSTX","CYBER","PRIVACY","STD-HP","STD-REFRIG","GEMSMOTOR","STD-ICT"]},{"id":"RRE18-C16-S07","name":"Energy-Efficient Refrigeration & Cold Storage","category_id":"RRE18-C16","category_name":"Thermal Energy, Heat Pumps & Energy Efficiency","profile_ids":["HEAT","ELECT","EFF","PRESS"],"verified_product_approval":false,"standard_ids":["FRIDGE","REFRIG","COLDGEMS","PRESSCLASS"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Assess cabinet vs cold-room/process plant; register covered refrigerated cabinets under the 2024 determination and provide labels where required.","installation_or_project":"Refrigerant hazard, pressure plant, escape/alarm and cold-storage workplace requirements.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","GEMS Regulator / Energy Rating.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector."],"source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","EESS","NSW","CERT","EESSSELECT","EESSDOC","GEMSTX","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","STD-FRIDGE","STD-REFRIG"]},{"id":"RRE18-C16-S08","name":"Electric Heating & Industrial Electrification","category_id":"RRE18-C16","category_name":"Thermal Energy, Heat Pumps & Energy Efficiency","profile_ids":["HEAT","PRESS","ELECT","EFF"],"verified_product_approval":false,"standard_ids":["HEATELECT","MACHINEELEC","PRESSCLASS","MOTORGEMS"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Classify electric appliance versus industrial furnace/process machinery; heated pressure vessel/boiler and covered motors need their respective pathways.","installation_or_project":"Thermal/fire hazards, guarding, electrical load/network capacity and process pressure design.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","GEMS Regulator / Energy Rating."],"source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","GEMSTX","CLASSES","WHS","STD-MACHINEELEC","GEMSMOTOR"]},{"id":"RRE18-C16-S09","name":"Thermal Energy Storage & Load-Side Efficiency Equipment","category_id":"RRE18-C16","category_name":"Thermal Energy, Heat Pumps & Energy Efficiency","profile_ids":["HEAT","PRESS","WATER","STRUCT"],"verified_product_approval":false,"standard_ids":["PRESSCLASS","VESSEL","PIPING","HEATELECT","MACHINE"],"before_supply":"Identify hot-water, ice, phase-change or chemical storage medium. Provide material/thermal cycling, pressure and electrical/plant risk evidence relevant to that design.","installation_or_project":"Containment, expansion/relief, burn/fire exposure and project load-side integration.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","POTABLE","PLUMB","WELS","WATER","STRUCT","STANDARD","STD-PIPING","CLASSES","EESSSELECT","WHS"]}]},{"id":"RRE18-C17","name":"Renewable Water, Pumping & Agricultural Systems","subcategories":[{"id":"RRE18-C17-S01","name":"Solar Water Pumping Systems","category_id":"RRE18-C17","category_name":"Renewable Water, Pumping & Agricultural Systems","profile_ids":["WATER","PV","PCE","INSTALL","ELECT"],"verified_product_approval":false,"standard_ids":["PUMP","PUMPINT","MOTORGEMS","ARRAY","PCESAFE","PLUMBSTD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Supply PV, pump, controller and motor evidence separately; check covered motor and pump scope. Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class.","installation_or_project":"Water extraction/allocation, pumping duty, array wiring and plumbing/backflow design.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Electrical regulator/RECS; accepted laboratory; CEC; network.","Licensed electrical contractor; local electrical regulator; inspector where required.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["POTABLE","PLUMB","WATERMARK","WELS","WATER","PV","PV61215","CEC","INV","PCE","WIRING","INSTALL","EESS","NSW","CERT","EESSSELECT","EESSDOC","CLASSES","STD-PUMPINT","GEMSMOTOR","STD-ARRAY","STD-PCESAFE"]},{"id":"RRE18-C17-S02","name":"Bore & Submersible Pumping Systems","category_id":"RRE18-C17","category_name":"Renewable Water, Pumping & Agricultural Systems","profile_ids":["WATER","ELECT","INSTALL"],"verified_product_approval":false,"standard_ids":["PUMP","PUMPINT","MOTORGEMS","DRINK","PLUMBSTD"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Check submersible motor GEMS exclusions; do not demand registration solely because a motor is present. Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class.","installation_or_project":"Bore construction/licence, water rights, cable/pressure design and backflow separation.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["POTABLE","PLUMB","WATERMARK","WELS","WATER","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","CLASSES","STD-PUMPINT","GEMSMOTOR"]},{"id":"RRE18-C17-S03","name":"Solar Irrigation & Agricultural Water Systems","category_id":"RRE18-C17","category_name":"Renewable Water, Pumping & Agricultural Systems","profile_ids":["WATER","PV","INSTALL","SMART"],"verified_product_approval":false,"standard_ids":["PUMP","MOTORGEMS","FLOW","PLUMBSTD","ICT"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class. Water-meter assessment follows extraction licence and any trade use.","installation_or_project":"Irrigation allocation, non-urban metering, backflow and chemical-injection hazards.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","Licensed electrical contractor; local electrical regulator; inspector where required.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator."],"source_ids":["POTABLE","PLUMB","WATERMARK","WELS","WATER","PV","PV61215","CEC","WIRING","INSTALL","CYBER","PRIVACY","CLASSES","EESSSELECT","GEMSMOTOR","METER","STD-ICT"]},{"id":"RRE18-C17-S04","name":"Livestock Water Supply Systems","category_id":"RRE18-C17","category_name":"Renewable Water, Pumping & Agricultural Systems","profile_ids":["WATER","ELECT","INSTALL"],"verified_product_approval":false,"standard_ids":["PUMP","TANK","DRINK","PLUMBSTD"],"before_supply":"Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class. Document potable versus stock-water use and pressure/UV durability; mains pump classification assessed independently.","installation_or_project":"Stock-access, water source rights, backflow, safe tank and pump installation.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["POTABLE","PLUMB","WATERMARK","WELS","WATER","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","CLASSES","STD-TANK"]},{"id":"RRE18-C17-S05","name":"Water Storage & Pressure Management Equipment","category_id":"RRE18-C17","category_name":"Renewable Water, Pumping & Agricultural Systems","profile_ids":["WATER","PRESS","STRUCT"],"verified_product_approval":false,"standard_ids":["TANK","PRESSCLASS","VESSEL","DRINK","PLUMBSTD"],"before_supply":"Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class. Distinguish atmospheric tank from pressure vessel; obtain pressure design verification/registration where thresholds apply.","installation_or_project":"Foundation/flood/wind design, pressure relief and drinking-water hygiene.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer."],"source_ids":["POTABLE","PLUMB","WATERMARK","WELS","WATER","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","STRUCT","STANDARD","STD-TANK"]},{"id":"RRE18-C17-S06","name":"Water Treatment & Purification Systems","category_id":"RRE18-C17","category_name":"Renewable Water, Pumping & Agricultural Systems","profile_ids":["WATER","ELECT","PRESS"],"verified_product_approval":false,"standard_ids":["FILTER","DRINK","PLUMBSTD","WELSSTD","TESTSAFE"],"before_supply":"Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class. Water-treatment claims need actual contaminant-removal/test evidence; classify UV/electric auxiliaries separately.","installation_or_project":"WaterMark-compatible plumbing, maintenance, waste/brine discharge and local water/public-health rules.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector."],"source_ids":["POTABLE","PLUMB","WATERMARK","WELS","WATER","EESS","NSW","CERT","EESSSELECT","EESSDOC","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","STD-FILTER","STD-TESTSAFE"]},{"id":"RRE18-C17-S07","name":"Water Level, Flow & Quality Monitoring","category_id":"RRE18-C17","category_name":"Renewable Water, Pumping & Agricultural Systems","profile_ids":["WATER","METER","SMART","EMC"],"verified_product_approval":false,"standard_ids":["FLOW","METERSTD","TESTSAFE","ICT","DRINK"],"before_supply":"Assess ACMA radio/EMC, electrical supply safety and the manufactured-date smart-device security rule. Retain the required security statement of compliance where in scope, firmware/update policy and privacy/data-handling information. Check the current WaterMark schedule for each wetted component and finished appliance. Obtain the applicable certificate before supply if scheduled, potable-contact evidence for drinking-water claims, and WELS registration only for a covered product class. Obtain required flowmeter pattern/verification or licence acceptance, plus calibration and wetted-material evidence.","installation_or_project":"Water extraction licence, measurement purpose and maintenance/verification intervals.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","National Measurement Institute; authorised verifier; metering coordinator/network when relevant.","Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["POTABLE","PLUMB","WATERMARK","WELS","WATER","METER","NER","CYBER","PRIVACY","ACMA","ACMA2","STD-TESTSAFE","STD-ICT"]},{"id":"RRE18-C17-S08","name":"Renewable-Powered Agricultural Infrastructure","category_id":"RRE18-C17","category_name":"Renewable Water, Pumping & Agricultural Systems","profile_ids":["WATER","PRESS","ELECT","INSTALL"],"verified_product_approval":false,"standard_ids":["MACHINE","MACHINEELEC","PUMP","MOTORGEMS","ARRAY","ICT"],"before_supply":"Prepare a plant risk assessment, guarding/interlock evidence, electrical safety tests and safe operating/maintenance instructions. Determine pressure, explosive-atmosphere and environmental triggers before marketing the complete plant. Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Assess each included water/PV/automation component by its own supply pathway.","installation_or_project":"Farm electrical, water, planning and machinery integration; renewable power creates no general product exemption.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["POTABLE","PLUMB","WATERMARK","WELS","WATER","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSSELECT","EESSDOC","WIRING","INSTALL","WHS","STD-MACHINEELEC","CLASSES","GEMSMOTOR","STD-ARRAY","STD-ICT"]}]},{"id":"RRE18-C18","name":"Installation Tools, Testing, Spares & Consumables","subcategories":[{"id":"RRE18-C18-S01","name":"Solar & Electrical Installation Tools","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["TOOLS","ELECT"],"verified_product_approval":false,"standard_ids":["TOOLSSTD","MAINSPLUG","ESSENTIAL"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Hand tools without electrical function need suitability/material/load information rather than invented electrical certification.","installation_or_project":"Use insulated-rated tools appropriate to task and workplace risk controls.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS as required; scoped laboratory/calibration provider; competent employer/installer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["LAB","NATA","CLASSES","STANDARD","EESSSELECT","EESS","NSW","CERT","EESSDOC","STD-TOOLSSTD"]},{"id":"RRE18-C18-S02","name":"Electrical Testing & Inspection Equipment","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["TOOLS","ELECT","EMC"],"verified_product_approval":false,"standard_ids":["TESTSAFE","TESTCIRCUIT","INSTALLTEST","VERIFY"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Provide measurement-category/voltage safety evidence and traceable calibration by test function.","installation_or_project":"Competent test method, lead/probe ratings and installation verification records.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS as required; scoped laboratory/calibration provider; competent employer/installer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory."],"source_ids":["LAB","NATA","CLASSES","STANDARD","EESSSELECT","EESS","NSW","CERT","EESSDOC","ACMA","ACMA2","STD-TESTSAFE","STD-TESTCIRCUIT","STD-INSTALLTEST","STD-VERIFY"]},{"id":"RRE18-C18-S03","name":"Battery Testing & Diagnostic Equipment","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["TOOLS","ELECT","EMC","DG"],"verified_product_approval":false,"standard_ids":["TESTSAFE","TESTCIRCUIT","LIIND","LIPORT","UN38"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Verify tester fault-current/charging safety, battery-chemistry compatibility and calibrated diagnostics.","installation_or_project":"Battery testing requires fault/fire precautions and shipping rules if batteries are moved.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS as required; scoped laboratory/calibration provider; competent employer/installer.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","ACMA; responsible supplier; appropriately scoped testing laboratory.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist."],"source_ids":["LAB","NATA","CLASSES","STANDARD","EESSSELECT","EESS","NSW","CERT","EESSDOC","ACMA","ACMA2","ADG","UN","SEA","AIR","STD-TESTSAFE","STD-TESTCIRCUIT","STD-LIIND","STD-LIPORT"]},{"id":"RRE18-C18-S04","name":"Commissioning & Maintenance Equipment","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["TOOLS","PRESS","ELECT"],"verified_product_approval":false,"standard_ids":["TESTSAFE","VERIFY","INUSE","INSTALLTEST","CONSTRUCT"],"before_supply":"Determine voltage, intended household/industrial use and the exact regulated equipment class. Obtain the class-required certificate or compliance file, register the responsible supplier/product where required, then apply RCM only after electrical and ACMA obligations are met. Identify each instrument or maintenance machine’s scope; provide calibrated functional and safety evidence.","installation_or_project":"Commissioning procedures, competent operators, site electrical/pressure isolation and records.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Electrical regulator/RECS as required; scoped laboratory/calibration provider; competent employer/installer.","State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier."],"source_ids":["LAB","NATA","CLASSES","STANDARD","EESSSELECT","PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT","EESS","NSW","CERT","EESSDOC","STD-TESTSAFE","STD-VERIFY","STD-INUSE","STD-INSTALLTEST","INSTALL"]},{"id":"RRE18-C18-S05","name":"Personal Protective Equipment (PPE)","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["PPE"],"verified_product_approval":false,"standard_ids":["GLOVE","EYE","HEADHAND","FALL","RESP","HEARING"],"before_supply":"Select PPE by actual hazard, voltage/class, impact, chemical/thermal exposure and compatibility. Obtain model-specific conformity tests, traceability, storage/inspection limits and user instructions; there is no single government renewable-energy PPE certificate.","installation_or_project":"Employer/installer chooses and maintains PPE through WHS/OHS risk assessment; arc-flash PPE needs task-specific arc-energy assessment and appropriate tested performance.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["WHS/OHS regulator; scoped PPE certification/testing provider; competent safety professional."],"source_ids":["STANDARD","LAB","STD-GLOVE","STD-EYE","STD-HEADHAND","STD-FALL","STD-RESP","STD-HEARING"]},{"id":"RRE18-C18-S06","name":"Safety Labels, Signs & Asset Identification","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["PPE","INSTALL"],"verified_product_approval":false,"standard_ids":["SIGN"],"before_supply":"Supply hazard-appropriate, durable signs and equipment labels with accurate ratings/model identity; electrical system labels must meet the relevant installation standard.","installation_or_project":"Installer determines required wording/locations; generic sticker pack does not prove system compliance.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["WHS/OHS regulator; scoped PPE certification/testing provider; competent safety professional.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["STANDARD","LAB","WIRING","INSTALL"]},{"id":"RRE18-C18-S07","name":"Installation Fasteners, Consumables & Supplies","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["STRUCT","PACK"],"verified_product_approval":false,"standard_ids":["ANCHOR","GALV","STRUCTLOAD","ESSENTIAL"],"before_supply":"Supply fastener/adhesive/sealant ratings, material/corrosion compatibility, installation instructions and SDS where hazardous chemicals are supplied. No blanket electrical certificate applies to ordinary unpowered consumables.","installation_or_project":"Structural fastener design, fire penetrations, chemical handling and actual substrate compatibility.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","DAFF/Biosecurity; ABF/customs broker; transport regulator/carrier."],"source_ids":["STRUCT","STANDARD","WOOD","ADG","STD-ANCHOR","STD-GALV","EESSSELECT"]},{"id":"RRE18-C18-S08","name":"Replacement Parts & Maintenance Spares","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["ELECT","CABLE","SWITCH"],"verified_product_approval":false,"standard_ids":["CLASS","ESSENTIAL","LIIND","PCESAFE","MAINSPLUG"],"before_supply":"Identify host model/revision and prove interchangeability; safety-critical changes require assessment of the original certified design. Standalone regulated spare components need their own required approval.","installation_or_project":"Service by competent/licensed personnel; preserve ratings, firmware, protective functions and certification scope.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.","Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer."],"source_ids":["EESS","NSW","CERT","EESSSELECT","EESSDOC","CABLE","CONNECT","BOX","CLASSES","CABLESIZE","HV","STANDARD","STD-CLASS","STD-LIIND","STD-PCESAFE"]},{"id":"RRE18-C18-S09","name":"Transport Packaging & Protective Materials","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["PACK","DG"],"verified_product_approval":false,"standard_ids":["WOOD","ADGCODE","UN38"],"before_supply":"Use BICON-compliant packaging and assess road/rail, sea and air dangerous-goods requirements for actual contents. Keep treatment marks, packing declaration and DG documents; UN 38.3 alone is not a shipping authorisation.","installation_or_project":"Carrier/mode acceptance, segregation, battery state/packaging and damaged-battery restrictions.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["DAFF/Biosecurity; ABF/customs broker; transport regulator/carrier.","Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist."],"source_ids":["WOOD","ADG","UN","SEA","AIR"]},{"id":"RRE18-C18-S10","name":"Technical Documentation & Identification Products","category_id":"RRE18-C18","category_name":"Installation Tools, Testing, Spares & Consumables","profile_ids":["ACL","INSTALL"],"verified_product_approval":false,"standard_ids":["SIGN","CLASS"],"before_supply":"Provide English model-specific specifications, labels, manufacturer/importer contact, safe-install/use/service instructions and applicable declarations/certificate identifiers. Translations must preserve technical meaning and limitations.","installation_or_project":"Maintain revision control, installation/commissioning records, evidence retention and traceability across supplier and project engineer.","shared_gate_ids":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10"],"classification":"Condition-based supplier pathway; category is not an approval","required_evidence":["Exact model/configuration and intended-use statement","Classification and accepted-edition decision","Applicable safety/type reports and certificate identifiers","Mandatory registrations/listing IDs and expiry where triggered","Australian label/declaration, installation/service instructions and traceability","Transport/material/import documents where triggered"],"responsible_routes":["ACCC and state/territory consumer regulators.","Licensed electrical contractor; local electrical regulator; inspector where required."],"source_ids":["ACL","ACTACL","WARRANTY","WIRING","INSTALL","STANDARD","EESSDOC","CLASSES","STD-CLASS"]}]}],"profiles":{"ACL":{"id":"ACL","title":"Supply, claims and consumer rights","trigger":"Advertising or supplying goods/services to Australian customers; guarantee provisions depend on consumer and transaction scope.","law_or_scheme":"Competition and Consumer Act 2010, Schedule 2 (Australian Consumer Law); corresponding state/territory application laws.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"ACCC and state/territory consumer regulators.","supplier_evidence":"Accurate specifications and claims; Australian contact/remedy route; compliant warranty wording; spare-parts and repair arrangements; traceable model/batch.","source_ids":["ACL","ACTACL","WARRANTY"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"SAFE":{"id":"SAFE","title":"Consumer safety, recalls and small batteries","trigger":"Consumer goods; additional rules where button/coin batteries are supplied or incorporated.","law_or_scheme":"ACL mandatory product standards, bans, recalls and incident reporting.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"ACCC Product Safety; electrical regulators for electrical incidents.","supplier_evidence":"Search applicable mandatory standards and recalls; retain test evidence, warnings and incident process. Qualifying serious incidents and consumer recalls have two-day notification duties.","source_ids":["BUTTON","RECALL"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"ELECT":{"id":"ELECT","title":"Electrical supply safety and RCM","trigger":"Classify equipment by intended use, supply voltage and current jurisdiction; assess accessories separately.","law_or_scheme":"State/territory electrical safety law; EESS where applicable; NSW declared-article pathway where applicable.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"State electrical regulator; recognised EESS RECS or regulator certification; Australian/NZ responsible supplier.","supplier_evidence":"Retain classification/edition decision; responsible supplier registration; Level 1 compliance evidence, Level 2 product registration/compliance folder, Level 3 product registration and recognised certificate as applicable. NSW and WA local approval routes also require assessment. RCM is a compliance mark, not a certificate.","source_ids":["EESS","NSW","CERT","EESSSELECT","EESSDOC"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"EMC":{"id":"EMC","title":"Electronic and radio equipment","trigger":"Electrical/electronic equipment, radios or telecommunications interfaces within ACMA scope.","law_or_scheme":"Radiocommunications Act 1992 and applicable labelling/equipment rules; Telecommunications Act 1997 where relevant.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"ACMA; responsible supplier; appropriately scoped testing laboratory.","supplier_evidence":"Australian compliance records, declarations, test evidence and labels; spectrum/frequency suitability; assess integrated Wi-Fi, Bluetooth, cellular and other radios.","source_ids":["ACMA","ACMA2"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"INSTALL":{"id":"INSTALL","title":"Electrical installation","trigger":"Product forms part of a fixed or connectable electrical installation.","law_or_scheme":"Local electrical safety/licensing laws and adopted installation requirements.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Licensed electrical contractor; local electrical regulator; inspector where required.","supplier_evidence":"Installation manuals, compatibility limits, ratings, commissioning criteria; project installation certificate and inspection record. These are installation obligations, not a product approval certificate.","source_ids":["WIRING","INSTALL"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"GRID":{"id":"GRID","title":"Network connection and electricity-market participation","trigger":"Connection to a distribution/transmission network, export, microgrid supply or market participation.","law_or_scheme":"Network connection conditions; applicable electricity laws; National Electricity Rules in the NEM; separate WA/NT arrangements.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Relevant DNSP/TNSP; AEMO and electricity-market regulator as applicable.","supplier_evidence":"Connection permission, export/control settings, protection studies and accepted models; generator/integrated-resource registration or documented exemption if required.","source_ids":["GRID","NER","INV"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"PV":{"id":"PV","title":"PV modules and systems","trigger":"A photovoltaic module or assembly used in a PV installation or scheme-eligible system.","law_or_scheme":"CEC product-listing requirements where scheme/network rules require them; applicable installation law.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"IEC/IECEE certification route accepted by CEC; CEC listing; CER scheme administration.","supplier_evidence":"Model-specific certificates, reports and labels; confirm active listing and expiry. Existing accepted IEC 61730:2016 listings can continue to their expiry; do not automatically reject them.","source_ids":["PV","PV61215","CEC"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"BAT":{"id":"BAT","title":"Stationary battery storage","trigger":"Stationary battery equipment; distinguish complete system, module/cell, chemistry and size.","law_or_scheme":"CEC battery-listing rules when required; electrical safety, installation and local fire/planning conditions.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Electrical regulator; scoped laboratory/certifier; CEC and CER when relevant; planning/fire authority for site.","supplier_evidence":"System and component safety evidence, compatible configurations, BMS protections, installation constraints, capacity and current listing. In 2026 CEC accepts old guide or TS5398; new applications from 1 January 2027 require TS5398; old-guide listings expire by 31 December 2027.","source_ids":["BAT","CELL","CELL2","INSTALL"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"DG":{"id":"DG","title":"Dangerous goods transport","trigger":"Battery chemistry, hydrogen, fuels, refrigerants or other cargo classified as dangerous goods.","law_or_scheme":"State/territory road/rail dangerous-goods legislation; ADG Code; sea IMDG/Marine Order 41; air ICAO/CASA rules.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Local dangerous-goods transport regulator; AMSA; CASA; carrier and trained DG specialist.","supplier_evidence":"Correct UN entry, test summary where required, transport classification, packaging, marks, quantities and documents for each transport mode. An SDS is not a substitute for battery testing.","source_ids":["ADG","UN","SEA","AIR"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"PCE":{"id":"PCE","title":"Inverters and converters","trigger":"Grid, PV, battery or general power-conversion equipment; determine ports and operating modes.","law_or_scheme":"Electrical safety; CEC listing where required; network connection rules.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Electrical regulator/RECS; accepted laboratory; CEC; network.","supplier_evidence":"Full model/firmware identification, port diagram, safety and grid tests, allowed source/load combinations, regional settings and active listing. Battery-only products need the appropriate converter safety route rather than automatic PV-only standards.","source_ids":["INV","PCE"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"STRUCT":{"id":"STRUCT","title":"Structures, building interfaces and mounting","trigger":"Permanent supports, roofs, foundations, carports, BIPV or machinery supporting equipment.","law_or_scheme":"Local planning/building laws; adopted NCC edition and jurisdictional variations.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Building surveyor/certifier, local council/planning authority; appropriately qualified/registered structural engineer.","supplier_evidence":"Site-specific load calculations, wind region, terrain, corrosion category, fixing/roof compatibility, foundation design, waterproofing and building fire evidence. A generic wind-rating brochure cannot approve a site.","source_ids":["STRUCT","STANDARD"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"WIND":{"id":"WIND","title":"Wind turbine design","trigger":"Small, commercial or utility turbine; offshore systems add marine licensing and design assessment.","law_or_scheme":"Electrical and machinery safety; planning/noise/environment approvals; network rules.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Scoped wind certification body/IECRE route to be confirmed; engineer; planning/environment authority; network.","supplier_evidence":"Turbine certification scope, wind class/site suitability, tower/foundation design, loads, noise evidence and electrical performance. Certification does not grant development permission.","source_ids":["WIND","ENV"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"OFFSHORE":{"id":"OFFSHORE","title":"Offshore renewable infrastructure","trigger":"Infrastructure in Commonwealth waters or state coastal jurisdiction.","law_or_scheme":"Offshore Electricity Infrastructure Act 2021 and regulations in Commonwealth waters; state marine/planning laws otherwise.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Offshore Infrastructure Registrar; Offshore Infrastructure Regulator/NOPSEMA; relevant environment and maritime authorities.","supplier_evidence":"Correct licence category, management-plan approvals, financial security and other required permits; site design and marine safety evidence.","source_ids":["OFFSHORE"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"HYDRO":{"id":"HYDRO","title":"Hydro generation and pumped storage","trigger":"Hydro equipment or project taking/interfering with water or involving dams.","law_or_scheme":"Water, dam safety, environmental, planning, electrical and market requirements by jurisdiction.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Water and dam-safety regulator; environmental/planning authority; network; qualified engineer.","supplier_evidence":"Hydraulic/site study, turbine/generator ratings, dam assessment, water entitlements and approvals; accepted electrical protection and connection design.","source_ids":["HYDRO","DAM","WATER","ENV"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"H2":{"id":"H2","title":"Hydrogen production, storage and distribution","trigger":"Hydrogen equipment, gas devices, refuelling or operating plant.","law_or_scheme":"Relevant gas/petroleum safety, dangerous-goods, WHS/pressure and environmental laws; Queensland Hydrogen Safety Code where applicable.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"State gas/petroleum safety regulator; WHS regulator; pressure/gas engineer; recognised hazardous-area certification route.","supplier_evidence":"Pressure/material compatibility, leak detection, ventilation, hazardous-area classification, safety assessment, emergency isolation and accepted installation/certification route. Do not assume natural-gas equipment is hydrogen-compatible.","source_ids":["H2","PRESSURE","GASFUELCELL","IECEX"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"FUEL":{"id":"FUEL","title":"Fuel cell equipment","trigger":"Fuel cell module or stationary power system.","law_or_scheme":"Electrical, gas, pressure, WHS and installation law as applicable.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Electrical/gas regulator; scoped fuel-cell certifier/laboratory; qualified system engineer.","supplier_evidence":"Module/system boundaries, fuel requirements, gas and electrical safety evidence, performance limits and protective systems.","source_ids":["FUEL"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"PRESS":{"id":"PRESS","title":"Pressure plant and workplace machinery","trigger":"Pressure vessels/boilers, hazardous plant, workplace machinery and safety systems.","law_or_scheme":"Local WHS/OHS legislation; plant design and item registration where prescribed; hazardous chemicals/major hazard facilities if triggered.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"State WHS/OHS regulator; independent design verifier; competent/registered engineers; inspector.","supplier_evidence":"Hazard level, design registration and item registration if required; safe-design dossier, guarding/interlocks, inspection/maintenance instructions and hazardous chemicals data. Registration thresholds vary by jurisdiction.","source_ids":["PRESSURE","PLANT","MACHINE","DESIGNPLANT","ITEMPLANT"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"BIO":{"id":"BIO","title":"Biomass, biogas and waste conversion","trigger":"Combustible biomass, digesters, biogas appliances, biofuel processing or waste-to-energy facilities.","law_or_scheme":"Gas/plant safety; pollution, waste, planning and dangerous-goods permits. Queensland biogas guidance and Victoria waste permissions are examples.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"State gas safety regulator; EPA/environment authority; WHS regulator; engineer; planning authority.","supplier_evidence":"Feedstock compatibility, emissions/odour study, combustion/gas-train safety, waste streams, pressure/chemical assessment and site permits. Fuel-production quality requirements are separate from equipment certification.","source_ids":["BIO","WASTE"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"GEO":{"id":"GEO","title":"Geothermal resources and drilling","trigger":"Geothermal exploration/production or subsurface works; shallow ground-source heat exchange needs separate classification.","law_or_scheme":"Resource authority where required; drilling, groundwater, environment and local development laws.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"State resources/water/environment authority; licensed drilling contractor; project engineer.","supplier_evidence":"Resource and bore permissions, subsurface risk assessment, groundwater protection and pressure/corrosion data. QLD resource permit guidance does not establish a national exemption for shallow systems.","source_ids":["GEO","WATER","ENV"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"EV":{"id":"EV","title":"Electric vehicle supply equipment","trigger":"AC/DC charging equipment, cables and accessories; distinguish vehicle interface, charging mode and bidirectionality.","law_or_scheme":"Electrical/ACMA supply rules; installation and building requirements; scheme specifications only when participating.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Electrical regulator/RECS when required; scoped laboratory; installer; network and local authority.","supplier_evidence":"Electrical/interface test dossier, connector and RCD/DC leakage protections, load management, Australian ratings and installation instructions. Published ESV new EVSE Level 3 definition starts 12 February 2028; assess present class separately.","source_ids":["EV","CLASSES"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"TX":{"id":"TX","title":"Transformers and high-voltage distribution","trigger":"Power/distribution transformer or HV installation.","law_or_scheme":"Electrical installation/network law; GEMS determination if transformer within regulated class.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Network; electrical regulator; HV engineer; GEMS Regulator for regulated transformers.","supplier_evidence":"Type/routine test evidence, losses/efficiency registration when required, insulation ratings, fault duty, earthing and site acceptance.","source_ids":["HV","TX","GEMSTX"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"CABLE":{"id":"CABLE","title":"Cables, connectors and enclosures","trigger":"AC/DC cable, photovoltaic connector, module junction box or electrical enclosure.","law_or_scheme":"Electrical equipment classification and installation requirements.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Electrical regulator/RECS when class requires; scoped laboratory; electrical designer.","supplier_evidence":"Exact conductor/insulation ratings, UV/weather data, connector compatibility, temperature/fire and ingress evidence. Module junction-box standard does not automatically apply to all combiner boxes.","source_ids":["CABLE","CONNECT","BOX","CLASSES","CABLESIZE"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"SWITCH":{"id":"SWITCH","title":"Switchgear, protection and assemblies","trigger":"Breakers, isolators, fuses, switchboards, protection relays and emergency shutdown.","law_or_scheme":"Electrical product classification, installation and network safety obligations.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Electrical regulator; scoped laboratory/assembly verifier; network; competent engineer.","supplier_evidence":"DC/AC voltage and interruption duty, polarity, fault rating, temperature rise, assembly verification and protection settings; determine class and adopted edition. Recent 61439 catalogue results have inconsistent year metadata: edition unresolved.","source_ids":["CLASSES","HV","STANDARD"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"SMART":{"id":"SMART","title":"Connected products and software","trigger":"In-scope consumer connected devices; products collecting personal information; industrial controls require their own security assessment.","law_or_scheme":"Cyber Security Act 2024 and Security Standards for Smart Devices Rules 2025; Privacy Act 1988 where organisation/data scope applies.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Home Affairs; OAIC where applicable; ACMA for radio; scoped security evaluator.","supplier_evidence":"For applicable devices made on/after 4 March 2026: compliant password design, vulnerability reporting, security-update period information and statement of compliance. Map remote access, personal data and overseas disclosures.","source_ids":["CYBER","PRIVACY"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"METER":{"id":"METER","title":"Trade and settlement metering","trigger":"Electricity/water/gas meter used to bill for consumption; monitoring-only sensors need separate assessment.","law_or_scheme":"National Measurement Act 1960 and associated metrology controls; applicable electricity-market metering rules.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"National Measurement Institute; authorised verifier; metering coordinator/network when relevant.","supplier_evidence":"Pattern approval and verification where required; meter accuracy, identification and tamper records. Monitoring accuracy alone does not qualify a meter for billing.","source_ids":["METER","NER"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"DRONE":{"id":"DRONE","title":"Drones and autonomous equipment","trigger":"Inspection drones, aircraft operation or workplace robotics.","law_or_scheme":"Civil Aviation Act/CASR Part 101 operating rules; WHS machinery safety; ACMA radio rules.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"CASA; WHS regulator; ACMA; competent robot safety assessor.","supplier_evidence":"Drone registration and operator/pilot credentials or exclusions appropriate to operation; safe operating envelope, radio evidence and machinery risk assessment. RePL/ReOC not universally required for every drone activity.","source_ids":["DRONE","MACHINE"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"OFFGRID":{"id":"OFFGRID","title":"Stand-alone and hybrid power","trigger":"Off-grid system, generator integration, movable installation or remote/mining power.","law_or_scheme":"Electrical safety and workplace/site laws; mining and network-supply licensing where triggered.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Licensed installer; electrical regulator; competent engineer; mine/site authority where applicable.","supplier_evidence":"Complete system diagrams, earthing/MEN and switching design, anti-backfeed controls, compatible batteries, ventilation and transportable-system instructions. Confirm individual standard scopes and adopted editions.","source_ids":["INSTALL","STANDARD"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"HEAT":{"id":"HEAT","title":"Hot water, heat pumps and refrigeration","trigger":"Thermal plant, hot water, HVAC, refrigeration or regulated electrical appliance.","law_or_scheme":"Electrical supply/installation; GEMS determination if in scope; WaterMark/plumbing; refrigerant import/handling; CER STC scheme where relevant.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Electrical regulator; GEMS Regulator; WaterMark certifier; CER; DCCEEW/ARC; plumber and refrigeration technician.","supplier_evidence":"Correct product class, safety reports, GEMS/WaterMark/CER status where required, refrigerant identity/charge/import conditions and licensed installation. Do not assume every heat pump or water heater is GEMS regulated.","source_ids":["SWH","REFRIG","REFRIG2","ARC","GEMS","WATERMARK","HPDRAFT","GEMSAC","GEMSCOLD","WMBC"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"EFF":{"id":"EFF","title":"Energy efficiency registration","trigger":"Product appears within a current GEMS regulated class and determination scope.","law_or_scheme":"Greenhouse and Energy Minimum Standards Act 2012 and current product determination.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"GEMS Regulator / Energy Rating.","supplier_evidence":"Model registration, performance tests and required online/physical labels; preserve scope/exemptions and effective dates. A policy announcement or consultation is not an enacted requirement.","source_ids":["GEMS","GEMSTX"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"WATER":{"id":"WATER","title":"Water supply, pumps and treatment","trigger":"Pumps, irrigation, potable-water contact, plumbing, pressure storage or treatment.","law_or_scheme":"Water entitlements; plumbing/building rules; WaterMark scheduled products; WELS for regulated product classes; pressure/WHS as triggered.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Water regulator; local/plumbing authority; WaterMark certifier; WELS Regulator for covered products; scoped laboratory.","supplier_evidence":"Potable-water compatibility, correct WaterMark schedule entry, hygiene/backflow evidence, extraction rights, pump safety and pressure data; WELS only where within one of its regulated classes.","source_ids":["POTABLE","PLUMB","WATERMARK","WELS","WATER"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"TOOLS":{"id":"TOOLS","title":"Tools, test instruments and worksite equipment","trigger":"Hand/powered tools, test instruments or maintenance equipment.","law_or_scheme":"Electrical safety where equipment is in scope; WHS safe selection, use and maintenance.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Electrical regulator/RECS as required; scoped laboratory/calibration provider; competent employer/installer.","supplier_evidence":"Tool safety reports, charger evidence, CAT/voltage ratings, traceable calibration and operating instructions. In-service test-and-tag is not original product certification.","source_ids":["LAB","NATA","CLASSES","STANDARD","EESSSELECT"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"PPE":{"id":"PPE","title":"Personal protective equipment and signage","trigger":"PPE selected for a defined electrical, construction, chemical or fall hazard.","law_or_scheme":"Local WHS/OHS duties and any applicable mandatory consumer product standard.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"WHS/OHS regulator; scoped PPE certification/testing provider; competent safety professional.","supplier_evidence":"Hazard/class-specific test reports, conformity evidence, batch/model traceability, instructions, expiry/storage and inspection requirements; employer selection and fit assessment remain separate.","source_ids":["STANDARD","LAB"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"PACK":{"id":"PACK","title":"Packaging and imported goods","trigger":"Imported equipment, timber/bamboo packaging or dangerous-goods shipment.","law_or_scheme":"Biosecurity Act 2015/BICON conditions; customs and dangerous-goods law as applicable.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"DAFF/Biosecurity; ABF/customs broker; transport regulator/carrier.","supplier_evidence":"Packing declaration, timber treatment/marks, cargo cleanliness, classification and shipment documentation. Packaging approval is separate from product approval.","source_ids":["WOOD","ADG"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"ENV":{"id":"ENV","title":"Project planning, environment and fire","trigger":"Physical project affecting land, water, habitat, amenity or hazardous storage.","law_or_scheme":"Local planning/building and state environment/fire/heritage laws; EPBC Act 1999 referral/approval where triggered.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"Council/state planning body; environment regulator; DCCEEW Commonwealth assessment; fire authority/building certifier.","supplier_evidence":"Site permissions, environmental impact/heritage checks, fire access and emergency response plan; assess project triggers before construction.","source_ids":["ENV","STANDARD"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"WHS":{"id":"WHS","title":"Safe design and supply for workplace use","trigger":"Plant, substances or structures used or reasonably expected to be used at work.","law_or_scheme":"Applicable jurisdiction WHS/OHS law; model laws are guidance until enacted by the jurisdiction.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"State/territory WHS/OHS regulator; competent designer/manufacturer/importer/supplier.","supplier_evidence":"Evidence of safe design and testing; risk information for installation, use, maintenance and disposal; consultation and plant registration where required.","source_ids":["WHS","SAFELAWS"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."},"FUELLAW":{"id":"FUELLAW","title":"Biofuel quality and fuel supply","trigger":"Finished fuel is supplied, including qualifying biodiesel/ethanol products; equipment supply alone has a different scope.","law_or_scheme":"Fuel Quality Standards Act 2000 and applicable fuel determinations/information standards.","standards":"See the subcategory’s explicit standard records and applicable profile source documents.","authority_or_certification_route":"DCCEEW fuel-quality regulator; scoped chemical test laboratory.","supplier_evidence":"Fuel specification/test evidence, required fuel information, and section 13 approval if supplying a permitted variation from regulated quality.","source_ids":["FUELLAW"],"verification_status":"Primary-source regulatory pathway; apply the row-specific selection conditions and actual product facts.","mandatory_status":"Apply only when the stated law, equipment class, scheme, network or installation trigger is met."}},"jurisdictions":[{"name":"Queensland","electrical_law":"Electrical Safety Act 2002; Electrical Safety Regulation 2026 (from 1 September 2026)","electrical_entry_route":"EESS responsible-supplier/product routes; Electrical Safety Queensland / Electrical Safety Office.","workplace_plant_law":"Work Health and Safety Act 2011 and Regulation 2011; plant design/item registration with WorkSafe Queensland.","gas_entry_route":"Petroleum and Gas (Production and Safety) Act 2004 / Gas Supply Act 2003; Resources Safety & Health Queensland. Hydrogen Safety Code 2025 as applicable.","building_plumbing_code":"NCC 2022 with Queensland changes remains the relevant baseline; NCC 2025 adoption deferred to 1 May 2027.","source_ids":["QLD","NCCSTATE1","SAFELAWS","STATEEX6","PROJECT1"],"project_law_selection":"Select local planning, environment, water/resource, dangerous-goods, fire and mining statutes by the actual site/activity. These are project permissions, not factory product certificates.","principal_project_laws":"Planning Act 2016; Environmental Protection Act 1994; Water Act 2000; Water Supply (Safety and Reliability) Act 2008 for regulated dams","project_permission_trigger":"Planning/environment/resource consent for project construction, waste/emissions, water extraction and regulated dams."},{"name":"New South Wales","electrical_law":"Gas and Electricity (Consumer Safety) Act 2017; applicable current regulation and declared electrical articles","electrical_entry_route":"NSW approved electrical articles/register and state approval requirements; Building Commission NSW / Fair Trading functions.","workplace_plant_law":"Work Health and Safety Act 2011; Work Health and Safety Regulation 2025; SafeWork NSW.","gas_entry_route":"State gas appliance/installation route under Gas and Electricity (Consumer Safety) Act; gas acceptance and licensed work.","building_plumbing_code":"NCC 2022 Amendment 2 and NSW variations; NCC 2025 adoption from 1 May 2027.","source_ids":["NSW","NCCSTATE2","SAFELAWS","PROJECT2"],"project_law_selection":"Select local planning, environment, water/resource, dangerous-goods, fire and mining statutes by the actual site/activity. These are project permissions, not factory product certificates.","principal_project_laws":"Environmental Planning and Assessment Act 1979; Protection of the Environment Operations Act 1997; Water Management Act 2000; Dams Safety Act 2015","project_permission_trigger":"Planning approval, scheduled pollution activities, water access/work approvals and declared-dam safety."},{"name":"Victoria","electrical_law":"Electricity Safety Act 1998; Electricity Safety (Equipment Safety Scheme) Regulations 2019; installation regulations","electrical_entry_route":"EESS and Energy Safe Victoria equipment/installation routes.","workplace_plant_law":"Occupational Health and Safety Act 2004 and Regulations 2017; WorkSafe Victoria. Victoria uses its OHS law rather than the model WHS Act.","gas_entry_route":"Gas Safety Act 1997; Gas Safety (Gas Installation) Regulations 2018; ESV Type A/Type B/Schedule 9 acceptance as applicable.","building_plumbing_code":"NCC 2025 from 1 May 2026, with Victorian variations and provision-specific transitions.","source_ids":["VIC","NCCSTATE3","SAFELAWS","STATEEX7","PROJECT3"],"project_law_selection":"Select local planning, environment, water/resource, dangerous-goods, fire and mining statutes by the actual site/activity. These are project permissions, not factory product certificates.","principal_project_laws":"Planning and Environment Act 1987; Environment Protection Act 2017 and Regulations 2021; Water Act 1989","project_permission_trigger":"Planning permit, general environmental duty and permissions for scheduled waste/energy activities; water works/access permissions."},{"name":"Western Australia","electrical_law":"Electricity Act 1945; Electricity Regulations 1947 Part X; Electricity (Licensing) Regulations 1991","electrical_entry_route":"Building and Energy prescribed electrical equipment approval, marking and licensed-work route; check WA recognised approvals.","workplace_plant_law":"Work Health and Safety Act 2020 and applicable 2022 regulations (general/mines/petroleum as relevant); WorkSafe WA.","gas_entry_route":"Gas Standards Act 1972; Gas Standards (Gasfitting and Consumer Gas Installations) Regulations 1999; Building and Energy.","building_plumbing_code":"NCC 2025 adoption from 1 May 2026 with WA variations and transitions.","source_ids":["WA","NCCSTATE4","SAFELAWS","STATEEX5","PROJECT4","WAWATER"],"project_law_selection":"Select local planning, environment, water/resource, dangerous-goods, fire and mining statutes by the actual site/activity. These are project permissions, not factory product certificates.","principal_project_laws":"Planning and Development Act 2005; Environmental Protection Act 1986; Rights in Water and Irrigation Act 1914 and Regulations 2000","project_permission_trigger":"Development approval, environmental assessment/clearing/works approval and water abstraction/bore permits as triggered."},{"name":"South Australia","electrical_law":"Energy Products (Safety and Efficiency) Act 2000 for product supply; Electricity Act 1996 and general regulations for installation","electrical_entry_route":"Office of the Technical Regulator: electrical product approval/labels and installation compliance.","workplace_plant_law":"Work Health and Safety Act 2012 and Regulations 2012; SafeWork SA.","gas_entry_route":"Gas Act 1997 and Gas Regulations 2012; OTR product/installation acceptance.","building_plumbing_code":"Building NCC 2025 from 1 May 2027; Plumbing NCC 2025 from 1 May 2026. Do not use one date for both.","source_ids":["SA","NCCSTATE5","SAFELAWS","STATEEX1","PROJECT5","SAWATER"],"project_law_selection":"Select local planning, environment, water/resource, dangerous-goods, fire and mining statutes by the actual site/activity. These are project permissions, not factory product certificates.","principal_project_laws":"Planning, Development and Infrastructure Act 2016; Hydrogen and Renewable Energy Act 2023 and Regulations 2024; Environment Protection Act 1993; Landscape South Australia Act 2019","project_permission_trigger":"Large-scale HRE/BESS activities require the applicable HRE licensing/approval route, including transitioned projects; project type/land/scope determine the pathway. Also assess EPA and water permissions."},{"name":"Tasmania","electrical_law":"Electricity Industry Safety and Administration Act 1997 — operative current consolidation checked; 2022 replacement Act requires commencement verification before use","electrical_entry_route":"CBOS electrical equipment/EESS and installation route under operative legislation; do not treat an as-made Act as commenced.","workplace_plant_law":"Work Health and Safety Act 2012 and Regulations 2022; WorkSafe Tasmania.","gas_entry_route":"Gas Safety Act 2019 and Gas Safety Regulations 2021; CBOS gas standards/acceptance, including Type B and complex biogas installations.","building_plumbing_code":"NCC 2025 from 1 May 2026 with Tasmanian variations and transitions.","source_ids":["TAS","NCCSTATE6","SAFELAWS","STATEEX2","STATEEX3","PROJECT6","TASWATER","TASPLAN","TASGAS"],"project_law_selection":"Select local planning, environment, water/resource, dangerous-goods, fire and mining statutes by the actual site/activity. These are project permissions, not factory product certificates.","principal_project_laws":"Land Use Planning and Approvals Act 1993; Environmental Management and Pollution Control Act 1994; Water Management Act 1999","project_permission_trigger":"Planning permit, environmental licence/permit for activity class, water allocation/work and dam permissions."},{"name":"Australian Capital Territory","electrical_law":"Electricity Safety Act 1971; Electricity Safety Regulation 2004 (current register R7 from 12 December 2023)","electrical_entry_route":"ACT electricity safety regulator and equipment/install rules; determine locally recognised approvals.","workplace_plant_law":"Work Health and Safety Act 2011 and Regulation 2011; WorkSafe ACT.","gas_entry_route":"Gas Safety Act 2000; gas safety regulation; Dangerous Substances Act 2004 where applicable.","building_plumbing_code":"NCC 2025 commenced 1 May 2026, mandatory from 1 May 2027; design/application-specific 2022 transition available subject to ACT conditions.","source_ids":["ACT","NCCSTATE7","SAFELAWS","STATEEX4","PROJECT7","ACTWATER"],"project_law_selection":"Select local planning, environment, water/resource, dangerous-goods, fire and mining statutes by the actual site/activity. These are project permissions, not factory product certificates.","principal_project_laws":"Planning Act 2023 and Planning (General) Regulation 2023; Environment Protection Act 1997; Water Resources Act 2007","project_permission_trigger":"Development approval, environmental authorisation/general duties and water-resource permissions."},{"name":"Northern Territory","electrical_law":"Electrical Safety Act 2022; Electrical Safety Regulations 2024 (commenced 1 July 2024)","electrical_entry_route":"NT WorkSafe electrical safety and equipment/install route, including current amendments.","workplace_plant_law":"Work Health and Safety (National Uniform Legislation) Act 2011 and Regulations 2011; NT WorkSafe.","gas_entry_route":"Dangerous Goods Act 1998; NT WorkSafe fuel-gas/DG route; Transport of Dangerous Goods by Road and Rail (National Uniform Legislation) Act 2010.","building_plumbing_code":"NCC 2025 did not apply from 1 May 2026; use NT-adopted NCC 2022 and variations, and confirm the operative code at application date.","source_ids":["NT","NCCSTATE8","SAFELAWS","STATEEX8","PROJECT8"],"project_law_selection":"Select local planning, environment, water/resource, dangerous-goods, fire and mining statutes by the actual site/activity. These are project permissions, not factory product certificates.","principal_project_laws":"Planning Act 1999 and Planning Regulations 2000; Environment Protection Act 2019; Water Act 1992","project_permission_trigger":"Territory planning/development approval, environmental assessment and water-resource licence/permit."}],"transitions":[{"topic":"PV module CEC applications","date":"2026-05-01","status":"Current","requirement":"New applications require IEC 61730:2023. Existing IEC 61730:2016 listings may remain until their expiry.","source_ids":["PV"]},{"topic":"Grid-interface inverter standard","date":"2025-08-23","status":"Current","requirement":"CEC transition to AS/NZS 4777.2:2020 Amd 2:2024; check model and network settings.","source_ids":["INV"]},{"topic":"Smart-device security","date":"2026-03-04","status":"Current for in-scope products manufactured on/after this date","requirement":"Mandatory consumer smart-device rules; confirm scope and statement of compliance.","source_ids":["CYBER"]},{"topic":"Queensland electrical regulation","date":"2026-09-01","status":"Current","requirement":"Electrical Safety Regulation 2026 replaced Electrical Safety Regulation 2013.","source_ids":["QLD"]},{"topic":"CEC new battery applications","date":"2027-01-01","status":"Future — material to planned February 2027 launch","requirement":"Only SA TS 5398 applications accepted.","source_ids":["BAT"]},{"topic":"CEC old-guide battery listings","date":"2027-12-31","status":"Future","requirement":"Remaining Best Practice Guide listings expire by this date. Check earlier expiry/suspension.","source_ids":["BAT"]},{"topic":"ESV published heat-pump water-heater class definition","date":"2027-02-12","status":"Future — verify adoption in each sales jurisdiction","requirement":"Changed equipment definitions/class requirements are published; present classification remains a separate check.","source_ids":["CLASSES"]},{"topic":"ESV published EVSE and BESS Level 3 definitions","date":"2028-02-12","status":"Future — not a present nationwide Level 3 determination","requirement":"Track declared class changes and verify commencement/adoption by jurisdiction.","source_ids":["CLASSES"]},{"topic":"AS 5216 concrete fastenings","date":"2026-04-10","status":"Published catalogue revision","requirement":"2026 supersedes 2021 in the catalogue. Legally/contractually adopted editions still govern the particular design.","source_ids":["STD-ANCHOR"]},{"topic":"GEMS heat-pump water-heaters","date":"2026-09-07","status":"Exposure draft, not enacted requirement","requirement":"Do not instruct suppliers to obtain GEMS HPWH registration on the basis of this draft. Electrical class, WaterMark and CER/STC rules remain separate.","source_ids":["HPDRAFT"]}],"sources":[{"id":"RRE","title":"Live RRE supplier directory — proposed taxonomy v2.0","url":"https://redrooenergy.com.au/suppliers?lang=en","access_date":"2026-10-13","kind":"primary source"},{"id":"ACL","title":"ACCC — consumer rights and guarantees","url":"https://www.accc.gov.au/business/selling-products-and-services/consumer-rights-and-guarantees","access_date":"2026-10-13","kind":"primary source"},{"id":"ACTACL","title":"Competition and Consumer Act 2010 — latest compilation","url":"https://www.legislation.gov.au/C2004A00109/latest","access_date":"2026-10-13","kind":"primary source"},{"id":"WARRANTY","title":"ACCC — business warranties","url":"https://www.accc.gov.au/business/selling-products-and-services/warranties","access_date":"2026-10-13","kind":"primary source"},{"id":"RECALL","title":"ACCC Product Safety — when an incident must be reported","url":"https://www.productsafety.gov.au/business/make-a-mandatory-report/when-you-must-report-an-incident","access_date":"2026-10-13","kind":"primary source"},{"id":"BUTTON","title":"ACCC — button and coin battery mandatory standards","url":"https://www.productsafety.gov.au/business/search-mandatory-standards/button-and-coin-batteries-mandatory-standards","access_date":"2026-10-13","kind":"primary source"},{"id":"EESS","title":"EESS — steps for compliance","url":"https://www.eess.gov.au/equipment/selling-electrical-equipment-in-australia/steps-for-compliance-with-eess/","access_date":"2026-10-13","kind":"primary source"},{"id":"CLASSES","title":"Energy Safe Victoria — equipment classes and future definitions","url":"https://www.energysafe.vic.gov.au/industry-guidance/electrical/appliances-equipment-and-manufacurers/equipment-classes","access_date":"2026-10-13","kind":"primary source"},{"id":"CERT","title":"EESS — recognised external certification schemes","url":"https://www.eess.gov.au/safety-requirements/certification-general/recognised-external-certification-scheme-recs-certifiers/recs/","access_date":"2026-10-13","kind":"primary source"},{"id":"LAB","title":"EESS — testing and testing laboratories","url":"https://www.eess.gov.au/safety-requirements/testing-and-testing-laboratories/","access_date":"2026-10-13","kind":"primary source"},{"id":"NATA","title":"NATA — accredited organisation search","url":"https://nata.com.au/find-organisation/","access_date":"2026-10-13","kind":"primary source"},{"id":"JAS","title":"JASANZ — product certification","url":"https://www.jasanz.org/product-certification","access_date":"2026-10-13","kind":"primary source"},{"id":"ACMA","title":"ACMA — determine applicable rules","url":"https://www.acma.gov.au/step-1-check-rules-follow","access_date":"2026-10-13","kind":"primary source"},{"id":"ACMA2","title":"ACMA — demonstrate compliance","url":"https://www.acma.gov.au/step-2-show-your-product-complies","access_date":"2026-10-13","kind":"primary source"},{"id":"CEC","title":"CEC — products program","url":"https://cleanenergycouncil.org.au/industry-programs/products-program","access_date":"2026-10-13","kind":"primary source"},{"id":"PV","title":"CEC — module transition to IEC 61730:2023","url":"https://cleanenergycouncil.org.au/industry-programs/products-program/modules/iec61730-2023-standards-change","access_date":"2026-10-13","kind":"primary source"},{"id":"PV61215","title":"CEC — transition to IEC 61215:2021","url":"https://cleanenergycouncil.org.au/industry-programs/products-program/modules/standards-change","access_date":"2026-10-13","kind":"primary source"},{"id":"BAT","title":"CEC — transition to SA TS 5398","url":"https://cleanenergycouncil.org.au/industry-programs/products-program/batteries/battery-specs-change-transitioning-to-ts-5398","access_date":"2026-10-13","kind":"primary source"},{"id":"INV","title":"CEC — inverter standard change","url":"https://cleanenergycouncil.org.au/industry-programs/products-program/inverters/standards-change","access_date":"2026-10-13","kind":"primary source"},{"id":"RET","title":"CER — Renewable Energy Target legislation and schemes","url":"https://cer.gov.au/schemes/renewable-energy-target","access_date":"2026-10-13","kind":"primary source"},{"id":"SWH","title":"CER — solar water heater accreditation","url":"https://cer.gov.au/schemes/renewable-energy-target/small-scale-renewable-energy-scheme/small-scale-renewable-energy-systems/solar-water-heaters/solar-water-heater-accreditation","access_date":"2026-10-13","kind":"primary source"},{"id":"WIRING","title":"Standards Australia — AS/NZS 3000:2018","url":"https://store.standards.org.au/product/as-nzs-3000-2018","access_date":"2026-10-13","kind":"primary source"},{"id":"INSTALL","title":"Standards Australia — AS/NZS 4777.1:2024 changes","url":"https://www.standards.org.au/blog/as-nzs-4777-updates","access_date":"2026-10-13","kind":"primary source"},{"id":"STANDARD","title":"Standards Australia — what is a standard?","url":"https://www.standards.org.au/standards-development/what-is-standard","access_date":"2026-10-13","kind":"primary source"},{"id":"ADG","title":"NTC — Australian Dangerous Goods Code","url":"https://www.ntc.gov.au/codes-and-guidelines/australian-dangerous-goods-code","access_date":"2026-10-13","kind":"primary source"},{"id":"UN","title":"UNECE — Manual of Tests and Criteria revision 8 and amendment 1","url":"https://unece.org/transport/dangerous-goods/rev8-files","access_date":"2026-10-13","kind":"primary source"},{"id":"SEA","title":"AMSA — cargo regulations","url":"https://www.amsa.gov.au/vessels-operators/cargoes-and-dangerous-goods/cargo-regulations","access_date":"2026-10-13","kind":"primary source"},{"id":"AIR","title":"CASA — dangerous goods classes and labels","url":"https://www.casa.gov.au/operations-safety-and-travel/safety-advice/dangerous-goods-and-air-freight/dangerous-goods-classes-and-hazard-labels","access_date":"2026-10-13","kind":"primary source"},{"id":"GRID","title":"AEMO — generator and integrated resource provider registration","url":"https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/participate-in-the-market/registration/register-as-a-generator-in-the-nem","access_date":"2026-10-13","kind":"primary source"},{"id":"NER","title":"AEMC — current energy rules","url":"https://energy-rules.aemc.gov.au/","access_date":"2026-10-13","kind":"primary source"},{"id":"WIND","title":"IEC — wind turbine design, IEC 61400-1:2019 + Amd 1:2025","url":"https://webstore.iec.ch/en/publication/111042","access_date":"2026-10-13","kind":"primary source"},{"id":"HYDRO","title":"IEC — small hydro guidance, IEC 61116:2025","url":"https://webstore.iec.ch/en/publication/76247","access_date":"2026-10-13","kind":"primary source"},{"id":"OFFSHORE","title":"DCCEEW — offshore electricity legislation","url":"https://www.dcceew.gov.au/energy/renewable/offshore-wind/legislation-regulations","access_date":"2026-10-13","kind":"primary source"},{"id":"H2","title":"RSHQ — Hydrogen Safety Code of Practice","url":"https://www.rshq.qld.gov.au/__data/assets/pdf_file/0003/1746453/Hydrogen-Safety-Code-of-Practice.pdf","access_date":"2026-10-13","kind":"primary source"},{"id":"FUEL","title":"IEC — fuel cell module safety, IEC 62282-2-100:2020","url":"https://webstore.iec.ch/en/publication/59780","access_date":"2026-10-13","kind":"primary source"},{"id":"BIO","title":"RSHQ — guideline for biogas operating plant","url":"https://www.rshq.qld.gov.au/__data/assets/pdf_file/0009/1790352/Guideline-for-Operating-Plant-Biogas.pdf","access_date":"2026-10-13","kind":"primary source"},{"id":"WASTE","title":"EPA Victoria — A08 waste to energy permissions","url":"https://www.epa.vic.gov.au/a08-waste-energy","access_date":"2026-10-13","kind":"primary source"},{"id":"GEO","title":"Business Queensland — geothermal authorities","url":"https://www.business.qld.gov.au/industries/mining-energy-water/resources/petroleum-energy/authorities-permits/applying/geothermal","access_date":"2026-10-13","kind":"primary source"},{"id":"EV","title":"Transport for NSW — EV charging technical specification","url":"https://standards.transport.nsw.gov.au/_entity/annotation/aee1d512-16ce-ef11-a72f-00224898bd95","access_date":"2026-10-13","kind":"primary source"},{"id":"HV","title":"Standards Australia — AS 2067:2016","url":"https://www.standards.org.au/standards-catalogue/standard-details?designation=as-2067-2016","access_date":"2026-10-13","kind":"primary source"},{"id":"TX","title":"Standards Australia — dry-type transformers","url":"https://store.standards.org.au/product/as-nzs-iec-60076-11-2024","access_date":"2026-10-13","kind":"primary source"},{"id":"CABLE","title":"IEC — photovoltaic cable, IEC 62930:2017","url":"https://webstore.iec.ch/en/publication/28067","access_date":"2026-10-13","kind":"primary source"},{"id":"CONNECT","title":"IEC — PV connectors, IEC 62852 including amendment","url":"https://webstore.iec.ch/en/publication/66763","access_date":"2026-10-13","kind":"primary source"},{"id":"BOX","title":"IEC — PV module junction boxes, IEC 62790:2020","url":"https://webstore.iec.ch/en/publication/32347","access_date":"2026-10-13","kind":"primary source"},{"id":"PCE","title":"IEC — converter safety, IEC 62477-1:2022","url":"https://webstore.iec.ch/en/publication/28936","access_date":"2026-10-13","kind":"primary source"},{"id":"CELL","title":"IEC — industrial lithium battery safety, IEC 62619:2022","url":"https://webstore.iec.ch/en/publication/64073","access_date":"2026-10-13","kind":"primary source"},{"id":"CELL2","title":"IEC — energy storage lithium battery safety, IEC 63056:2020","url":"https://webstore.iec.ch/en/publication/29224","access_date":"2026-10-13","kind":"primary source"},{"id":"STRUCT","title":"Standards Australia — wind actions","url":"https://www.standards.org.au/news/update-to-the-go-to-combined-wind-actions-standard","access_date":"2026-10-13","kind":"primary source"},{"id":"MACHINE","title":"Standards Australia — machinery safety series catalogue","url":"https://store.standards.org.au/search?query=AS+4024","access_date":"2026-10-13","kind":"primary source"},{"id":"GEMS","title":"Energy Rating — regulated product families","url":"https://www.energyrating.gov.au/industry-information/products","access_date":"2026-10-13","kind":"primary source"},{"id":"GEMSTX","title":"Energy Rating — distribution transformers","url":"https://www.energyrating.gov.au/industry-information/products/distribution-transformers","access_date":"2026-10-13","kind":"primary source"},{"id":"WATERMARK","title":"ABCB — current certification resources and product schedules","url":"https://www.abcb.gov.au/areas-interest/product-certification/resources","access_date":"2026-10-13","kind":"primary source"},{"id":"WELS","title":"Water Rating — regulated products","url":"https://www.waterrating.gov.au/industry/register/regulated-products","access_date":"2026-10-13","kind":"primary source"},{"id":"WELSLAW","title":"Water Rating — legislation","url":"https://www.waterrating.gov.au/industry/legislation-compliance/legislation","access_date":"2026-10-13","kind":"primary source"},{"id":"POTABLE","title":"Standards Australia — AS/NZS 4020:2018","url":"https://store.standards.org.au/product/as-nzs-4020-2018","access_date":"2026-10-13","kind":"primary source"},{"id":"PLUMB","title":"Standards Australia — AS/NZS 3500.1:2025","url":"https://store.standards.org.au/product/as-nzs-3500-1-2025","access_date":"2026-10-13","kind":"primary source"},{"id":"REFRIG","title":"DCCEEW — refrigerant equipment import licensing","url":"https://www.dcceew.gov.au/environment/protection/ozone/licences-and-reporting/faqs-eqpl","access_date":"2026-10-13","kind":"primary source"},{"id":"REFRIG2","title":"Standards Australia — refrigeration safety series","url":"https://www.standards.org.au/news/australia-adopts-international-standards-for-refrigeration-safety","access_date":"2026-10-13","kind":"primary source"},{"id":"ARC","title":"DCCEEW — refrigeration technicians and licences","url":"https://www.dcceew.gov.au/environment/protection/ozone/rac/technicians","access_date":"2026-10-13","kind":"primary source"},{"id":"PRESSURE","title":"WorkSafe Queensland — plant design registration scope","url":"https://www.worksafe.qld.gov.au/licensing-and-registrations/plant-design-registration/what-plant-needs-design-registration","access_date":"2026-10-13","kind":"primary source"},{"id":"PLANT","title":"WorkSafe Queensland — plant item registration scope","url":"https://www.worksafe.qld.gov.au/licensing-and-registrations/plant-registration/what-type-of-plant-requires-registration","access_date":"2026-10-13","kind":"primary source"},{"id":"CYBER","title":"Home Affairs — mandatory smart-device security standards","url":"https://www.homeaffairs.gov.au/cyber-security-subsite/Pages/security-standards-for-smart-devices.aspx","access_date":"2026-10-13","kind":"primary source"},{"id":"PRIVACY","title":"OAIC — Australian Privacy Principles","url":"https://www.oaic.gov.au/privacy/australian-privacy-principles/read-the-australian-privacy-principles","access_date":"2026-10-13","kind":"primary source"},{"id":"METER","title":"NMI — utility meter verification requirements","url":"https://www.industry.gov.au/national-measurement-institute/australias-measurement-system/utility-meter-verifiers","access_date":"2026-10-13","kind":"primary source"},{"id":"DRONE","title":"CASA — drone registration requirements","url":"https://www.casa.gov.au/drones/drone-registration/registration-requirements","access_date":"2026-10-13","kind":"primary source"},{"id":"DAM","title":"Business Queensland — building or buying a dam","url":"https://www.business.qld.gov.au/industries/mining-energy-water/water/industry-infrastructure/dams/building-buying","access_date":"2026-10-13","kind":"primary source"},{"id":"WATER","title":"Business Queensland — water authorisations","url":"https://www.business.qld.gov.au/industries/mining-energy-water/water/authorisations/water-areas","access_date":"2026-10-13","kind":"primary source"},{"id":"ENV","title":"DCCEEW — EPBC referral and assessment","url":"https://www.dcceew.gov.au/environment/epbc/approvals","access_date":"2026-10-13","kind":"primary source"},{"id":"WOOD","title":"DAFF — timber packaging and ISPM 15","url":"https://www.agriculture.gov.au/import/goods/timber-packaging/ispm-15","access_date":"2026-10-13","kind":"primary source"},{"id":"QLD","title":"WorkSafe Queensland — Electrical Safety Regulation 2026","url":"https://www.worksafe.qld.gov.au/laws-and-compliance/electrical-safety-laws/electrical-safety-regulation-2026","access_date":"2026-10-13","kind":"primary source"},{"id":"QLDLAW","title":"Queensland — current Electrical Safety Regulation 2026","url":"https://www.legislation.qld.gov.au/view/whole/html/inforce/current/sl-2026-0113","access_date":"2026-10-13","kind":"primary source"},{"id":"NSW","title":"NSW — approved electrical articles register","url":"https://www.nsw.gov.au/legal-and-justice/consumer-rights-and-protection/safety/electrical-safety/approved-electrical-articles-register","access_date":"2026-10-13","kind":"primary source"},{"id":"VIC","title":"Energy Safe Victoria — legislation","url":"https://www.energysafe.vic.gov.au/about-us/regulatory-framework/legislation-and-regulations","access_date":"2026-10-13","kind":"primary source"},{"id":"WA","title":"WA — electrical licensing","url":"https://www.wa.gov.au/organisation/service-delivery/electrical-licensing","access_date":"2026-10-13","kind":"primary source"},{"id":"SA","title":"South Australia — Electricity Act 1996","url":"https://www.legislation.sa.gov.au/lz?path=/c/a/electricity+act+1996","access_date":"2026-10-13","kind":"primary source"},{"id":"TAS","title":"Tasmania — electrical equipment safety system","url":"https://consumeraffairs.tas.gov.au/topics/technical-regulation/electrical-standard-safety/equipment/electrical-equipment-safety-system","access_date":"2026-10-13","kind":"primary source"},{"id":"ACT","title":"ACT — Electricity Safety Act 1971","url":"https://legislation.act.gov.au/a/1971-30/","access_date":"2026-10-13","kind":"primary source"},{"id":"NT","title":"NT WorkSafe — electrical safety laws","url":"https://worksafe.nt.gov.au/laws-and-compliance/electrical-safety-laws","access_date":"2026-10-13","kind":"primary source"},{"id":"WHS","title":"Safe Work Australia — plant supply and design duties","url":"https://www.safeworkaustralia.gov.au/safety-topic/managing-health-and-safety/plant-supply-design-and-registration/whs-duties","access_date":"2026-10-13","kind":"primary source"},{"id":"FUELLAW","title":"DCCEEW — fuel quality regulation","url":"https://www.dcceew.gov.au/climate-change/emissions-reduction/regulating-fuel-quality","access_date":"2026-10-13","kind":"primary source"},{"id":"CABLESIZE","title":"Standards Australia — cable selection catalogue","url":"https://store.standards.org.au/search?query=AS%2FNZS3008.1.1","access_date":"2026-10-13","kind":"primary source"},{"id":"EESSSELECT","title":"EESS — relevant-standard selection and edition rules","url":"https://www.eess.gov.au/safety-requirements/relevant-standard/","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"EESSDOC","title":"EESS — equipment safety rules and equipment definitions","url":"https://www.eess.gov.au/about/relevant-documents/","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"SAFELAWS","title":"Safe Work Australia — legislation and jurisdictional adoption","url":"https://www.safeworkaustralia.gov.au/law-and-regulation/legislation","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"ASBESTOS","title":"Australian Border Force — prohibited asbestos imports","url":"https://www.abf.gov.au/importing-exporting-and-manufacturing/prohibited-goods/asbestos","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"AICIS","title":"AICIS — articles and industrial-chemical introduction","url":"https://www.industrialchemicals.gov.au/business/getting-started-registration-importing-and-manufacturing/what-article","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"WMBC","title":"ABCB — WaterMark conformity assessment bodies","url":"https://www.abcb.gov.au/certification/watermark-conformity-assessment-bodies","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"WMSCHEDULE","title":"ABCB — WaterMark products and appliances schedule","url":"https://watermark.abcb.gov.au/schedule-products-appliances","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"HPDRAFT","title":"Energy Rating — heat-pump water-heater regulation exposure draft","url":"https://www.energyrating.gov.au/news-and-stories/exposure-draft-new-heat-pump-water-heaters-regulations-available-now-public-comment","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"GEMSMOTOR","title":"Energy Rating — electric motors and mandated test editions","url":"https://www.energyrating.gov.au/industry-information/products/electric-motors","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"GEMSAC","title":"Energy Rating — air conditioners up to 65 kW","url":"https://www.energyrating.gov.au/industry-information/products/air-conditioners-65kw","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"GEMSCOLD","title":"Energy Rating — refrigerated cabinets","url":"https://www.energyrating.gov.au/industry-information/products/refrigerated-cabinets","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"DESIGNPLANT","title":"WorkSafe Queensland — registrable plant designs","url":"https://www.worksafe.qld.gov.au/licensing-and-registrations/plant-design-registration/what-plant-needs-design-registration","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"ITEMPLANT","title":"WorkSafe Queensland — registrable plant items","url":"https://www.worksafe.qld.gov.au/licensing-and-registrations/plant-registration/what-type-of-plant-requires-registration","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"GASTYPE","title":"Energy Safe Victoria — Type A and Type B gas appliances","url":"https://www.energysafe.vic.gov.au/industry-guidance/gas/appliances-equipment-and-manufacturers/type-and-type-b-appliances","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"GASFUELCELL","title":"Energy Safe Victoria — hydrogen fuel-cell applications","url":"https://www.energysafe.vic.gov.au/gis-067-schedule-9-applications-hydrogen-fuel-cells-and-fuel-cell-systems","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"IECRE","title":"IECRE — renewable energy certification directory","url":"https://certificates.iecre.org/","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"IECEX","title":"IECEx — equipment certification bodies","url":"https://www.iecex.com/certified-equipment-scheme/contact-a-certification-body/","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-CLASS","title":"AS/NZS 4417.2:2020 + Amendment 1:2026 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-4417-2-2020-amd-1-2026","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-WIRE","title":"AS/NZS 3000:2018 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-3000-2018","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-ARRAY","title":"AS/NZS 5033:2021 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-5033-2021","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-BATSITE","title":"AS/NZS 5139:2019 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-5139-2019","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-INVCONNECT","title":"AS/NZS 4777.1:2024 — official publisher/regulator","url":"https://www.standards.org.au/blog/as-nzs-4777-updates","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-BIPVM","title":"IEC 63092-1:2020 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/32158","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-BIPVS","title":"IEC 63092-2:2020 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/32329","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-LIIND","title":"IEC 62619:2022 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/64073","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-LIESS","title":"IEC 63056:2020 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/29224","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-LIPORT","title":"IEC 62133-2:2017 + Amendment 1:2021 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/70017","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-LIPERF","title":"IEC 62620:2014 + Amendment 1:2023 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/85493","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-EESSYS","title":"IEC 62933-5-1:2024 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/72239","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-EESCHEM","title":"IEC 62933-5-2:2025 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/68297","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-LEADSAFE","title":"IEC 62485-2:2010 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/7091","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-LEADVENT","title":"IEC 60896-11:2002 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/3849","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-LEADVRLA","title":"IEC 60896-21/-22:2004 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/3850","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PCESAFE","title":"IEC 62477-1:2022 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/28936","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PCEHV","title":"IEC 62477-2:2018 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/31546","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-OFF1","title":"AS/NZS 4509.1:2009 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-4509-1-2009","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-OFF2","title":"AS/NZS 4509.2:2010 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-4509-2-2010","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-GENSET","title":"AS/NZS 3010:2017 — official publisher/regulator","url":"https://www.standards.org.au/news/enhancements-to-electrical-installations-standard-for-generating-sets","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-WINDMAIN","title":"IEC 61400-1:2019 + Amendment 1:2025 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/111042","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-WINDSMALL","title":"IEC 61400-2:2013 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/5433","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-WINDFIX","title":"IEC 61400-3-1:2019 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/29360","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-WINDNOISE","title":"IEC 61400-11:2012 + Amendment 1:2018 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/63367","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-WINDELEC","title":"IEC 61400-21-1:2019 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/29528","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-HYDROGUIDE","title":"IEC 61116:2025 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/76247","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-HYDROFIELD","title":"IEC 60041:1991 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/154","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-HYDROMODEL","title":"IEC 60193:2019 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/60951","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-HYDROSMALL","title":"IEC 62006:2010 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/6286","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-H2GEN","title":"AS 22734:2020 — official publisher/regulator","url":"https://www.standards.org.au/news/hydrogen-sees-australia-taking-a-big-step-towards-sustainable-energy-solutions","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-H2NEW","title":"ISO 22734-1:2025 — official publisher/regulator","url":"https://www.iso.org/standard/82766.html","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-H2FUEL","title":"ISO 14687:2025 — official publisher/regulator","url":"https://www.iso.org/standard/82660.html","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-H2STATION","title":"ISO 19880-1:2020 — official publisher/regulator","url":"https://www.iso.org/standard/71940.html","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-H2DISP","title":"AS 19880.2:2026 — official publisher/regulator","url":"https://www.standards.org.au/sector-updates/electricity-and-gas","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-H2TANK","title":"ISO 19881:2025 — official publisher/regulator","url":"https://www.iso.org/standard/19881","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-FCMOD","title":"IEC 62282-2-100:2020 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/59780","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-FCSYS","title":"IEC 62282-3-100:2019 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/59566","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-BOILER","title":"AS 1228:2016 — official publisher/regulator","url":"https://store.standards.org.au/product/as-1228","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PIPING","title":"AS 4041:2006 — official publisher/regulator","url":"https://www.standards.org.au/standards-catalogue/standard-details?designation=as-4041-2006","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PIPELINE","title":"AS 2885.0:2018 and applicable series parts — official publisher/regulator","url":"https://store.standards.org.au/product/as-2885-0-2018","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-GASINSTALL","title":"AS/NZS 5601.1:2022 — official publisher/regulator","url":"https://www.energysafe.vic.gov.au/industry-guidance/gas/gasfitters-toolkit/asnzs-5601-changes","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-MACHINEELEC","title":"IEC 60204-1:2016 + Amendment 1:2021 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/71256","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-FUNCSAFE","title":"IEC 62061:2021 + Amendments 1:2024 and 2:2026 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/92835","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-ROBOT","title":"ISO 10218-1:2025 and applicable integration requirements — official publisher/regulator","url":"https://www.iso.org/standard/73933.html","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-EVAC","title":"IEC 61851-1:2017 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/33644","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-EVDC","title":"IEC 61851-23:2023 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/32973","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-EVPLUG","title":"IEC 62196-2:2025 with applicable IEC 62196-1/-3 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/86317","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-EVPORT","title":"IEC 62752:2024 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/66220","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-EVRDC","title":"IEC 62955:2018 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/32963","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-HV","title":"AS 2067:2016 — official publisher/regulator","url":"https://store.standards.org.au/product/as-2067-2016","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-TXDRY","title":"AS/NZS IEC 60076.11:2024 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-iec-60076-11-2024","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-LVBOARD","title":"AS/NZS 61439.1:2026 and applicable assembly part — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-61439-1-2026","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PVCABLE","title":"IEC 62930:2017 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/28067","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PVPLUG","title":"IEC 62852:2014 + Amendment 1:2020 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/66763","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PVBOX","title":"IEC 62790:2020 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/32347","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-EMPTYBOX","title":"IEC 62208:2023 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/67906","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-IP","title":"IEC 60529 consolidated edition 2.2 (2013) — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/2452","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-BREAKER","title":"IEC 60947-2:2024 / applicable AS/NZS adoption — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/66277","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-MCB","title":"IEC 60898-1:2015 + Amendment 1:2019 / applicable national adoption — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/66269","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PVSPD","title":"IEC 61643-31:2018 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/26931","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-DCSPD","title":"IEC 61643-41:2025 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/27917","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-LIGHTNING","title":"IEC 62305 Parts 1–4:2024 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/6797","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PVFUSE","title":"IEC 60269-6:2010 + Amendment 1:2021 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/68843","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-STEEL","title":"AS 4100:2020; AS/NZS 5131:2016; AS/NZS 4600:2018 where cold-formed — official publisher/regulator","url":"https://www.standards.org.au/news/revised-steel-standards-to-support-industry","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-ALUMINIUM","title":"AS/NZS 1664.1:1997 or AS/NZS 1664.2:1997 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-1664-1-1997","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-CONCRETE","title":"AS 3600:2018 — official publisher/regulator","url":"https://www.standards.org.au/news/revised-document-to-help-industry-prepare-for-earthquakes","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-ANCHOR","title":"AS 5216:2026 — official publisher/regulator","url":"https://store.standards.org.au/product/as-5216-2026","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-GALV","title":"AS/NZS 4680:2025 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-4680-2025","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-ICT","title":"AS/NZS 62368.1:2026 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-62368-1-2026","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-CYBERTECH","title":"IEC 62443-4-1:2018 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/33615","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-REFRIG","title":"AS/NZS 5149 Parts 1–4:2016; AS/NZS ISO 817:2016 — official publisher/regulator","url":"https://www.standards.org.au/news/australia-adopts-international-standards-for-refrigeration-safety","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-HP","title":"AS/NZS 60335.2.40:2025 with AS/NZS 60335.1 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-60335-2-40-2025","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-SOLTHERM","title":"ISO 9806:2025 — official publisher/regulator","url":"https://www.iso.org/standard/78801.html","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-FRIDGE","title":"AS/NZS 60335.2.24:2025; appropriate commercial Part .2.89 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-60335-2-24-2025","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-PUMPINT","title":"IEC 60335-2-41:2024 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/70371","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-FILTER","title":"AS 3497:2021 — official publisher/regulator","url":"https://watermark.abcb.gov.au/portal/specification/34972021","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-TANK","title":"AS/NZS 4766:2020 + Amendment 1:2024 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-4766-2020-amd-1-2024","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-TOOLSSTD","title":"AS/NZS 62841.1:2026 + tool-specific part — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-62841-1-2026","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-TESTSAFE","title":"IEC 61010-1:2010 + Amendment 1:2016 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/59769","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-TESTCIRCUIT","title":"IEC 61010-2-030:2023 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/75915","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-INSTALLTEST","title":"IEC 61557-1:2019 + function-specific parts — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/60891","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-VERIFY","title":"AS/NZS 3017:2022 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-3017-2022","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-INUSE","title":"AS/NZS 3760:2022 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-3760-2022","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-GLOVE","title":"IEC 60903:2014 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/3871","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-EYE","title":"AS/NZS 1337.1:2010 — official publisher/regulator","url":"https://store.standards.org.au/product/as-nzs-1337-1-2010","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-HEADHAND","title":"WorkSafe Queensland — electrical-apprentice safe working and supervision guide (PPE guidance)","url":"https://www.worksafe.qld.gov.au/__data/assets/pdf_file/0014/134303/Safe-working-and-supervision-guide-for-electrical-apprentices.pdf","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-FALL","title":"AS/NZS 1891.1:2020; AS/NZS 1891.4:2025 — official publisher/regulator","url":"https://www.standards.org.au/blog/spotlight-on-as-nzs-1891-4-2025","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-RESP","title":"AS/NZS 1716:2012; AS/NZS 1715:2009 and adopted successor parts — official publisher/regulator","url":"https://www.standards.org.au/flagship-projects/respiratory-protection-standards","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-HEARING","title":"AS/NZS 1270 — applicable accepted edition — official publisher/regulator","url":"https://www.safework.nsw.gov.au/resource-library/agriculture%2C-forestry-and-fishing-publications/farming-publications/silo-safety-self-assessment-checklist","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STD-ACSPD","title":"IEC 61643-11:2025 — official publisher/regulator","url":"https://webstore.iec.ch/en/publication/65314","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"NCCSTATE1","title":"Queensland — NCC adoption","url":"https://www.business.qld.gov.au/industries/building-property-development/building-construction/laws-codes-standards/building","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"NCCSTATE2","title":"New South Wales — NCC adoption","url":"https://www.nsw.gov.au/housing-and-construction/compliance-and-regulation/how-to-comply-national-construction-code","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"NCCSTATE3","title":"Victoria — NCC adoption","url":"https://www.building.vic.gov.au/before-you-start-building/building-standards-in-victoria","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"NCCSTATE4","title":"Western Australia — NCC adoption","url":"https://www.parliament.wa.gov.au/hansard/daily/uh/2026-05-05/33","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"NCCSTATE5","title":"South Australia — NCC adoption","url":"https://plan.sa.gov.au/resources/building/building_code/2025-updates/state-updates","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"NCCSTATE6","title":"Tasmania — NCC adoption","url":"https://buildingstandards.tas.gov.au/topics/technical-regulation/building-standards/national-construction-code-ncc-2025/national-construction-code-ncc-2026","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"NCCSTATE7","title":"Australian Capital Territory — NCC adoption","url":"https://www.planning.act.gov.au/planning-projects/building-regulatory-system/national-construction-code-ncc","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"NCCSTATE8","title":"Northern Territory — NCC adoption","url":"https://nt.gov.au/property/building/code/national-construction-code","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STATEEX1","title":"SA OTR legislation and product regulation","url":"https://energymining.sa.gov.au/about/open-government/annual-reports/otr-annual-reports/otr-annual-report-2023-24","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STATEEX2","title":"Tasmania operative electrical Act","url":"https://www.legislation.tas.gov.au/view/whole/html/inforce/current/act-1997-072","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STATEEX3","title":"Tasmania 2026 electricity safety regulation consultation","url":"https://consumeraffairs.tas.gov.au/newsroom/consultations/electricity-safety-regulations-2026-consultation-closed","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STATEEX4","title":"ACT Electricity Safety Regulation — current status","url":"https://www.legislation.act.gov.au/sl/2004-37/","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STATEEX5","title":"WA legislative framework","url":"https://www.wa.gov.au/organisation/building-and-energy/building-and-energy-legislative-framework","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STATEEX6","title":"Queensland gas legislation","url":"https://www.business.qld.gov.au/industries/mining-energy-water/energy/gas/regulation/legislation","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STATEEX7","title":"Victoria gas acceptance","url":"https://www.energysafe.vic.gov.au/industry-guidance/gas/appliances-equipment-and-manufacturers/type-and-type-b-appliances","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"STATEEX8","title":"NT dangerous-goods laws","url":"https://worksafe.nt.gov.au/laws-and-compliance/dangerous-goods-laws","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"PROJECT1","title":"Queensland — principal project permission route","url":"https://www.business.qld.gov.au/industries/mining-energy-water/energy/renewable/project-development/planning-approvals","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"PROJECT2","title":"New South Wales — principal project permission route","url":"https://www.planning.nsw.gov.au/the-planning-system/renewable-energy","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"PROJECT3","title":"Victoria — principal project permission route","url":"https://www.epa.vic.gov.au/licences-permits-and-registrations","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"PROJECT4","title":"Western Australia — principal project permission route","url":"https://epa.wa.gov.au/eia-process","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"PROJECT5","title":"South Australia — principal project permission route","url":"https://energymining.sa.gov.au/industry/hydrogen-and-renewable-energy/hydrogen-and-renewable-energy-act/licensing-and-approvals/transitional-provisions","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"PROJECT6","title":"Tasmania — principal project permission route","url":"https://www.legislation.tas.gov.au/view/whole/html/inforce/current/act-1994-044","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"PROJECT7","title":"Australian Capital Territory — principal project permission route","url":"https://www.planning.act.gov.au/professionals/our-planning-system/planning-act-2023","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"PROJECT8","title":"Northern Territory — principal project permission route","url":"https://nt.gov.au/property/land-planning-and-development/our-planning-system/how-planning-works-in-the-nt","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"WAWATER","title":"WA water-resource laws","url":"https://www.wa.gov.au/service/natural-resources/water-resources/water-resources-management-legislation","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"SAWATER","title":"SA environmental/water legislation","url":"https://www.environment.sa.gov.au/about-us/legislation","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"TASWATER","title":"Tasmania Water Management Act","url":"https://www.legislation.tas.gov.au/view/html/inforce/current/act-1999-045","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"TASPLAN","title":"Tasmania Land Use Planning and Approvals Act","url":"https://www.legislation.tas.gov.au/view/html/inforce/current/act-1993-070","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"TASGAS","title":"Tasmania gas installation/biogas acceptance","url":"https://consumeraffairs.tas.gov.au/topics/resources-tools/building-and-trades-forms%2C-publications-and-reports","access_date":"2026-10-13","kind":"primary regulator/publisher source"},{"id":"ACTWATER","title":"ACT Water Strategy 2025–45 and governing laws","url":"https://www.act.gov.au/__data/assets/pdf_file/0012/3022212/act-water-strategy-2025-45.pdf","access_date":"2026-10-13","kind":"primary regulator/publisher source"}],"open_qualification_items":[],"ai_integration":{"purpose":"Supplier/public reference and requirements screening; not automated certification or approval","required_inputs":["Exact product/model and configuration","Category/subcategory","State/territory, postcode and DNSP/TNSP","Installation type, intended use and site hazards","Voltage/current/power/capacity","Battery/fuel/refrigerant chemistry and transport modes","Grid import/export, islanding and backup modes","Consumer/industrial and trade-metering use","Scheme or grant sought","Assessment/install date"],"answer_rules":["Retrieve by exact subcategory ID and linked profiles; include shared ACL/SAFE baseline and relevant jurisdiction record.","Resolve each conditional trigger from user inputs. If it cannot be resolved, ask the needed question and label the requirement undetermined.","Distinguish law-required, installation-required, scheme-required, network/contract-required and voluntary/candidate references. Never label all catalogue standards mandatory.","Show exact authority, official source link, edition/effective date and last verification. Current scheme/model status requires fresh checks.","Explain the role of a listing, test report, conformity certificate, registration and site permission separately. CE/UL marks alone do not establish Australian compliance.","Preserve expiry/suspension and transition conditions; do not apply a future definition before commencement or assume an older edition is invalid where still legally accepted.","Require authorised qualified review for engineering design, authority approval and unresolved mandatory requirements; never claim RRE certifies a product.","Prevent candidate/unreviewed mappings from producing a compliant/approved verdict. If sources conflict, report the conflict and require resolution.","Output product evidence and project approvals separately; track actual model, firmware, bill of materials and approved configuration.","Recheck on regulatory update, product change, purchase and installation; periodic refresh is proposed, not an automation created by this task.","Use before_supply and installation_or_project separately; retrieve all shared supply gates, row standards and linked profiles.","For every requirement return type (law, installation, scheme, network/contract or technical), condition, accepted edition, authority, evidence and official source. Never infer passed compliance from category membership.","No mandatory requirement may be silently dropped because a user has not supplied the relevant input. Keep its conditional branch visible."],"answer_template":["Product/model/configuration and intended use","Applicable supplier gates and jurisdiction","Standard references, parts/edition and triggering condition","Before-supply evidence, registrations and responsible route","Site/network/scheme approvals separately","Unresolved factual inputs and precise question needed","Official links and last research date; no approval verdict without verified evidence"],"integration_status":"Specification and structured research data only; no live integration performed"},"complete_legal_inventory":false,"standards_registry":{"ESSENTIAL":{"id":"ESSENTIAL","reference":"AS/NZS 3820","purpose":"Essential safety requirements for electrical equipment","trigger":"Electrical equipment; EESS fallback if no applicable national/IEC product standard exists","requirement_route":"Product safety obligation and EESS standard-selection rule","source_ids":["EESSSELECT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"CLASS":{"id":"CLASS","reference":"AS/NZS 4417.2:2020 + Amendment 1:2026","purpose":"Equipment definitions and RCM regulatory arrangements","trigger":"Determine the actual equipment class and commencement date, rather than treating its RRE category as a risk level","requirement_route":"Electrical equipment regulatory classification","source_ids":["EESSDOC","CLASSES","STD-CLASS"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"WIRE":{"id":"WIRE","reference":"AS/NZS 3000:2018","purpose":"Electrical installation safety","trigger":"Fixed electrical installation","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-WIRE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ARRAY":{"id":"ARRAY","reference":"AS/NZS 5033:2021","purpose":"PV-array design and installation","trigger":"PV arrays within scope","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-ARRAY"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"BATSITE":{"id":"BATSITE","reference":"AS/NZS 5139:2019","purpose":"Battery installation and safety","trigger":"Battery systems within the standard’s scope; assess exclusions and capacity/voltage","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-BATSITE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"INVCONNECT":{"id":"INVCONNECT","reference":"AS/NZS 4777.1:2024","purpose":"Inverter-system installation","trigger":"Grid-connected inverter systems in scope","requirement_route":"Installation and network connection","source_ids":["STD-INVCONNECT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"INVGRID":{"id":"INVGRID","reference":"AS/NZS 4777.2:2020 + Amendment 2:2024","purpose":"Inverter grid interface and testing","trigger":"In-scope grid-connected inverter or bidirectional EV system; network/CEC acceptance","requirement_route":"Network and scheme requirement","source_ids":["INV"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PVPERF":{"id":"PVPERF","reference":"IEC 61215:2021 applicable technology parts","purpose":"PV design qualification and type approval","trigger":"CEC-listed terrestrial PV modules; select technology-specific parts","requirement_route":"CEC/scheme-required where applicable","source_ids":["PV","PV61215"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PVSAFE":{"id":"PVSAFE","reference":"IEC 61730-1/-2:2023","purpose":"PV module safety qualification","trigger":"New CEC module applications from 1 May 2026","requirement_route":"CEC/scheme-required where applicable","source_ids":["PV"],"edition_note":"Existing CEC listings to IEC 61730:2016 can remain until their expiry; this does not permit new 2016 applications.","full_text_clause_audit":false},"BIPVM":{"id":"BIPVM","reference":"IEC 63092-1:2020","purpose":"Building-integrated PV modules","trigger":"Modules functioning as building products","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-BIPVM"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"BIPVS":{"id":"BIPVS","reference":"IEC 63092-2:2020","purpose":"Building-integrated PV systems","trigger":"Building-envelope PV assemblies","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-BIPVS"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"LUM":{"id":"LUM","reference":"AS/NZS 60598 applicable Parts 1 and 2","purpose":"Luminaire safety","trigger":"Solar lighting luminaire: select road/street, floodlight, fixed or portable part by actual use","requirement_route":"Electrical product safety; installation where applicable","source_ids":["CLASSES","EESSSELECT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"DRIVER":{"id":"DRIVER","reference":"AS/NZS 61347.2.13 / AS/NZS 61558.2.6 as applicable","purpose":"LED-driver or safety-isolating supply","trigger":"Select from declared equipment definition and supply design","requirement_route":"Product safety/class certificate if required","source_ids":["CLASSES"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"LIIND":{"id":"LIIND","reference":"IEC 62619:2022","purpose":"Industrial lithium-cell/battery safety","trigger":"Stationary industrial lithium batteries","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-LIIND"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"LIESS":{"id":"LIESS","reference":"IEC 63056:2020","purpose":"Lithium batteries used in energy storage","trigger":"EES batteries in scope","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-LIESS"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"LIPORT":{"id":"LIPORT","reference":"IEC 62133-2:2017 + Amendment 1:2021","purpose":"Portable sealed lithium-cell/battery safety","trigger":"Portable lithium batteries; do not substitute for stationary-system assessment","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-LIPORT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"LIPERF":{"id":"LIPERF","reference":"IEC 62620:2014 + Amendment 1:2023","purpose":"Industrial lithium battery performance","trigger":"Performance claims for industrial cells/batteries","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-LIPERF"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EESSYS":{"id":"EESSYS","reference":"IEC 62933-5-1:2024","purpose":"Electrical-energy-storage system safety","trigger":"EES system-level hazard assessment","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-EESSYS"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EESCHEM":{"id":"EESCHEM","reference":"IEC 62933-5-2:2025","purpose":"Grid-integrated electrochemical storage safety","trigger":"Grid-integrated electrochemical BESS within scope","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-EESCHEM"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"LEADSAFE":{"id":"LEADSAFE","reference":"IEC 62485-2:2010","purpose":"Stationary battery installation safety","trigger":"Stationary lead-acid and other covered batteries","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-LEADSAFE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"LEADVENT":{"id":"LEADVENT","reference":"IEC 60896-11:2002","purpose":"Vented stationary lead-acid batteries","trigger":"Vented lead-acid product","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-LEADVENT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"LEADVRLA":{"id":"LEADVRLA","reference":"IEC 60896-21/-22:2004","purpose":"Valve-regulated stationary lead-acid tests and requirements","trigger":"VRLA product","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-LEADVRLA"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"BATSPEC":{"id":"BATSPEC","reference":"SA TS 5398:2025","purpose":"Battery-system product safety specifications","trigger":"CEC battery-list application/transition and scheme requiring that list","requirement_route":"Scheme-required when applicable","source_ids":["BAT"],"edition_note":"CEC accepts the prior battery guide or TS during 2026. New applications use TS from 1 January 2027; prior-guide listings expire by 31 December 2027. Check current model listing.","full_text_clause_audit":false},"UN38":{"id":"UN38","reference":"UN Manual of Tests and Criteria, subsection 38.3","purpose":"Lithium-cell/battery transport qualification and test summary","trigger":"Lithium cells/batteries offered for transport; exemptions and prototype provisions depend on mode","requirement_route":"Transport law/carrier requirement","source_ids":["UN","ADG","AIR","SEA"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ADGCODE":{"id":"ADGCODE","reference":"Australian Dangerous Goods Code, edition 7.9","purpose":"Road/rail dangerous-goods classification, packaging and documentation","trigger":"Consignments classified as dangerous goods","requirement_route":"Transport law through state/territory adoption","source_ids":["ADG"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PVINVSAFE":{"id":"PVINVSAFE","reference":"IEC 62109-1/-2 — scheme-accepted edition","purpose":"PV power-converter safety","trigger":"PV inverter with PV input; certification scope must cover actual configuration","requirement_route":"Electrical safety and CEC evidence","source_ids":["INV","EESSSELECT"],"edition_note":"Do not assume a newly published IEC edition replaces the edition accepted by CEC. Check the applicable certificate and accepted standard list.","full_text_clause_audit":false},"PCESAFE":{"id":"PCESAFE","reference":"IEC 62477-1:2022","purpose":"Power electronic converter system safety","trigger":"Non-PV/battery converter within low-voltage scope","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-PCESAFE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PCEHV":{"id":"PCEHV","reference":"IEC 62477-2:2018","purpose":"High-voltage power-converter safety","trigger":"Converters above the low-voltage part’s scope","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-PCEHV"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"CHARGER":{"id":"CHARGER","reference":"AS/NZS 60335.2.29 with AS/NZS 60335.1","purpose":"Battery-charger appliance safety","trigger":"Charger meeting equipment-class definition","requirement_route":"Electrical product certification where class requires it","source_ids":["CLASSES"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"OFF1":{"id":"OFF1","reference":"AS/NZS 4509.1:2009","purpose":"Stand-alone power-system safety and installation","trigger":"Stand-alone power systems in scope","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-OFF1"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"OFF2":{"id":"OFF2","reference":"AS/NZS 4509.2:2010","purpose":"Stand-alone power-system design","trigger":"Sizing/design of stand-alone systems","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-OFF2"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"GENSET":{"id":"GENSET","reference":"AS/NZS 3010:2017","purpose":"Electrical generating sets","trigger":"Generator installation, transfer and operating arrangements","requirement_route":"Installation law where adopted","source_ids":["STD-GENSET"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"MOBILE":{"id":"MOBILE","reference":"AS/NZS 3001.1/.2:2022","purpose":"Connectable installations and supply arrangements","trigger":"Connectable vehicles/transportable structures in scope; not every shipping container","requirement_route":"Installation law where adopted","source_ids":["INSTALL","STANDARD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"WINDMAIN":{"id":"WINDMAIN","reference":"IEC 61400-1:2019 + Amendment 1:2025","purpose":"Wind-turbine design requirements","trigger":"General wind turbine design","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-WINDMAIN"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"WINDSMALL":{"id":"WINDSMALL","reference":"IEC 61400-2:2013","purpose":"Small wind turbine design","trigger":"Small wind turbine within scope","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-WINDSMALL"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"WINDFIX":{"id":"WINDFIX","reference":"IEC 61400-3-1:2019","purpose":"Fixed offshore wind design","trigger":"Fixed offshore turbine; floating systems need distinct design assessment","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-WINDFIX"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"WINDNOISE":{"id":"WINDNOISE","reference":"IEC 61400-11:2012 + Amendment 1:2018","purpose":"Acoustic emission measurement","trigger":"Wind-noise planning/contract evidence","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-WINDNOISE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"WINDELEC":{"id":"WINDELEC","reference":"IEC 61400-21-1:2019","purpose":"Electrical-characteristic measurement","trigger":"Wind turbine network-performance evidence","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-WINDELEC"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HYDROGUIDE":{"id":"HYDROGUIDE","reference":"IEC 61116:2025","purpose":"Small hydro installation guidance","trigger":"Small hydro installations","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-HYDROGUIDE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HYDROFIELD":{"id":"HYDROFIELD","reference":"IEC 60041:1991","purpose":"Hydraulic turbine/pump field acceptance tests","trigger":"Contracted field-performance acceptance","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-HYDROFIELD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HYDROMODEL":{"id":"HYDROMODEL","reference":"IEC 60193:2019","purpose":"Hydraulic model acceptance tests","trigger":"Model-test procurement for large turbine/storage equipment","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-HYDROMODEL"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HYDROSMALL":{"id":"HYDROSMALL","reference":"IEC 62006:2010","purpose":"Small hydro acceptance tests","trigger":"Small hydro generating-machine field tests","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-HYDROSMALL"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"H2GEN":{"id":"H2GEN","reference":"AS 22734:2020","purpose":"Hydrogen generators using water electrolysis","trigger":"Electrolyser product and hydrogen safety-code adoption","requirement_route":"Technical standard / adopted hydrogen code","source_ids":["H2","STD-H2GEN"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"H2NEW":{"id":"H2NEW","reference":"ISO 22734-1:2025","purpose":"Electrolyser safety","trigger":"International design/certification specification; does not automatically amend AS 22734","requirement_route":"Technical conformity","source_ids":["STD-H2NEW"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"H2FUEL":{"id":"H2FUEL","reference":"ISO 14687:2025","purpose":"Hydrogen fuel quality","trigger":"Hydrogen-fuel specification/quality claim","requirement_route":"Fuel supply contract or incorporated rule","source_ids":["STD-H2FUEL"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"H2STATION":{"id":"H2STATION","reference":"ISO 19880-1:2020","purpose":"Hydrogen fuelling-station general requirements","trigger":"Hydrogen refuelling project","requirement_route":"Technical specification or incorporated code","source_ids":["STD-H2STATION"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"H2DISP":{"id":"H2DISP","reference":"AS 19880.2:2026","purpose":"Hydrogen fuelling dispensers","trigger":"Hydrogen dispensing equipment","requirement_route":"Technical conformity / adoption check","source_ids":["STD-H2DISP"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"H2TANK":{"id":"H2TANK","reference":"ISO 19881:2025","purpose":"Vehicle hydrogen fuel containers","trigger":"Vehicle onboard hydrogen container; not a substitute for stationary pressure-vessel rules","requirement_route":"Vehicle product/contract approval","source_ids":["STD-H2TANK"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"FCMOD":{"id":"FCMOD","reference":"IEC 62282-2-100:2020","purpose":"Fuel-cell module safety","trigger":"Fuel-cell modules","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-FCMOD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"FCSYS":{"id":"FCSYS","reference":"IEC 62282-3-100:2019","purpose":"Stationary fuel-cell power-system safety","trigger":"Stationary integrated fuel-cell system","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-FCSYS"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PRESSCLASS":{"id":"PRESSCLASS","reference":"AS 4343:2014","purpose":"Pressure equipment hazard levels","trigger":"Pressure plant registration assessment; Queensland uses this prescribed edition","requirement_route":"Plant law classification where prescribed","source_ids":["DESIGNPLANT","ITEMPLANT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"VESSEL":{"id":"VESSEL","reference":"AS 1210:2010","purpose":"Pressure-vessel design","trigger":"Pressure vessel constructed to Australian design code","requirement_route":"Design code selected under plant-law/contract route","source_ids":["PRESSURE","DESIGNPLANT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"BOILER":{"id":"BOILER","reference":"AS 1228:2016","purpose":"Pressure boiler design","trigger":"Boiler product and applicable plant-registration threshold","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-BOILER"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PIPING":{"id":"PIPING","reference":"AS 4041:2006","purpose":"Pressure piping","trigger":"Pressure piping within scope","requirement_route":"Plant/design rule or contract","source_ids":["STD-PIPING"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PIPELINE":{"id":"PIPELINE","reference":"AS 2885.0:2018 and applicable series parts","purpose":"Gas/petroleum pipeline framework","trigger":"Pipeline vs plant-piping boundary established with regulator","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-PIPELINE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"GASINSTALL":{"id":"GASINSTALL","reference":"AS/NZS 5601.1:2022","purpose":"Gas installations","trigger":"Covered gas installation; confirm hydrogen/biogas scope and local acceptance","requirement_route":"Gas installation law where adopted","source_ids":["STD-GASINSTALL"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"INDGAS":{"id":"INDGAS","reference":"AS 3814 — regulator-accepted edition","purpose":"Industrial/commercial gas-fired appliance assessment","trigger":"Type B/industrial gas appliance where state rules require acceptance","requirement_route":"Gas approval law","source_ids":["GASTYPE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EX":{"id":"EX","reference":"AS/NZS 60079 applicable parts; IECEx equipment certification","purpose":"Explosive-atmosphere equipment, selection, installation and inspection","trigger":"Hydrogen, biogas, combustible dust or other classified hazardous location","requirement_route":"WHS/electrical/gas law and project hazard classification","source_ids":["H2","MACHINE","IECEX"],"edition_note":"Select protection-specific equipment parts and installation/inspection parts against the actual zone, gas/dust group, temperature class and equipment protection level; an IECEx certificate must cover the supplied model.","full_text_clause_audit":false},"MACHINEELEC":{"id":"MACHINEELEC","reference":"IEC 60204-1:2016 + Amendment 1:2021","purpose":"Electrical equipment of machinery","trigger":"Machine electrical assembly","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-MACHINEELEC"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"MACHINE":{"id":"MACHINE","reference":"AS/AS/NZS 4024 applicable machinery-safety parts","purpose":"Risk assessment, guarding, interlocks, distances and functional controls","trigger":"Machine/robot/conveyor/tracker risk assessment","requirement_route":"WHS/OHS plant duty; selected standards provide conformity evidence","source_ids":["MACHINE","WHS"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"FUNCSAFE":{"id":"FUNCSAFE","reference":"IEC 62061:2021 + Amendments 1:2024 and 2:2026","purpose":"Machinery safety-related control systems","trigger":"Safety function relying on electrical/electronic/programmed control","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-FUNCSAFE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ROBOT":{"id":"ROBOT","reference":"ISO 10218-1:2025 and applicable integration requirements","purpose":"Industrial robot safety","trigger":"Industrial robots; assess integration and non-industrial scope separately","requirement_route":"WHS risk management / contract","source_ids":["STD-ROBOT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EVAC":{"id":"EVAC","reference":"IEC 61851-1:2017","purpose":"Conductive EV charging general requirements","trigger":"AC charging system and applicable general DC requirements","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-EVAC"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EVDC":{"id":"EVDC","reference":"IEC 61851-23:2023","purpose":"DC EV supply equipment","trigger":"DC conductive charging equipment","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-EVDC"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EVPLUG":{"id":"EVPLUG","reference":"IEC 62196-2:2025 with applicable IEC 62196-1/-3","purpose":"EV conductive plugs and vehicle connectors","trigger":"AC vs DC interface and actual rating","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-EVPLUG"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EVPORT":{"id":"EVPORT","reference":"IEC 62752:2024","purpose":"Mode 2 in-cable control and protection","trigger":"Portable Mode 2 charging cable/control assembly","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-EVPORT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EVRDC":{"id":"EVRDC","reference":"IEC 62955:2018","purpose":"Residual DC detecting devices","trigger":"RDC-DD used for relevant AC EV charging protection","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-EVRDC"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HV":{"id":"HV","reference":"AS 2067:2016","purpose":"High-voltage substations and installations","trigger":"HV plant and switchyard","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-HV"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"TXFAMILY":{"id":"TXFAMILY","reference":"AS/NZS 60076 applicable parts","purpose":"Power-transformer design and testing","trigger":"Transformer type: oil/dry, distribution/power, protection and accessories","requirement_route":"Electrical/network specification","source_ids":["TX","GEMSTX"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"TXDRY":{"id":"TXDRY","reference":"AS/NZS IEC 60076.11:2024","purpose":"Dry-type power transformers","trigger":"Dry-type transformer within scope","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-TXDRY"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"TXGEMS":{"id":"TXGEMS","reference":"AS 2374.1:1997 and AS 2374.1.2:2003","purpose":"Mandated distribution-transformer efficiency tests","trigger":"Transformer inside GEMS Distribution Transformers Determination 2012 scope","requirement_route":"GEMS registration / efficiency law","source_ids":["GEMSTX"],"edition_note":"The determination’s incorporated editions remain the legal test basis even where the technical catalogue has newer transformer standards.","full_text_clause_audit":false},"LVBOARD":{"id":"LVBOARD","reference":"AS/NZS 61439.1:2026 and applicable assembly part","purpose":"Low-voltage assembly design/routine verification","trigger":"Board type including power assembly or distribution board; use legally/contractually accepted part/edition","requirement_route":"Electrical installation/product safety and assembly-verification route","source_ids":["STD-LVBOARD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HVBOARD":{"id":"HVBOARD","reference":"AS 62271.200:2019 and applicable AS/IEC 62271 parts","purpose":"High-voltage switchgear assemblies","trigger":"Metal-enclosed HV switchgear and applicable component class","requirement_route":"HV electrical/network specification","source_ids":["HV","STANDARD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PVCABLE":{"id":"PVCABLE","reference":"IEC 62930:2017","purpose":"PV DC cable construction/tests","trigger":"PV DC cable within scope","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-PVCABLE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ACCABLE":{"id":"ACCABLE","reference":"AS/NZS 5000.1/.2; AS/NZS 3191 as applicable","purpose":"Power/installation/flexible cable","trigger":"Select voltage, insulation and cable construction; building-wire approval when class definition met","requirement_route":"Electrical safety/class certificate","source_ids":["CABLE","CLASSES"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"CABLESIZE":{"id":"CABLESIZE","reference":"AS/NZS 3008.1.1:2025","purpose":"Cable current rating, voltage drop and short-circuit selection","trigger":"Australian LV installation cable selection","requirement_route":"Installation/design rule where adopted","source_ids":["CABLESIZE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PVPLUG":{"id":"PVPLUG","reference":"IEC 62852:2014 + Amendment 1:2020","purpose":"PV DC connectors","trigger":"PV connector and mated-pair compatibility","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-PVPLUG"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PVBOX":{"id":"PVBOX","reference":"IEC 62790:2020","purpose":"PV-module junction boxes","trigger":"Module-mounted junction boxes; combiner is a different assembly","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-PVBOX"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"MAINSPLUG":{"id":"MAINSPLUG","reference":"AS/NZS 3112; AS/NZS 3123; AS/NZS 3199 as applicable","purpose":"Mains/industrial plugs and cord-extension sets","trigger":"Actual plug, socket, portable outlet or extension-set class","requirement_route":"Electrical safety/class certificate","source_ids":["CLASSES"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"CONDUIT":{"id":"CONDUIT","reference":"AS/NZS 2053 / applicable AS/NZS IEC 61386 parts","purpose":"Conduit systems for electrical installations","trigger":"Material, rigid/flexible and mechanical/environmental duty","requirement_route":"Technical/installation standard selected by designer","source_ids":["CABLE","STANDARD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EARTH":{"id":"EARTH","reference":"AS/NZS 3000 and AS 2067 earthing provisions","purpose":"Protective bonding and earthing design","trigger":"LV/HV installation and fault-current duty","requirement_route":"Installation and network rule","source_ids":["WIRING","HV"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EMPTYBOX":{"id":"EMPTYBOX","reference":"IEC 62208:2023","purpose":"Empty LV assembly enclosures","trigger":"Empty enclosure; assembled equipment needs its own verification","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-EMPTYBOX"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"IP":{"id":"IP","reference":"IEC 60529 consolidated edition 2.2 (2013)","purpose":"Ingress-protection classification","trigger":"Claimed IP rating and installation exposure","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-IP"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"BREAKER":{"id":"BREAKER","reference":"IEC 60947-2:2024 / applicable AS/NZS adoption","purpose":"Industrial circuit breakers","trigger":"Industrial breaker class and AC/DC duty","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-BREAKER"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"MCB":{"id":"MCB","reference":"IEC 60898-1:2015 + Amendment 1:2019 / applicable national adoption","purpose":"Household/similar AC circuit breakers","trigger":"Household breaker; DC needs appropriate DC scope","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-MCB"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ISOLATOR":{"id":"ISOLATOR","reference":"AS/NZS 60947.3 — regulator-accepted edition","purpose":"Switches, disconnectors and switch-disconnectors","trigger":"DC-isolator class and actual DC utilisation/rating","requirement_route":"Electrical safety/class certificate; PV installation requirement","source_ids":["CLASSES"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PVSPD":{"id":"PVSPD","reference":"IEC 61643-31:2018","purpose":"PV DC surge-protective devices","trigger":"PV-side surge protection","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-PVSPD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"DCSPD":{"id":"DCSPD","reference":"IEC 61643-41:2025","purpose":"Other DC surge-protective devices","trigger":"DC applications excluding PV scope","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-DCSPD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"LIGHTNING":{"id":"LIGHTNING","reference":"IEC 62305 Parts 1–4:2024","purpose":"Lightning risk, protection and electrical systems","trigger":"Lightning protection assessment/design","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-LIGHTNING"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PVFUSE":{"id":"PVFUSE","reference":"IEC 60269-6:2010 + Amendment 1:2021","purpose":"PV fuse-links","trigger":"PV DC fuse protection","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-PVFUSE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"RELAY":{"id":"RELAY","reference":"IEC 60255 applicable parts","purpose":"Measuring relays and protection equipment","trigger":"Relay accuracy, safety and EMC appropriate to function","requirement_route":"Network/contract/technical evidence","source_ids":["GRID","STANDARD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"STRUCTLOAD":{"id":"STRUCTLOAD","reference":"AS/NZS 1170.0/.1/.2 and AS 1170.4","purpose":"Structural loads and load combinations","trigger":"Wind, imposed load and earthquake design for actual site; AS/NZS 1170.2:2021 amendments and AS 1170.4:2024 are relevant current references","requirement_route":"Building/structural design as adopted","source_ids":["STRUCT","STANDARD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"STEEL":{"id":"STEEL","reference":"AS 4100:2020; AS/NZS 5131:2016; AS/NZS 4600:2018 where cold-formed","purpose":"Steel design, fabrication and erection","trigger":"Steel supporting structure and applicable fabrication category","requirement_route":"Structural design/building acceptance","source_ids":["STD-STEEL"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ALUMINIUM":{"id":"ALUMINIUM","reference":"AS/NZS 1664.1:1997 or AS/NZS 1664.2:1997","purpose":"Aluminium limit-state or allowable-stress design","trigger":"Aluminium structural racking; select design method","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-ALUMINIUM"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"CONCRETE":{"id":"CONCRETE","reference":"AS 3600:2018","purpose":"Concrete structures","trigger":"Concrete foundations and reinforced structures","requirement_route":"Structural/building design","source_ids":["STD-CONCRETE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ANCHOR":{"id":"ANCHOR","reference":"AS 5216:2026","purpose":"Fastenings to concrete design","trigger":"Post-installed/cast-in fasteners within scope; preserve adopted editions","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-ANCHOR"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"GALV":{"id":"GALV","reference":"AS/NZS 4680:2025","purpose":"Hot-dip galvanised fabricated ferrous products","trigger":"Specified galvanised steel and corrosion protection","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-GALV"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ICT":{"id":"ICT","reference":"AS/NZS 62368.1:2026","purpose":"Audio/video and ICT equipment safety","trigger":"ICT controller/gateway product in scope","requirement_route":"Electrical product safety/classification and accepted-edition selection","source_ids":["STD-ICT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"CYBERTECH":{"id":"CYBERTECH","reference":"IEC 62443-4-1:2018","purpose":"Secure industrial-product development lifecycle","trigger":"Industrial automation cybersecurity specification","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-CYBERTECH"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"METERSTD":{"id":"METERSTD","reference":"IEC 62052 / IEC 62053 applicable parts; NMI pattern requirements","purpose":"Electricity-meter safety/accuracy and Australian trade approval","trigger":"Select AC/DC meter and accuracy class; trade-use NMI route is separate","requirement_route":"Trade measurement and market rules where applicable","source_ids":["METER","NER"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"REFRIG":{"id":"REFRIG","reference":"AS/NZS 5149 Parts 1–4:2016; AS/NZS ISO 817:2016","purpose":"Refrigeration-system safety and refrigerant classification","trigger":"Refrigerant type, charge, toxicity/flammability and location","requirement_route":"WHS/building/refrigeration design where adopted","source_ids":["STD-REFRIG"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HP":{"id":"HP","reference":"AS/NZS 60335.2.40:2025 with AS/NZS 60335.1","purpose":"Heat pumps, air conditioners and dehumidifiers","trigger":"Appliance safety scope and accepted certification edition","requirement_route":"Electrical product safety/class certificate if required","source_ids":["STD-HP"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"WATERHEAT":{"id":"WATERHEAT","reference":"AS/NZS 60335.2.21 / .2.35 with AS/NZS 60335.1","purpose":"Storage/instantaneous electric-water-heater safety","trigger":"Water-heater class; hybrid heat-pump product must be correctly classified","requirement_route":"Electrical product safety/class certification","source_ids":["CLASSES"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"SWHSTD":{"id":"SWHSTD","reference":"AS/NZS 2712:2007; AS/NZS 4234 as scheme-specified","purpose":"Solar/heat-pump water-heater assessment and energy modelling","trigger":"CER/STC-listed system and the scheme’s test/model specification","requirement_route":"Scheme eligibility plus applicable product requirements","source_ids":["SWH"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"SOLTHERM":{"id":"SOLTHERM","reference":"ISO 9806:2025","purpose":"Solar thermal collector test methods","trigger":"Collector thermal-performance/safety evidence","requirement_route":"Technical conformity or adopted scheme method","source_ids":["STD-SOLTHERM"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ACGEMS":{"id":"ACGEMS","reference":"AS/NZS 3823 applicable determination editions","purpose":"Air-conditioner energy performance testing","trigger":"GEMS product scope; ≤65 kW and >65 kW have separate determinations","requirement_route":"GEMS law","source_ids":["GEMSAC"],"edition_note":"For ≤65 kW, use Determination 2019 incorporated methods, including AS/NZS 3823.1.1:2012, .1.2:2012, .1.3:2005, .1.4:2012 and .1.5:2015 as applicable. Ground-loop products are excluded from that determination; do not infer universal heat-pump GEMS registration.","full_text_clause_audit":false},"MOTORGEMS":{"id":"MOTORGEMS","reference":"IEC 60034-1:2017; IEC 60034-2-1:2014; IEC 60034-30-1:2014","purpose":"GEMS three-phase motor classification, loss testing and efficiency","trigger":"Cage induction motor within Determination 2019; inspect integrated/submersible exclusions","requirement_route":"GEMS law","source_ids":["GEMSMOTOR"],"edition_note":"Legal test references are the determination’s incorporated editions; eligible alternative methods include IEEE 112:2004/2017. New IEC technical publications do not replace these automatically.","full_text_clause_audit":false},"FRIDGE":{"id":"FRIDGE","reference":"AS/NZS 60335.2.24:2025; appropriate commercial Part .2.89","purpose":"Refrigerating appliance safety","trigger":"Domestic versus commercial refrigeration scope","requirement_route":"Electrical product safety/class requirements","source_ids":["STD-FRIDGE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"COLDGEMS":{"id":"COLDGEMS","reference":"GEMS Refrigerated Cabinets Determination 2024 test methods","purpose":"Commercial cabinet energy efficiency","trigger":"Covered refrigerated cabinet; cold rooms and process plant require separate scope assessment","requirement_route":"GEMS law","source_ids":["GEMSCOLD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HEATELECT":{"id":"HEATELECT","reference":"AS/NZS 60335.1 + applicable heater-specific Part 2 / IEC 60204-1 for machinery","purpose":"Electric heating product safety","trigger":"Select space heater, immersion heater, furnace or industrial machine by actual design","requirement_route":"Electrical safety/classification and plant duties","source_ids":["CLASSES","EESSSELECT","WHS"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PUMP":{"id":"PUMP","reference":"AS/NZS 60335.2.41 with AS/NZS 60335.1, where covered","purpose":"Pump appliance safety","trigger":"Pump within regulator’s appliance definition; industrial pump may require another relevant standard","requirement_route":"Electrical product safety/class certificate","source_ids":["CLASSES","EESSSELECT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PUMPINT":{"id":"PUMPINT","reference":"IEC 60335-2-41:2024","purpose":"International pump safety","trigger":"Pump within international appliance scope; not an automatic substitute for nationally prescribed edition","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-PUMPINT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"DRINK":{"id":"DRINK","reference":"AS/NZS 4020:2018","purpose":"Products contacting drinking water","trigger":"Potable-contact materials/components","requirement_route":"WaterMark/plumbing acceptance when required","source_ids":["POTABLE","WATERMARK"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"PLUMBSTD":{"id":"PLUMBSTD","reference":"AS/NZS 3500 Parts 1–4:2025 — adopted edition","purpose":"Plumbing and drainage design","trigger":"Water services, sanitary plumbing, stormwater or heated water as applicable","requirement_route":"State plumbing/NCC adoption","source_ids":["PLUMB","WATERMARK"],"edition_note":"Use the version adopted by the applicable state/NCC and approval date; catalogue publication alone is not legal adoption.","full_text_clause_audit":false},"FILTER":{"id":"FILTER","reference":"AS 3497:2021","purpose":"Drinking-water treatment systems","trigger":"WaterMark schedule treatment system","requirement_route":"WaterMark certification if scheduled","source_ids":["STD-FILTER"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"TANK":{"id":"TANK","reference":"AS/NZS 4766:2020 + Amendment 1:2024","purpose":"Polyethylene storage tanks for water/chemicals","trigger":"Polyethylene tank within scope; potable use also needs material assessment","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-TANK"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"FLOW":{"id":"FLOW","reference":"AS 4747 applicable non-urban water-metering parts; NMI trade rules","purpose":"Water-meter performance/installation","trigger":"Non-urban water extraction licence or trade measurement","requirement_route":"Water licence/trade-measurement conditions","source_ids":["WATER","METER"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"WELSSTD":{"id":"WELSSTD","reference":"AS/NZS 6400:2016 — WELS requirements","purpose":"Water-efficiency rating/labelling","trigger":"Covered WELS product class; not all pumps, tanks or irrigation products","requirement_route":"WELS registration and label law","source_ids":["WELS"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"TOOLSSTD":{"id":"TOOLSSTD","reference":"AS/NZS 62841.1:2026 + tool-specific part","purpose":"Hand-held, transportable and garden power-tool safety","trigger":"Actual powered tool type and regulatory class","requirement_route":"Electrical safety/class certificate and WHS","source_ids":["CLASSES","EESSSELECT","STD-TOOLSSTD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"TESTSAFE":{"id":"TESTSAFE","reference":"IEC 61010-1:2010 + Amendment 1:2016","purpose":"Measurement/control/laboratory equipment safety","trigger":"Test instrument, diagnostic tester and applicable national deviations","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-TESTSAFE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"TESTCIRCUIT":{"id":"TESTCIRCUIT","reference":"IEC 61010-2-030:2023","purpose":"Equipment with testing/measuring circuits","trigger":"Instrument connected to testing/measuring circuit; correct measurement category","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-TESTCIRCUIT"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"INSTALLTEST":{"id":"INSTALLTEST","reference":"IEC 61557-1:2019 + function-specific parts","purpose":"Electrical installation safety-test instruments","trigger":"Insulation, loop, bonding, RCD or related tester function","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-INSTALLTEST"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"VERIFY":{"id":"VERIFY","reference":"AS/NZS 3017:2022","purpose":"Electrical installation verification","trigger":"Inspection/commissioning test methods","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-VERIFY"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"INUSE":{"id":"INUSE","reference":"AS/NZS 3760:2022","purpose":"In-service inspection/testing of electrical equipment","trigger":"Workplace in-service equipment duty; not original product approval","requirement_route":"Installation/design rule where legally adopted; otherwise contract or technical conformity","source_ids":["STD-INUSE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"CONSTRUCT":{"id":"CONSTRUCT","reference":"AS/NZS 3012:2019","purpose":"Construction/demolition electrical installations","trigger":"Construction worksite","requirement_route":"Installation/workplace law where adopted","source_ids":["INSTALL","STANDARD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"GLOVE":{"id":"GLOVE","reference":"IEC 60903:2014","purpose":"Electrical insulating gloves","trigger":"Voltage-class-specific insulating protection","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-GLOVE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"EYE":{"id":"EYE","reference":"AS/NZS 1337.1:2010","purpose":"Occupational eye/face protection","trigger":"Eye protection for actual impact and exposure","requirement_route":"WHS suitability evidence; not a universal government product certificate","source_ids":["STD-EYE"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HEADHAND":{"id":"HEADHAND","reference":"AS/NZS 1801; AS/NZS 2161 applicable parts; AS/NZS 2210 applicable parts","purpose":"Head, hand and foot protective equipment","trigger":"Select electrical, mechanical, thermal and chemical duty; footwear selection AS/NZS 2210.1:2025","requirement_route":"WHS/OHS suitability","source_ids":["STD-HEADHAND"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"FALL":{"id":"FALL","reference":"AS/NZS 1891.1:2020; AS/NZS 1891.4:2025","purpose":"Fall-arrest equipment and selection/maintenance","trigger":"Height work and compatible fall-arrest system","requirement_route":"WHS/OHS risk control","source_ids":["STD-FALL"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"RESP":{"id":"RESP","reference":"AS/NZS 1716:2012; AS/NZS 1715:2009 and adopted successor parts","purpose":"Respiratory devices and selection/use","trigger":"Respiratory exposure; monitor phased ISO transition toward 2030","requirement_route":"WHS/OHS suitability","source_ids":["STD-RESP"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"HEARING":{"id":"HEARING","reference":"AS/NZS 1270 — applicable accepted edition","purpose":"Hearing protection","trigger":"Noise risk assessment and attenuator selection","requirement_route":"WHS/OHS suitability","source_ids":["STD-HEARING"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"SIGN":{"id":"SIGN","reference":"AS 1319:1994; AS/NZS 3000 / AS/NZS 5033 / AS/NZS 5139 required markings","purpose":"Safety signs and electrical asset labels","trigger":"Select by hazard and the installed equipment standard, not a generic sign pack","requirement_route":"Installation/WHS information duty","source_ids":["WIRING","INSTALL","STANDARD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"WOOD":{"id":"WOOD","reference":"ISPM 15 and Australian BICON conditions","purpose":"Timber packaging pest treatment/marking","trigger":"Solid timber packaging/dunnage imported into Australia","requirement_route":"Biosecurity import conditions","source_ids":["WOOD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"ACSPD":{"id":"ACSPD","reference":"IEC 61643-11:2025","purpose":"AC surge-protective devices","trigger":"AC supply surge protection","requirement_route":"Technical conformity / project specification; mandatory only when adopted by the applicable rule","source_ids":["STD-ACSPD"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false},"RCD":{"id":"RCD","reference":"AS/NZS 3190 / AS/NZS 61008.1; AS 3111 / AS/NZS 61009.1 as class specifies","purpose":"Residual-current devices with or without overcurrent protection","trigger":"Select the current regulator-defined RCCB/RCBO class and accepted edition","requirement_route":"Electrical safety/class certificate","source_ids":["CLASSES"],"edition_note":"Use the edition accepted by the applicable regulator, scheme or contract; include required amendments and transition dates.","full_text_clause_audit":false}},"supply_gates":[{"id":"G01","title":"Define the Australian product and accountable supplier","trigger":"All market-entry assessments","actions":"Record legal Australian/NZ entity where the scheme requires one; brand/model, factory, BOM/firmware, voltage, output, chemistry, rated duty and intended use. Separate bare component, appliance, machine and complete installed system.","authority":"Australian importer/responsible supplier; relevant state regulator","source_ids":["ACL","EESS","EESSSELECT"]},{"id":"G02","title":"Electrical equipment approval and RCM","trigger":"Electrical equipment supplied in Australia; EESS in-scope and declared class determined from actual voltage/use","actions":"Apply the EESS classification rules and local jurisdiction law. In-scope broadly covers household/similar equipment greater than 50 V AC or 120 V ripple-free DC and not more than 1,000 V AC or 1,500 V DC respectively; exclusions and equipment definitions control. For EESS Level 1 retain compliance evidence and register supplier; Level 2 register product and compliance folder; Level 3 obtain recognised CoC and register product. Out-of-scope industrial equipment still has statutory safety duties. NSW/WA local requirements must be checked.","authority":"State electrical regulator; recognised RECS where required; EESS registration","source_ids":["EESS","CERT","CLASSES","EESSSELECT"]},{"id":"G03","title":"ACMA EMC, radio and telecommunications","trigger":"Electrical/electronic apparatus, radio transmitter or telecom equipment covered by an ACMA standard","actions":"Select ACMA applicable standard, risk/evidence level, labelling and responsible-supplier record obligations. Keep supplier declaration, test reports and technical documentation. Establish authorised radio bands/licences; foreign CE/FCC reports need Australian scope assessment.","authority":"ACMA; scoped testing laboratory; responsible supplier","source_ids":["ACMA","ACMA2"]},{"id":"G04","title":"Import and material controls","trigger":"Imported goods, packaging or industrial chemicals","actions":"Classify tariff/customs documents; ensure prohibited asbestos is absent with evidence proportionate to materials and source. Check DAFF/BICON conditions for used/soil-contaminated plant and solid timber packaging. Assess AICIS registration for introduced industrial chemicals; ordinary articles without intended chemical release can be outside chemical introduction rules. Refrigerant equipment imports have separate DCCEEW licensing conditions.","authority":"ABF; DAFF/Biosecurity; AICIS; DCCEEW","source_ids":["ASBESTOS","WOOD","AICIS","REFRIG2"]},{"id":"G05","title":"Consumer safety, warranty and supply claims","trigger":"Advertising/supply; special mandatory safety standards where product class applies","actions":"Substantiate efficiency, origin, renewable and compliance claims. Use Australian Consumer Law-compliant warranty/consumer guarantees. Assess button/coin battery mandatory product/packaging/information requirements if present; keep recall/incident response and Australian contact records.","authority":"ACCC Product Safety and state consumer regulators","source_ids":["ACL","ACTACL","WARRANTY","BUTTON","RECALL"]},{"id":"G06","title":"Energy/water efficiency and scheme listings","trigger":"A GEMS or WELS covered product; CER/STC or other scheme eligibility claimed","actions":"Determine product scope and exclusions against the exact determination. Register covered models before supply and apply required labels. For CEC/CER products verify current model list, certificate scope and expiry; listing is scheme eligibility and is distinct from electrical safety approval.","authority":"GEMS Regulator; WELS Regulator; CER; CEC product program","source_ids":["GEMS","WELS","CEC","SWH","PV","BAT","INV"]},{"id":"G07","title":"Plant, pressure, gas and hazardous-area duties","trigger":"Machinery, pressure equipment, gas appliance/plant or classified explosive atmosphere","actions":"Supply risk assessment and safe-install/use/maintenance data. Determine design/item registrations separately with the state WHS/OHS regulator; pressure hazard level and local exclusions control. Obtain state gas appliance acceptance where required. Match Ex certificates to exact equipment, zone/group/temperature and installation.","authority":"State WHS/OHS and gas regulators; design verifier; IECEx body as accepted","source_ids":["WHS","SAFELAWS","DESIGNPLANT","ITEMPLANT","GASTYPE","IECEX","H2"]},{"id":"G08","title":"Battery/fuel transport","trigger":"Dangerous goods offered for road/rail, sea or air transport","actions":"Determine UN number, packing instruction, state of charge and mode-specific restrictions; retain lithium test summary where required. Use ADG state-adopted road/rail rules, IMDG/AMSA sea rules and ICAO/CASA air rules, plus carrier acceptance. Damaged/prototype batteries need separate assessment.","authority":"State DG transport regulator; AMSA; CASA; carrier","source_ids":["UN","ADG","SEA","AIR"]},{"id":"G09","title":"Digital product security and data","trigger":"In-scope consumer smart device manufactured on/after 4 March 2026; privacy rules where entity/activity falls in scope","actions":"Meet Cyber Security Act 2024 / Security Standards for Smart Devices Rules 2025, including default-password, vulnerability-reporting and support-period requirements and statement of compliance. Assess Privacy Act 1988 obligations separately; industrial cybersecurity standards support assurance but are not universally mandatory.","authority":"Home Affairs; OAIC; ACMA for radio","source_ids":["CYBER","PRIVACY"]},{"id":"G10","title":"Project permissions and professional installation","trigger":"Actual project, fixed wiring/plumbing, grid interface or land/resource use","actions":"Resolve state/site/DNSP, adopted NCC/installation edition, installer licence, network permission, planning/environment/fire, water/resource and plant requirements. Obtain AEMO registration or exemption where applicable. Product certificates do not authorise the site design.","authority":"Licensed trades/registered engineer; council/building certifier; network/AEMO; state environment/water/fire authority","source_ids":["INSTALL","WIRING","STRUCT","GRID","NER","ENV","WATER"]}],"certification_routes":[{"role":"Electrical product certificate","organisation":"State electrical regulator or currently recognised EESS RECS certifier","examples":"CBA; EESS Conformity Certification Services; Global-Mark; UL International New Zealand; SAA Approvals; OzCert; SGS Australia; TÜV Rheinland Australia (check current recognition/scope)","what_it_does":"Issues recognised electrical certificates within authorised scope; importer must still register and meet ACMA/local law.","source_ids":["CERT"]},{"role":"Laboratory evidence","organisation":"NATA-accredited ISO/IEC 17025 laboratory or scheme-accepted overseas laboratory","examples":"Select from the live laboratory scope, not accreditation logo alone.","what_it_does":"Tests/calibrates named methods; NATA is the accreditor, not the product approval office.","source_ids":["NATA","LAB"]},{"role":"Certification-body accreditation","organisation":"JAS-ANZ / relevant scheme accreditation","examples":"Check certification scope and scheme recognition.","what_it_does":"Accredits bodies; it does not replace the product certificate or regulator registration.","source_ids":["LAB"]},{"role":"PV/inverter/battery scheme listing","organisation":"Clean Energy Council product program; Clean Energy Regulator for scheme eligibility","examples":"IEC/IECEE route accepted by CEC; CER listed hot-water systems.","what_it_does":"Assesses listing evidence; does not authorise building, electrical, gas or network installation. Solar Accreditation Australia installer accreditation is separate from SAA Approvals product certification.","source_ids":["CEC","PV","INV","BAT","SWH"]},{"role":"WaterMark certification","organisation":"ABCB-listed WaterMark conformity assessment body","examples":"Use current WMCAB directory and certification scope.","what_it_does":"Certifies scheduled plumbing products. ABCB administers scheme; potable test report alone is not WaterMark certificate.","source_ids":["WMBC","WMSCHEDULE"]},{"role":"GEMS / WELS registration","organisation":"GEMS Regulator / WELS Regulator","examples":"Energy Rating registration; Water Rating registration.","what_it_does":"Registers covered models and oversees mandated efficiency/labels; separate electrical safety approval may apply.","source_ids":["GEMS","WELS"]},{"role":"Trade meter approval","organisation":"National Measurement Institute and authorised verifier","examples":"Pattern approval, verification and applicable energy-market metering actors.","what_it_does":"Confirms prescribed trade-measurement route; ordinary monitoring meter and trade meter differ.","source_ids":["METER","NER"]},{"role":"Ex equipment","organisation":"Accepted IECEx certification body; state electrical/gas/WHS authority","examples":"Use official IECEx body and certificate directories and actual equipment scope.","what_it_does":"Certificates cover defined model/protection; site classification and installation still need competent assessment.","source_ids":["IECEX","H2"]},{"role":"Wind conformity","organisation":"Scheme/contract-accepted wind certifier, including appropriate IECRE route","examples":"Check component/type/project certificate and site design envelope.","what_it_does":"Assesses specified wind design/equipment; project permissions and network acceptance are separate.","source_ids":["IECRE","WIND"]},{"role":"Pressure plant registration","organisation":"State WHS/OHS regulator; independent competent design verifier","examples":"Design registration and item registration are separate.","what_it_does":"Registers applicable designs/items against threshold rules; no universal import certificate for every vessel.","source_ids":["DESIGNPLANT","ITEMPLANT","SAFELAWS"]},{"role":"Gas appliance/plant acceptance","organisation":"Relevant state gas technical regulator and accepted gas certification/assessment route","examples":"Type A, Type B and hydrogen routes differ by jurisdiction.","what_it_does":"Provides locally required product/installation acceptance; overseas approval alone may not suffice.","source_ids":["GASTYPE","GASFUELCELL","H2"]},{"role":"Project installation and design","organisation":"Licensed electrical/plumbing/refrigeration contractor; appropriately registered engineer; building certifier; network","examples":"Australian Refrigeration Council/DCCEEW licensing where applicable; council/EPA/water/fire permissions.","what_it_does":"Designs, installs and approves the actual site within professional and regulator scope.","source_ids":["INSTALL","ARC","STRUCT","GRID","ENV","WATER"]}],"scope_statement":"Covers the 18 categories and 133 subcategories visible in the RRE proposed master taxonomy v2.0. Includes supply/import requirements and the principal installation, network, scheme and project triggers. This is not a claim to identify every law for every possible future product or site. Actual required parts and accepted editions are determined by the explicit conditions, equipment definitions and product/site facts.","assessment_limits":["Public regulator guidance and official publisher catalogues were checked; licensed standard clauses have not been audited in full. Obtain the applicable full texts for certification/design.","The live proposed RRE taxonomy was used, not an independently supplied internal category register. New or different register entries require mapping.","Equipment not fully specified cannot be individually approved. Use the supplied classification and standard-selection routes to resolve its model, class, chemistry, capacity and location.","Current product listing/registration/certificate status and local adoption must be rechecked at the offer, purchase and installation dates.","Technical standards without a stated legislative, scheme or contract trigger are conformity references, not asserted universal mandatory laws."],"supplier_evidence_record_fields":["supplier_legal_entity","Australian_responsible_supplier","category_id","subcategory_id","brand","model","factory","BOM_revision","firmware","intended_use","voltage_current_power_capacity","chemistry_refrigerant_fuel","state_site_network","equipment_class_and_basis","accepted_standard_parts_editions","test_report_numbers_and_lab_scope","certificate_numbers_issuer_scope_expiry","registration_listing_ids_status","Australian_labels_declarations","instructions_and_risk_assessment","UN38_test_summary_and_transport_class","import_material_and_packaging_evidence","reviewer_and_date","project_approval_ids","change_control_and_reassessment"]}